Skip to content
Solar Resource Updated October 14, 2026

Peak Sun Hours

Quick Definition

Peak Sun Hours (PSH) is the number of hours per day during which solar irradiance averages 1,000 W/m² (1 kW/m²). It is a simplified measure of daily solar resource. Indian PSH ranges from 4.0 to 6.5 hours/day depending on location and season.

Quick Facts

Term
Peak Sun Hours
Category
Solar Resource
Industry
Solar Resource Assessment
Primary Use
Quick solar resource estimation
Common Users
Designers, installers, customers
Standards
Industry convention; not a formal standard
Related Technologies
Solar yield calculation, sizing

What are Peak Sun Hours

Peak Sun Hours (PSH) is a simplified measure of solar resource expressed as the number of hours per day during which solar irradiance averages 1,000 W/m² (1 kW/m²). It is the time integral of daily GHI normalised by STC reference irradiance.

PSH (hours/day) = Daily GHI (kWh/m²/day) / 1 kW/m²

For Indian sites, PSH ranges from 4.0 to 6.5 hours/day on annual average. PSH is widely used in residential and off-grid sizing because it gives an intuitive single number for daily solar resource. See Solar Irradiance Data India, State-Wise Peak Sun Hours for the full state and city breakdown behind the regional table below.

Why PSH matters

Simplified sizing. PSH × capacity × PR = daily energy. Direct sizing formula.

Customer communication. Customers grasp “5 hours of sun per day” easily.

Off-grid design. PSH drives PV-to-load sizing for off-grid inverter systems.

Yield estimation. Quick annual solar yield: capacity × PSH × 365 × PR.

Regional comparison. Single number to compare solar potential across locations.

How PSH is calculated

Where G_STC = 1 kW/m² = 1000 W/m².

For daily PSH, integrate hourly GHI over the day and divide by 1 kW/m².

Indian PSH by region (annual average)

Indian peak sun hours by region and city, annual average
RegionPSH (hours/day)
Western Rajasthan, Ladakh6.0 to 6.5
Andhra Pradesh, Telangana5.5 to 5.7
Gujarat (non-Kutch)5.5 to 6.0
Karnataka, Tamil Nadu5.0 to 5.5
Maharashtra, MP5.0 to 5.5
Delhi, Haryana, Punjab4.7 to 5.0
Mumbai5.0
Bengaluru5.3
Chennai5.3
Kolkata4.5
Hyderabad5.5
Uttar Pradesh, Bihar4.5 to 4.8
West Bengal, Odisha4.3 to 4.7
Kerala, Goa4.5 to 5.0
North-east states4.0 to 4.5

Technical deep dive

PSH vs GHI

PSH vs GHI, definition and use
MetricDefinitionUse
GHI (kWh/m²)Total irradiationScientific resource measure
PSH (hours)Equivalent hours at 1 kW/m²Simple sizing

Numerically equal in daily averages: 5.5 kWh/m²/day = 5.5 PSH.

Yield from PSH

Daily yield (kWh) = Capacity (kW) × PSH × PR

Off-grid sizing using PSH

PV size = (Daily load × autonomy factor) / (PSH × PR × battery efficiency)

For 5 kWh daily load, 1.3 oversize, 5 PSH, 0.85 PR, 0.92 battery: PV size = (5 × 1.3) / (5 × 0.85 × 0.92) = 6.5 / 3.91 = 1.66 kWp

See Off-Grid Solar Battery Bank Sizing, India Complete Guide for a full worked methodology covering autonomy days and depth of discharge.

Seasonal variation (Delhi example)

Approximate monthly peak sun hours, Delhi
MonthApproximate PSH
January4.0
February4.8
March5.8
April6.5
May6.8
June5.5
July4.5
August4.0
September4.8
October5.2
November4.3
December3.8
Average5.0

Real-world applications

Residential and small commercial solar sizing.

Off-grid system design.

Solar pumping capacity calculation, for example sizing solar inverters for water pumps against site PSH.

Customer-facing quick-estimate tools, such as PSH-driven solar savings calculators.

State-wise solar potential comparison.

Limitations of PSH

Ignores temperature, soiling, shading separately (PR captures these).

GHI-based PSH not optimal for tilted arrays without plane of array correction.

Does not capture intra-day variability.

Less precise than full hourly simulation.

Best practices

Use multi-year average PSH for sizing.

Apply realistic PR for the application.

For tilted arrays, use POA-based PSH.

Validate against ground irradiance data gathered during site survey when available.

Communicate PSH alongside expected yield.

Indian market context

NIWE Solar Atlas provides Indian PSH and GHI data.

PM Surya Ghar customer education materials use PSH to explain expected generation.

Residential rooftop sizing typically uses 4.5 to 5.5 PSH depending on city.

Utility solar developers use full hourly simulation with GHI, DNI and DHI rather than PSH alone, typically inside bankable solar simulation software.

Off-grid solar under PM-KUSUM and rural electrification programmes use PSH-based sizing.

Standards and certifications

Conventions and standards behind PSH
StandardScope
Industry conventionPSH definition
IEC 61724Performance monitoring (uses irradiance)
WMO CIMO GuideUnderlying meteorology

Key takeaways

PSH is a simplified single-number measure of daily solar resource, equal to daily GHI divided by 1 kW/m². Indian PSH ranges from 4.0 to 6.5 hours/day. PSH provides intuitive sizing for residential and off-grid systems through the relationship: daily yield = capacity × PSH × PR. Multi-year averages and realistic PR assumptions are essential for accurate use.

Further reading

For how Peak Sun Hours plays out in real projects, these guides go deeper:

Sources

  • NIWE Solar Resource Atlas.
  • Solargis Solar Resource Database.
  • NSRDB National Solar Radiation Database, NREL.
  • Meteonorm Global Solar Radiation Database.
  • IEC 61724, Performance monitoring.
  • Duffie J. A., Beckman W. A., Solar Engineering of Thermal Processes, Wiley.
  • IEA PVPS Trends in Photovoltaic Applications 2024.
  • MNRE Solar PV Design Guidelines.
  • Mertens K., Photovoltaics: Fundamentals, Technology, and Practice, Wiley.
FAQ

Frequently Asked Questions

What is PSH in simple words?
How many hours of bright peak sun your site gets per day. If your location averages 5 PSH, it is like getting 5 hours of full midday sun every day.
What is the typical Indian PSH?
4.0 to 6.5 hours/day annual average. Higher in Rajasthan and Gujarat (5.5 to 6.0), lower in north-east (4.0 to 4.5).
How is PSH calculated?
PSH (hours/day) = daily GHI (kWh/m²) / 1 kW/m². If GHI is 5.5 kWh/m²/day, PSH = 5.5 hours.
PSH vs sunshine hours?
Sunshine hours include all daylight with sun above horizon. PSH counts only the equivalent peak hours at 1 kW/m². Different concepts.
How does PSH relate to solar yield?
Daily yield (kWh) = PSH × Capacity (kW) × Performance Ratio. A 5 kW system at 5 PSH × 0.8 PR generates 20 kWh/day.
Does PSH change with season?
Yes. Indian PSH peaks in April-May (6 to 7), drops during monsoon (3.5 to 4.5).
Does location latitude affect PSH?
Yes. Lower latitudes get more sun on average. Indian PSH varies more by climate than latitude.
Is PSH a formal standard?
Industry convention. Not a formal scientific term. Used widely in solar sizing literature.
What is the highest PSH in India?
Western Rajasthan and Ladakh: 6.0 to 6.5 hours/day annual average. Peak summer days exceed 8 hours.
Does PSH count cloudy hours?
Indirectly. Cloudy hours contribute less than 1 kW/m². They are scaled down before counting toward PSH.
How is PSH used in off-grid design?
PV size (kW) = (Daily load kWh) / (PSH × Performance Ratio × battery efficiency).
Does tilt affect PSH calculation?
If using POA irradiance instead of GHI, yes. PSH at optimal tilt is higher than GHI-based PSH.
What is PSH for Delhi?
Approximately 4.7 hours/day annual average.
What is PSH for Mumbai?
Approximately 5.0 hours/day annual average. Monsoon months drop to 3.5.
Where do I find Indian PSH data?
NIWE Solar Atlas, Solargis, or computed from GHI in NSRDB and Meteonorm.
Nirav Dhanani
Written by
Nirav Dhanani · CEO

Co-founder & CEO driving Qbits Energy's product strategy and growth across India.

Continue researching this solar decision

Use the related definitions and guides to check the assumptions, sources and requirements for your project.