Skip to content
Policies Updated October 14, 2026

PM Surya Ghar

Quick Definition

PM Surya Ghar Muft Bijli Yojana is the Government of India's central rooftop solar subsidy scheme launched in February 2024. It aims to install rooftop solar at 10 million Indian homes by 2027, with central subsidies of up to ₹78,000 for a 3 kW system.

Quick Facts

Term
PM Surya Ghar
Category
Policies
Industry
Government Solar Scheme
Primary Use
Subsidising residential rooftop solar
Common Users
Indian residential customers, DISCOMs, installers, EPCs
Standards
MNRE scheme guidelines, ALMM, CEA Smart Meter Regulations 2023
Related Technologies
PV modules, inverters, net meters, rooftop mounting structures

ALMM and inverter compliance: MNRE’s current ALMM page publishes solar PV module and cell lists, not an inverter list. Verify the inverter’s exact model documents and applicable scheme or DISCOM requirements separately.

What is PM Surya Ghar Muft Bijli Yojana

PM Surya Ghar Muft Bijli Yojana is the Government of India’s flagship residential rooftop solar subsidy scheme. Launched on 13 February 2024 by Prime Minister Narendra Modi, it aims to install rooftop solar at 10 million Indian homes by 2027 and to provide up to 300 kWh of free electricity per month to participating households.

The scheme provides central financial assistance directly to residential customers, ranging from ₹30,000 for a 1 kW system to ₹78,000 for systems of 3 kW and above. Implementation runs through the National Portal (pmsuryaghar.gov.in), with DISCOMs and empanelled vendors handling installation and commissioning.

PM Surya Ghar replaces and expands the earlier Grid Connected Rooftop Solar Programme Phase II. The total scheme outlay is approximately ₹75,000 crore over the implementation period.

PM Surya Ghar explained simply

The government will pay up to ₹78,000 toward the cost of a rooftop solar system at your home. You apply online, pick an approved installer, get the system installed and connected to the grid through a net meter, and the subsidy lands in your bank account afterwards. The system then offsets your monthly bill, often to zero or near zero, for the next 25 years, provided the on grid inverter is correctly commissioned.

For a typical Indian middle-class home with a 3 kW system, the math works out to a payback period of three to four years and roughly 25 years of largely free electricity after that.

Why PM Surya Ghar matters

Capex reduction. The subsidy cuts upfront cost by 35 to 50 percent for typical residential systems.

Scale. The 10 million household target is roughly 30 GW of distributed solar by 2027, comparable to a few years of utility-scale capacity addition.

DISCOM standardisation. The scheme forces standard processes, smart meter rollout and net metering across states.

Climate contribution. 30 GW residential solar avoids approximately 50 million tonnes of CO2 annually.

Energy bill relief. Households get up to 300 kWh per month free, reducing energy poverty for lower-income segments.

How the application process works

For a screen-by-screen walkthrough of the portal itself, see PM Surya Ghar apply online guide.

  1. Register on pmsuryaghar.gov.in with mobile number, electricity bill and Aadhaar. Keep the documents required for PM Surya Ghar ready before starting, since an incomplete upload is the most common reason applications stall at step one.
  2. Submit application with sanctioned load, roof area and basic site details.
  3. DISCOM reviews technical feasibility and approves capacity.
  4. Customer selects an empanelled vendor from the portal list.
  5. The empanelled vendor installs the system.
  6. DISCOM installs a bidirectional meter, completes commissioning and issues commissioning report.
  7. Customer uploads commissioning report and bank details on portal.
  8. MNRE disburses subsidy by direct bank transfer within 30 days.

Technical deep dive

Subsidy slabs (residential)

PM Surya Ghar central subsidy slabs for residential systems
System sizeCentral subsidy
1 kW₹30,000
2 kW₹60,000
3 kW and above₹78,000

State subsidies may be added on top in some states.

₹020,00040,00060,00080,0001 kW2 kW3 kW and above₹30,000₹60,000₹78,000₹020,00040,00060,00080,0001 kW2 kW3 kW andabove₹30,000₹60,000₹78,000
PM Surya Ghar central subsidy by residential system size
ItemValue (₹)
1 kW₹30,000
2 kW₹60,000
3 kW and above₹78,000
PM Surya Ghar central subsidy by residential system sizeSource: PM Surya Ghar Muft Bijli Yojana scheme guidelines, MNRE, as listed in the subsidy slabs aboveCentral assistance only; state subsidies may be added. Confirm current slabs on pmsuryaghar.gov.in.

Group housing subsidy

For RWA and group housing common-area systems: ₹18,000 per kW up to 500 kW capacity.

Eligible equipment

  • PV modules: ALMM Model List of Modules, current revision
  • Meter: DISCOM-approved bidirectional smart meter

Typical system economics (3 kW Indian home)

Typical economics of a 3 kW Indian home system under PM Surya Ghar
ItemApproximate
Gross capex₹1,65,000
Subsidy₹78,000
Net capex₹87,000
Annual generation4,200 kWh
Bill saving (at ₹8/kWh)₹33,600 per year
Payback period2.5 to 3 years
25-year savings₹7.5 to 10 lakh

Real-world applications

Independent residential solar houses, 1 to 10 kW range.

RWA and group housing societies with common-area solar.

Government residential colonies and PSU townships.

Defence married quarters and PSU housing.

Rural pucca houses with electricity connection.

Tier 2 and 3 city installations driven by lower retail tariffs but high temperatures.

Advantages

Substantial subsidy reducing payback to under 4 years.

Standardised application portal across states.

Mandatory ALMM compliance for modules ensures module quality.

Net metering coordination built into the workflow.

Bank loan availability through partner banks at concessional rates.

Long-term warranty backed by central scheme.

Limitations

Subsidy capped at 3 kW equivalent, even for larger systems.

Empanelled vendor list can be limited in remote districts.

Implementation pace varies by DISCOM, with some states still lagging on net metering and smart meter rollout.

Battery storage not subsidised.

Tenants not directly eligible.

Hybrid and ground-mount systems eligible only as grid-tie configurations.

Common problems

DISCOM technical feasibility delay. The most common bottleneck in the process.

Smart meter procurement lag. Some districts wait 2 to 3 months for bidirectional meters.

Empanelled vendor unavailability in tier 3 and 4 towns.

Bank account mismatch between portal and DISCOM records.

Subsidy disbursement delay beyond the stated 30-day window.

Non-ALMM modules installed by mistake, voiding subsidy.

Society NOC complications for individual flat owners.

Best practices

Photograph commissioning seal numbers on the smart meter.

Keep all invoices and DISCOM correspondence for at least three years.

Audit the first three bills against expected generation.

Plan installation in October to January for fastest commissioning in most states.

Comparison: PM Surya Ghar vs prior schemes

Households sometimes confuse the residential rooftop scheme with the agricultural pump scheme it is often mentioned alongside, PM-KUSUM; see PM Surya Ghar vs Kusum Yojana for how the two differ in eligibility and subsidy structure.

PM Surya Ghar compared with Phase II RTS and PM-KUSUM
FeaturePM Surya GharPhase II RTSPM-KUSUM
Target segmentResidentialResidentialAgricultural
Subsidy₹30k to 78k20 to 40% capex30 to 60% capex
Net meteringRequiredRequiredNot applicable
Target capacity30 GW by 20274 GW residential35 GW agri solar
Application portalCentralisedDISCOM-ledCentral plus state

Indian market context

The scheme is implemented through DISCOMs as the primary executing agency. State Renewable Energy Development Agencies (SRDAs) support coordination in some states.

Empanelled vendor lists are maintained per district. The portal updates daily.

The Ministry of Power and MNRE jointly oversee implementation. The Prime Minister’s Office tracks state-wise progress monthly.

Bank loan partnerships with SBI, Canara Bank, PNB, BoB and others offer concessional financing for the customer share of capex.

PM Surya Ghar dovetails with the smart meter rollout under RDSS. Districts with smart meter coverage above 80 percent see fastest commissioning.

Standards and certifications

Standards and documents relevant to PM Surya Ghar
StandardScope
MNRE Scheme GuidelinesPM Surya Ghar framework
MNRE ALMMModule eligibility
CEA Smart Meter Regulations 2023Meter standards
State SERC net metering regulationsBilling framework
IS 16221Inverter safety
IS 14286PV module standard
BIS certificationEquipment quality

Common mistakes

Common PM Surya Ghar mistakes and their consequences
MistakeConsequence
Engaging a non-empanelled vendor expecting subsidySubsidy is denied
Buying non-ALMM modules to save costSubsidy is denied
Skipping the DISCOM technical feasibility stepApplication is rejected
Installing before the portal registrationSubsidy may be denied
Missing the commissioning report uploadSubsidy disbursement stalls
Ignoring smart meter installationSystem runs but credits are not recorded
Submitting wrong bank account detailsDisbursement fails

Key takeaways

PM Surya Ghar Muft Bijli Yojana is India’s most significant residential rooftop solar scheme to date, with central subsidy up to ₹78,000 and a target of 10 million homes by 2027. Successful execution depends on the centralised portal, empanelled vendors, ALMM-listed modules, smart meter installation and DISCOM coordination. Typical payback under the scheme is 2.5 to 4 years.

Further reading

For how PM Surya Ghar plays out in real projects, these guides go deeper:

Sources

  • PM Surya Ghar Muft Bijli Yojana scheme guidelines, Ministry of New and Renewable Energy, Government of India.

  • National Portal for Rooftop Solar, pmsuryaghar.gov.in, MNRE.

  • CEA Smart Meter Regulations 2023, Central Electricity Authority of India.

  • Press Information Bureau releases on scheme launch and progress, Government of India.

  • State DISCOM rooftop solar guidelines and empanelment lists.

  • State Electricity Regulatory Commission net metering regulations.

  • IS 16221 and IS 14286, Bureau of Indian Standards.

  • Ministry of Power and MNRE annual reports.

Apply this term

FAQ

Frequently Asked Questions

What is PM Surya Ghar Muft Bijli Yojana?
A central government scheme launched in February 2024 to subsidise rooftop solar for 10 million Indian residential customers by 2027, with grants of up to ₹78,000 per household.
How much subsidy does PM Surya Ghar provide?
₹30,000 for 1 kW, ₹60,000 for 2 kW, and ₹78,000 for 3 kW or larger. The subsidy is capped at ₹78,000 per household regardless of system size.
Who is eligible for PM Surya Ghar?
Indian residential electricity customers with their own house or society no-objection certificate, valid sanctioned load, and a DISCOM connection. Tenants are not directly eligible.
How do I apply for PM Surya Ghar subsidy?
Through the national portal at pmsuryaghar.gov.in. Register, get DISCOM technical feasibility approval, install through an empanelled vendor, complete net metering, and receive subsidy by direct bank transfer.
What is the typical capex for a 3 kW PM Surya Ghar system?
Approximate 2026 prices: ₹1.50 lakh to ₹1.80 lakh before subsidy. Net cost after ₹78,000 subsidy is ₹72,000 to ₹1.02 lakh.
How long does PM Surya Ghar approval take?
Target is 30 days from application to commissioning. Actual times range from 30 to 90 days depending on DISCOM and district.
Can I get subsidy for a hybrid inverter under PM Surya Ghar?
PM Surya Ghar assistance is calculated on the rated capacity of the solar modules, not on the inverter type. MNRE publishes no ALMM list for inverters, so a hybrid inverter is not excluded on that ground, but it must meet the scheme's technical specification and the DISCOM must accept the connection for net metering. Confirm the current rules with your DISCOM or the PM Surya Ghar portal before buying.
Is PM Surya Ghar only for new connections?
No. Existing residential connections can apply as long as they have a valid DISCOM account and sanctioned load.
What documents are needed for PM Surya Ghar?
Electricity bill, Aadhaar, PAN, bank account details, ownership document or society NOC, photographs of roof, and DISCOM technical feasibility approval.
Does PM Surya Ghar guarantee free electricity?
Up to 300 kWh per month free for households installing 3 kW solar, based on typical generation in Indian conditions. Surplus and shortfall are settled through net metering.
Can I install solar through any vendor?
Only DISCOM-empanelled vendors are eligible for PM Surya Ghar subsidy disbursement. The portal lists empanelled vendors by state and district.
Is the subsidy transferred to the vendor or the customer?
Directly to the customer's bank account after commissioning. Vendor invoices the full amount, customer pays full amount, subsidy is reimbursed by MNRE to the customer.
What is the warranty period under PM Surya Ghar?
Mandatory: 5 years comprehensive maintenance, 10 years inverter warranty, 25 years panel performance warranty. EPC vendor provides the guarantee.
Can I expand my PM Surya Ghar system later?
Yes, but additional capacity is not eligible for further subsidy. Subsidy applies once per household.
What states are most active under PM Surya Ghar?
Gujarat, Maharashtra, Uttar Pradesh, Rajasthan, Andhra Pradesh and Karnataka are the highest-volume states. Implementation pace varies by DISCOM readiness.
Nirav Dhanani
Written by
Nirav Dhanani · CEO

Co-founder & CEO driving Qbits Energy's product strategy and growth across India.

Continue researching this solar decision

Use the related definitions and guides to check the assumptions, sources and requirements for your project.