ALMM and inverter compliance: MNRE’s current ALMM page publishes solar PV module and cell lists, not an inverter list. Verify the inverter’s exact model documents and applicable scheme or DISCOM requirements separately.
Homeowners in Uttar Pradesh asking about rooftop solar in 2026 face a situation that is more financially compelling (and more operationally complex) than in almost any other Indian state. The electricity bills are high, the grid is unreliable across large rural and semi-urban stretches, and the subsidy stack available through PM Surya Ghar and UPNEDA is substantial. A 3 kW system in Lucknow can qualify for ₹78,000 in central subsidy alone, and UPNEDA state incentives can add further savings. What most homeowners do not know is that UP’s frequent power cuts make the choice between an on-grid and a hybrid inverter a genuinely consequential decision, one that changes both your daily energy security and your long-term financial return.
This guide covers the full picture: the PM Surya Ghar central subsidy slabs, the UPNEDA state scheme, all four UP DISCOMs, net metering in UP, and a worked example from a Lucknow homeowner, so you can go from reading to applying with a clear checklist.
UP’s solar subsidy in 2026 uses three layers. The central PM Surya Ghar scheme pays ₹78,000 for a 3 kW system via direct bank transfer. UPNEDA administers a state top-up, verify the current slab at upneda.org.in. And UP’s grid reality means hybrid inverters often deliver better value than on-grid despite higher upfront cost, especially outside major cities. Together, these three factors define the UP Solar Subsidy Stack.
Uttar Pradesh is India’s most populous state and one of its most energy-stressed. Average per-capita electricity consumption remains below the national average, yet residential tariffs on the LMV-1 slab have risen steadily year-on-year. The combination of rising bills, heavy diesel generator expenditure to compensate for outages, and now a nationally-funded subsidy programme worth up to ₹78,000 per household makes 2026 a turning point for rooftop solar adoption across the state.
What Is the Solar Subsidy in UP: Central and State Schemes Explained
Uttar Pradesh homeowners in 2026 can access two distinct solar subsidy programmes simultaneously. Understanding both from the outset prevents the most common mistake: completing only one application and missing the other.
The Central Scheme, PM Surya Ghar Muft Bijli Yojana
Launched in February 2024 by the Government of India and administered through pmsuryaghar.gov.in, PM Surya Ghar is the largest residential rooftop solar subsidy in Indian history. It is available to any residential electricity consumer in India (including in UP) whose property is grid-connected and whose proposed solar system uses ALMM-listed equipment installed by a DISCOM-empanelled vendor. The subsidy is disbursed as a direct bank transfer after the DISCOM completes commissioning inspection. For a comprehensive national overview of the scheme including eligibility, documentation, and the five-step application process, the PM Surya Ghar complete guide is the authoritative reference.
The State Scheme, UPNEDA Rooftop Solar Programme
UPNEDA (UP New and Renewable Energy Development Agency) is the state nodal agency for renewable energy in Uttar Pradesh, operating under the UP government’s energy department. UPNEDA administers the state-level incentive component on top of the central PM Surya Ghar subsidy. The exact per-kW state top-up amount is updated annually; verify current-year rates on the UPNEDA portal or at your district UPNEDA office, as amounts can change mid-year and vary by consumer category.
The two schemes run through slightly different channels (national portal for the central subsidy, UPNEDA/DISCOM channel for the state component) but a competent empanelled installer handles the coordination. Your job is to confirm both applications have been filed and both portal statuses are being tracked independently.
| Feature | PM Surya Ghar (Central) | UPNEDA Scheme (State) |
|---|---|---|
| Administered by | MNRE / National Portal | UPNEDA / UP DISCOMs |
| Application portal | pmsuryaghar.gov.in | upneda.org.in |
| Subsidy for 3 kW | ₹78,000 (fixed nationally) | Check UPNEDA portal for latest |
| Disbursement method | Direct bank transfer | Direct bank transfer / DISCOM credit |
| ALMM requirement | Mandatory | Mandatory |
| Empanelled vendor | DISCOM-empanelled | UPNEDA-registered |
| Net metering | Required post-installation | Required post-installation |
| Timeline to receive | Commonly reported as about 30 days after commissioning (confirm on the portal) | Check UPNEDA |
₹78,000. The maximum central PM Surya Ghar subsidy for a 3 kW residential rooftop solar system in UP, paid as a direct bank transfer after DISCOM commissioning is complete. Source - PM Surya Ghar National Portal, MNRE, 2026.
The UP Solar Subsidy Stack: 3 Layers for Maximum Savings
Every UP homeowner evaluating rooftop solar should understand the full financial structure before sizing a system or selecting a vendor. This is the named framework that defines how savings compound in Uttar Pradesh.
The UP Solar Subsidy Stack Framework
The three-layer stack is specific to Uttar Pradesh’s combination of central policy, state incentives, and grid realities. Apply all three layers to calculate your true net cost.
-
Layer 1, Central PM Surya Ghar Subsidy: Fixed nationally at ₹30,000 per kW for the first 2 kW, and ₹18,000 for the third kilowatt (capped at 3 kW). Total: ₹78,000 for a 3 kW system. This is the largest single subsidy available and is identical across all UP DISCOMs and all Indian states. Full details on the slab structure are in the PM Surya Ghar subsidy amount guide.
-
Layer 2, UPNEDA State Top-Up: The UP government, through UPNEDA, provides an additional per-kW incentive for residential rooftop solar installations. This amount is updated annually and varies by consumer category. As of this writing, the UPNEDA portal lists incentive rates for residential systems, check upneda.org.in for the current-year slab before finalising your system size. If a state top-up is active, add it to the central subsidy to get your combined subsidy; this guide quotes no state amount because none could be verified.
-
Layer 3, Diesel Displacement and Grid-Failure Savings: This is the layer that is unique to UP and is frequently ignored in financial calculations. UP homeowners with generators spend money on diesel to compensate for power cuts: litres per month × 12 × the pump price (₹95 a litre in the worked example below). A hybrid solar system with a battery bank can displace part of this expenditure, and adding the annual diesel saving to the electricity bill saving shortens the payback, as the worked example below shows.
Applying all three layers transforms the financial analysis entirely. The UP homeowner who only accounts for Layer 1 and ignores diesel displacement understates the return; the worked example below shows by how much on its own inputs.
| System Size | MNRE benchmark cost | Central Subsidy | State top-up | Benchmark cost after central subsidy |
|---|---|---|---|---|
| 1 kW | ₹50,000 | ₹30,000 | Check UPNEDA | ₹20,000 |
| 2 kW | ₹1,00,000 | ₹60,000 | Check UPNEDA | ₹40,000 |
| 3 kW | ₹1,45,000 | ₹78,000 | Check UPNEDA | ₹67,000 |
| 5 kW | ₹2,35,000 | ₹78,000 | Check UPNEDA | ₹1,57,000 |
Costs are the MNRE benchmark (₹50,000 per kW for the first 2 kW and ₹45,000 per kW beyond, 13 February 2024), a reference for the subsidy and not a quote. No state top-up amount could be verified, so none is shown; confirm it on the UPNEDA portal. Payback depends on your tariff, system cost and any diesel displacement.
UP’s Four DISCOMs: Who You Apply To
Uttar Pradesh is served by four distribution companies, each with distinct geographic jurisdiction. Your electricity bill identifies your DISCOM, and that DISCOM owns your subsidy application, net metering approval, and smart meter installation. Processing culture, empanelled vendor lists, and timelines differ across the four.
Understanding your DISCOM before beginning the application process prevents the common mistake of filing with the wrong entity.
PVVNL: Pashchimanchal Vidyut Vitran Nigam Limited
Coverage: Meerut, Agra, Mathura, Aligarh, Saharanpur, Muzaffarnagar, Bareilly, and western UP districts
PVVNL serves the densely populated western UP region, including the economically active Meerut-Agra belt. This zone sees significant rooftop solar demand due to high residential consumption and proximity to Delhi’s solar awareness culture. Agra, with its high solar irradiance (5.0–5.3 peak sun hours annually), is among the most financially attractive PVVNL locations for rooftop solar. Processing timelines for PM Surya Ghar under PVVNL average 60 to 75 days in urban centres, extending to 90 days in smaller western UP towns.
- Key PVVNL note: The Agra and Meerut divisions have dedicated solar processing desks due to application volume
- Documentation: Property ownership via sale deed or property tax receipt; rural applicants may need khasra-khatauni land records
DVVNL: Dakshinanchal Vidyut Vitran Nigam Limited
Coverage: Allahabad (Prayagraj), Jhansi, Mirzapur, Chitrakoot, Banda, and southern UP districts
DVVNL covers the historically underserved southern UP belt, where grid reliability is among the weakest in the state. Prayagraj city has better infrastructure than rural DVVNL areas, where long daily outages are reported in summer. This grid context makes hybrid systems with battery backup the rational default for DVVNL applicants rather than the exception. Ask DVVNL for its current net metering timeline in writing, since bidirectional meter installation on rural feeders can slow it down.
- Hybrid preference: DVVNL rural consumers should strongly favour hybrid inverters; the grid cannot be relied upon during peak solar generation hours
- Prayagraj city applicants: Urban DVVNL zones have better processing infrastructure; ask for the timeline in writing
MVVNL: Madhyanchal Vidyut Vitran Nigam Limited
Coverage: Lucknow, Kanpur, Unnao, Sitapur, Hardoi, Rae Bareli, Lakhimpur Kheri, and central UP districts
MVVNL is UP’s largest DISCOM by consumer count and handles the state capital Lucknow and the industrial hub Kanpur. This concentration of urban consumers has made MVVNL’s rooftop solar processing more institutionally mature than other UP DISCOMs. Lucknow applicants can expect 50 to 70 days for commissioning. Kanpur, with its heavy commercial and industrial load on the grid, can see urban residential applications processed in 45 to 65 days. The Lucknow smart city initiative has accelerated smart meter rollout in the district, marginally reducing net metering installation timelines.
- Lucknow advantage: Highest concentration of UPNEDA-registered empanelled vendors in the state; best vendor selection
- Kanpur note: Industrial grid load means voltage fluctuation is common, inverters with a wide AC voltage tolerance are important, so check the range in the exact model’s datasheet
PUVVNL: Purvanchal Vidyut Vitran Nigam Limited
Coverage: Varanasi, Gorakhpur, Azamgarh, Mau, Ghazipur, Deoria, Ballia, Jaunpur, and eastern UP districts
PUVVNL serves eastern UP, which has some of the state’s weakest grid infrastructure and long outage durations in many districts. This makes hybrid systems with battery storage not a premium option but an operational necessity for homeowners who want usable electricity during daylight outage hours. Varanasi city has better urban grid quality than surrounding districts. Ask PUVVNL for its current timeline in writing and plan with a buffer in semi-urban and rural areas.
- Critical PUVVNL consideration: Do not install an on-grid-only system in rural PUVVNL areas; frequent outages render on-grid systems unproductive for large portions of the day
- Varanasi city: Often more manageable than surrounding districts; ask for the timeline in writing
Net Metering in UP: UPERC Rates, Process, and What You Actually Earn
Once your rooftop solar system is commissioned in UP, the financial relationship with your DISCOM is governed by UPERC (UP Electricity Regulatory Commission) net metering regulations. UP has a functioning net metering framework, though the process timelines are longer than in Gujarat or Maharashtra and the buyback rates are lower than the import tariff, which has direct implications for how you should size and operate your system.
How UP net metering works:
- Your existing meter is replaced with a bidirectional smart meter, supplied by the DISCOM under the PM Surya Ghar scheme at no cost to you
- Surplus solar generation beyond your instantaneous consumption is exported to the grid
- The UPERC-set feed-in tariff applies to exported units
- Surplus units are credited to your account and can offset future bills
- At the end of the annual settlement period, remaining credited units are settled in cash at the prevailing buyback rate
Current UP net metering rates by DISCOM zone (2026):
| DISCOM | Retail Import Tariff (LMV-1) | Solar Export / Buyback Rate | Self-Consumption Advantage |
|---|---|---|---|
| PVVNL (western UP) | ₹5.50–₹6.50/unit | ₹2.00–₹2.75/unit | ₹3.50–₹3.75/unit saved |
| DVVNL (southern UP) | ₹5.50–₹6.50/unit | ₹2.00–₹2.75/unit | ₹3.50–₹3.75/unit saved |
| MVVNL (central/Lucknow) | ₹5.50–₹7.00/unit | ₹2.25–₹3.25/unit | ₹3.25–₹3.75/unit saved |
| PUVVNL (eastern UP) | ₹5.50–₹6.50/unit | ₹2.00–₹2.75/unit | ₹3.50–₹3.75/unit saved |
Tariff rates are indicative for FY2025–26 based on UPERC orders. Verify current rates at your DISCOM office or the UPERC website before finalising financial projections.
The import-export tariff gap is large in UP, averaging ₹3.25–₹3.75 per unit. Every unit you consume directly from your solar generation is worth ₹5.50–₹7.00; every unit you export earns only ₹2.00–₹3.25. The practical implication: size your system to cover your self-consumption, and in areas with reliable daytime grid supply, aim for less than 15% export ratio.
For a complete walkthrough of the net metering application process nationally, including document requirements and DISCOM submission steps that apply in UP, the how to apply for net metering in India guide is the companion reference. The net metering India complete guide covers the regulatory framework in detail.
On-Grid vs Hybrid Inverter in UP: The Honest Assessment
The on-grid versus hybrid inverter decision is more consequential in Uttar Pradesh than in any other major Indian state. UP’s grid reality (4 to 8 hours of daily outages across large rural and semi-urban areas) fundamentally changes the economics and practical utility of each system type. This section covers the decision honestly, without defaulting to either option as universally correct.
Why on-grid systems underperform in UP:
An on-grid inverter shuts down automatically when the grid goes offline. This is a regulatory safety requirement, the anti-islanding function prevents back-feeding electricity into a line that grid workers may be servicing. In a state like Gujarat with 1–2 hours of annual outage, this is an inconvenience. In rural PUVVNL or DVVNL areas with 5–8 hours of daily summer outages, this means your solar panels are producing power during peak sun hours but your inverter is silenced, you receive no benefit from your investment during those hours.
Why hybrid systems make sense in UP despite higher cost:
A hybrid inverter with a battery bank operates independently of the grid. During a grid outage, the system isolates from the grid (the safety requirement is met), continues drawing from solar panels, charges the battery, and powers your home. When the grid returns, it reconnects and any surplus generation is exported for net metering credit. In UP’s outage environment, a hybrid system can deliver 90–95% of its theoretical annual generation to your home, while an on-grid system might deliver 60–70% of theoretical output in a rural PUVVNL location with frequent daytime cuts. Homeowners weighing this trade-off in detail should see the solar inverter buying guide for power-cut states, which covers UP, Bihar, and Maharashtra specifically.
| On-Grid Inverter | Hybrid Inverter | |
|---|---|---|
| Best for UP | Urban Lucknow, Kanpur with <2 hr daily outage | Rural UP, PUVVNL, DVVNL areas with 4–8 hr outages |
| Upfront cost premium | Baseline | +25–40% (plus battery cost) |
| Subsidy eligibility | ✓ Full (ALMM-listed) | ✓ Full (ALMM-listed hybrid) |
| Backup during outage | ✗ None - shuts down | ✓ Continues powering home |
| Effective annual generation | 60–80% of theoretical in outage-prone areas | 90–95% of theoretical |
| Diesel displacement | Partial - only saves when grid is on | Full - replaces most generator use |
| Recommended for UP | Urban centres with reliable grid | Semi-urban and rural UP |
For the comprehensive multi-factor decision framework including payback calculations by grid reliability tier, the on-grid vs hybrid vs off-grid decision guide builds the full model.
UP homeowners comparing system types should also note that the additional cost of a hybrid system (a same-brand Deye 5 kW pair was listed at ₹37,999 on-grid and ₹1,35,888 hybrid on 14 October 2026, before the battery) is partly offset by reduced diesel expenditure. Divide the premium on your own quote by your annual diesel saving to see how many years it takes to recover, on top of the electricity bill savings.
Worked Example: 3 kW Hybrid System in Lucknow (MVVNL)
For a real installation with similar inputs, see the Lucknow hybrid solar case study covering a 5 kW system on a 3 BHK home. The example below uses a smaller, more typical flat.
System design:
-
Capacity: 3 kW hybrid with 5 kWh lithium-iron-phosphate (LFP) battery
-
Panels: 8 × 380 Wp monocrystalline (ALMM-listed)
-
Battery: 5 kWh LFP, 80% usable depth of discharge
-
Expected generation: ~390 units/month (based on Lucknow’s 4.9 peak sun hours average)
Financial breakdown:
| Item | Amount |
|---|---|
| Assumed gross system cost - inverter + panels + mounting (3 kW hybrid) | ₹1,95,000 |
| Battery pack (5 kWh LFP; Deye 5.12 kWh lithium battery listing, 14 October 2026) | ₹1,23,000 |
| Total gross cost (assumed inverter, panels and mounting plus battery listing) | ₹3,18,000 |
| Central PM Surya Ghar subsidy (3 kW) | −₹78,000 |
| UPNEDA state top-up (verify current rate at upneda.org.in) | −₹TBC |
| Estimated net cost (central subsidy only) | ₹2,40,000 |
| Annual electricity bill saving (320 units × 12 × ₹6.50 avg.) | ₹24,960 |
| Annual diesel saving (generator displaced - 30 L × 12 × ₹95) | ₹34,200 |
| Annual net metering export credit (assumed 50 units/month × ₹2.50 × 12) | ₹1,500 |
| Total annual financial benefit | ₹60,660 |
| Simple payback period (central subsidy only, no state top-up) | ~4.0 years (₹2,40,000 ÷ ₹60,660) |
| 25-year total saving (at 2026 rates, no tariff escalation) | ~₹15.2 Lakh |
The diesel displacement saving of ₹34,200 per year is the crucial variable that transforms UP’s hybrid economics. Most financial calculators for solar in India are built for Gujarat or Maharashtra contexts where generator fuel is not a major household expense. In UP, it often is, and ignoring it understates the return on a hybrid system.
With an assumed 5% annual electricity tariff escalation and 3% annual diesel price increase, the 25-year saving rises to approximately ₹24 Lakh (24,960 × 47.7 + 34,200 × 36.5 + 1,500 × 25), before battery replacement and degradation. The solar inverter payback period guide provides the full financial model for different tariff escalation scenarios. For a deeper year-by-year projection that layers in battery degradation, tools such as SurgePV’s generation and financial modelling tool can build this out for your specific system.
Timeline for this Lucknow MVVNL applicant:
- MVVNL technical feasibility approval: 12 days
- Vendor selection and material procurement: 7 days
- Installation (hybrid system): 2–3 days
- DISCOM inspection and bidirectional smart meter installation: 20 days
- Commissioning document upload and verification: 5 days
- Central subsidy disbursement: 55 days post-upload
- UPNEDA state subsidy disbursement: 60 days post-upload
- Total end-to-end: approximately 50 days from application to system operational; ~110 days to both subsidies received
How to Apply for UP Solar Subsidy: Step-by-Step Process
The UP solar subsidy application involves two parallel tracks (the national PM Surya Ghar portal and the UPNEDA/DISCOM state scheme) but an experienced empanelled installer handles the majority of coordination. Understanding each step allows you to verify progress rather than discovering a procedural gap weeks after installation.
Before you apply, prerequisites:
The six-step UP application process:
-
Register on pmsuryaghar.gov.in with your consumer number, Aadhaar, and mobile number. Complete e-KYC. Select “Uttar Pradesh” and your DISCOM. This creates your national scheme application and generates an application reference number.
-
Register simultaneously on the UPNEDA portal at upneda.org.in for the state incentive component. The two registrations can and should run in parallel from day one, do not wait for central scheme approval before filing the state application.
-
Obtain DISCOM technical feasibility approval. Your DISCOM reviews your connection details and confirms grid capacity at your meter point. MNRE mandates a 15-day response window; UP DISCOMs typically respond in 10–25 days in urban areas and up to 35 days in rural zones.
-
Select an empanelled vendor and sign the contract. After the written feasibility approval, choose a vendor that appears on both empanelment lists (see the mistakes below) and confirm the itemised quotation. Installation starts only after that approval.
-
Install, commission, and notify your DISCOM for inspection. The DISCOM engineer visits to verify ALMM equipment, earthing, safety compliance, and arrange bidirectional smart meter installation. Allow 15–30 days from notification to inspection in UP, depending on DISCOM and urban/rural location.
-
Upload commissioning documents to both portals. Upload the DISCOM commissioning certificate, vendor invoice, system photographs, and bank details to pmsuryaghar.gov.in for the central subsidy. Do the same on the UPNEDA portal for the state component. Both disbursements are direct bank transfers, expect 45–90 days for each from document upload.
Common Mistakes That Delay or Deny UP Solar Subsidy
UP’s subsidy process has improved significantly with PM Surya Ghar, but procedural errors remain the leading cause of application delays and rejections. These are the mistakes reported most frequently by UP DISCOM officers and UPNEDA administrators, and they mirror the broader causes covered in the PM Surya Ghar rejection reasons guide.
-
Installing before DISCOM feasibility approval: All four UP DISCOMs require written feasibility approval before physical installation begins. Installing first and applying after is grounds for commissioning refusal; the DISCOM will not inspect an installation that pre-dates the approval.
-
Choosing a vendor on only one empanelment list: To claim both the PM Surya Ghar central subsidy and the UPNEDA state top-up, your vendor must appear on both portals. Some vendors are listed on one but not the other. Ask to see current portal screenshots of both registrations.
-
Bank account details not matching Aadhaar: The subsidy disbursement bank account must exactly match the account linked to the Aadhaar used for e-KYC. Name discrepancies (even initials vs full name) cause transfer rejections and add 30–60 days to disbursement timelines.
-
Missing the UPNEDA state application: The central PM Surya Ghar application does not automatically register you for the UPNEDA state incentive. Many homeowners complete the national portal registration and miss the state application entirely. The state top-up cannot be claimed retrospectively after commissioning.
-
Insufficient sanctioned load for the proposed system size: A 3 kW hybrid system on a connection with 3 kVA sanctioned load will fail feasibility. Apply for load enhancement at the same time as the solar application; UP DISCOMs process both concurrently.
-
Not tracking both portal statuses weekly: Each portal has an independent status tracker. Both portals occasionally request re-upload of documents without sending an active notification. Checking weekly prevents silent stalling.
For further guidance on the national-level eligibility rules that apply equally in UP (including edge cases for apartment owners and co-owned properties) the PM Surya Ghar eligibility guide covers these scenarios in detail. For comparison with how the subsidy process works in a state with faster DISCOM processing, see the solar subsidy in Gujarat 2026 guide and the solar subsidy in Maharashtra 2026 guide.
UP-Specific Details That Change the Solar Maths
Several features of Uttar Pradesh’s solar and grid environment are either not prominently covered on subsidy portals or require local knowledge that first-time applicants miss. These are worth understanding before finalising your system design.
The generator displacement calculation is a first-class financial input. In most states, financial models for rooftop solar focus on electricity bill reduction and net metering export credits. In UP, the generator operating cost is often as large as the electricity bill itself. A household running a 2 kVA generator for 5 hours per day at ₹95 per litre and 0.7 litres per hour is spending approximately ₹1,21,000 per year on diesel (5 × 0.7 = 3.5 litres a day × ₹95 × 365). A properly sized hybrid solar system with a 5–10 kWh battery bank eliminates 70–90% of this expenditure. Including this in your financial model is not optional, it is the dominant variable in many UP households.
Voltage fluctuation in UP requires inverter tolerance. UP’s grid is notorious not just for outages but for persistent voltage fluctuation, it is common to see grid voltage swing widely across the day, particularly on rural feeders and in older urban substations. An inverter with a narrow AC acceptance window will trip frequently under these conditions, reducing effective generation even during grid-available hours. An inverter with a wide AC voltage tolerance, set within your DISCOM’s connection conditions, is not a premium feature in UP, it is a practical necessity, and the exact range varies by model, so read it from the datasheet or manual. That is why India-grid-tuned inverters built specifically to handle these swings outperform generic imported firmware in this state.
Peak sun hours in UP vary significantly by region. Northern UP districts near the Himalayan foothills (Saharanpur, Lakhimpur Kheri, Pilibhit) average 4.5–4.8 peak sun hours annually. Central UP around Lucknow and Kanpur averages 4.8–5.1 peak sun hours. Southern UP districts like Jhansi and Banda (which receive drier, clearer skies) average 5.1–5.5 peak sun hours. A 3 kW system in Jhansi (DVVNL) will generate approximately 12–15% more electricity annually than the same system in Saharanpur (PVVNL). Confirm local irradiance data from your installer before accepting a quoted system size.
The UPERC banking year matters for cash flow. UP’s net metering settlement typically resets annually. Systems commissioned between October and March (when solar generation is lower) begin banking in a seasonally weak period before the next settlement. Commissioning between April and September maximises the banking window and first-year cash flow.
Where Qbits Fits in the UP Solar Stack
- String Sizing Calculator: Confirm panel-string compatibility for your roof orientation and irradiance zone before finalising the system design.
Qbits’ public documents do not state its manufacturing origin, service coverage in Uttar Pradesh or response time, so ask for current written terms for the model and location.
Contact Qbits with the site, load, equipment and document details relevant to this guide. Confirm the responsible party, deliverable, commercial scope and response time after submission.
Qbits inverters for this guide
Specs below come from each model's datasheet. Confirm the exact model and current written terms with Qbits before you buy.
QB 1.5/2.0/2.7/3.0/3.3/3.6/4.0KTLS
- Power
- 1.5–4 kW
- Phase
- Single-phase
- MPPT
- Single-MPPT
QB 4.2/4.6/5/5.4/6KTLS
- Power
- 4.2–6 kW
- Phase
- Single-phase
- MPPT
- Single-MPPT
QB 5/6/8/10/12/15/17KTLC
- Power
- 5–17 kW
- Phase
- Three-phase
- MPPT
- Dual-MPPT
Frequently Asked Questions
What is the solar subsidy available in Uttar Pradesh in 2026?
Is the UPNEDA rooftop solar scheme still active in 2026?
Which DISCOM should I approach for solar subsidy in UP?
How long does net metering approval take in Uttar Pradesh?
Is a hybrid inverter better than an on-grid inverter in Uttar Pradesh?
Can I get solar subsidy on a 5 kW system in UP?
What documents are required for solar subsidy in Uttar Pradesh?
Does frequent power cuts affect my solar system output in UP?
What is the net metering buyback rate in UP in 2026?
Akash Hirapara CFO, Qbits Energy
CFO overseeing solar financing, procurement, and channel partner enablement at Qbits.