A Feed In Tariff (FIT) is a regulated price the utility pays for each kWh of electricity exported by a renewable generator. In Indian solar, FITs are set by state regulators for gross-metered rooftop and small captive solar, and by central tenders for utility-scale projects.

Quick Facts

Term
Feed In Tariff
Category
Policies
Industry
Renewable Energy Policy
Primary Use
Per-kWh payment for solar export
Common Users
Solar developers, gross-metered rooftop owners, IPPs, DISCOMs
Standards
Electricity Act 2003, CERC and SERC tariff regulations
Related Technologies
Gross metering, PPA, on grid inverter, smart meter

What is feed in tariff

Feed in tariff is a regulated per-kWh price paid by the utility to a renewable energy generator for electricity exported to the grid. The tariff is set by an electricity regulatory commission and locked into a long-term contract, typically 25 years. The generator receives the tariff regardless of fluctuations in retail rates, fuel prices or market spot prices.

In India, FIT appears in several forms:

  • State SERC tariff orders for gross-metered rooftop solar, setting prices like ₹3.20 per kWh for new commercial connections.
  • SECI and CPSU tender results for utility-scale solar, which crystallise into long-term power purchase agreements at the discovered tariff.
  • State agency tenders for distributed solar parks under category-specific FITs.

The FIT mechanism gave Indian solar its early policy lift in the 2010 to 2014 period, when tariffs above ₹15 per kWh underwrote the first 5 GW of capacity. Tariffs have since fallen below ₹2.50 per kWh for utility solar, reflecting the dramatic fall in capex.

Feed in tariff explained simply

A regulator decides that any new solar plant signed up this year will be paid a fixed rate per unit for the next 25 years. The DISCOM signs a contract with each generator at that rate. Every unit sent to the grid earns the same fixed price, in good years and bad. The generator knows exactly what to expect, the bank knows what to lend against, and the plant gets built.

That predictability is the entire point of FIT. Without it, building a 25-year asset against fluctuating spot prices would be nearly impossible.

Why FIT matters

Investment certainty. Banks finance solar projects on the strength of a 25-year known revenue. FIT supplies that revenue line.

Renewable capacity addition. India’s growth from under 1 GW solar in 2010 to over 90 GW by 2025 ran almost entirely on FIT and tender-based PPA structures.

DISCOM procurement. State DISCOMs sign FIT-based PPAs to meet their Renewable Purchase Obligation.

Rooftop solar for larger customers. Gross-metered rooftop solar in many states is the only mechanism for systems above the net metering cap.

Policy lever. Regulators use FIT level to encourage or slow specific segments. Higher FITs for distributed solar, lower for utility.

How FIT works

  1. The regulator publishes a tariff order with category-specific FITs.
  2. A developer applies to the DISCOM or SECI for a project under the prevailing FIT.
  3. A 25-year PPA is signed at the discovered tariff.
  4. The plant is commissioned and generation begins.
  5. A dedicated generation meter records exported energy.
  6. The DISCOM pays the developer monthly at FIT rate multiplied by metered generation.
  7. Disputes are resolved through CERC or SERC.

Technical deep dive

FIT setting methodology

Regulators model the levelised cost of energy (LCOE) for a representative plant. The LCOE is built up from:

FIT is set close to LCOE, sometimes with a small premium for distributed segments. Developers and EPCs modelling this trade-off across multiple sites often lean on purpose-built solar financial modeling tools to stress-test capex, CUF and tariff assumptions before bidding.

Sample FIT history

Sample SECI utility solar tariff history
YearSECI utility solar tariff (₹/kWh)
201017.91 (NSM Phase 1)
20137.49
20172.44
20201.99
20232.55
20242.59
₹/kWh05101520201020132017202020232024₹17.91/kWh₹7.49/kWh₹2.44/kWh₹1.99/kWh₹2.55/kWh₹2.59/kWh₹/kWh05101520201020132017202020232024₹17.91/kWh₹7.49/kWh₹2.44/kWh₹1.99/kWh₹2.55/kWh₹2.59/kWh
SECI utility solar tariff, 2010 to 2024
ItemValue (₹/kWh)
2010₹17.91/kWh
2013₹7.49/kWh
2017₹2.44/kWh
2020₹1.99/kWh
2023₹2.55/kWh
2024₹2.59/kWh
SECI utility solar tariff, 2010 to 2024Source: SECI tender discovered tariffs, as tabulated in this guide's sample FIT history (2010 is NSM Phase 1)Years are not evenly spaced.

Distributed FIT under SERC orders is typically higher than utility, reflecting smaller scale and higher per-MW capex.

Contract structure

Typical feed-in tariff contract terms
TermTypical value
Duration20 to 25 years
TariffFixed, sometimes escalated
Curtailment compensationLimited
Late payment surcharge1.0 to 1.5 percent per month
TerminationForce majeure, default events
SecuritisationLetter of credit, payment security mechanism

Real-world applications

State gross-metered rooftop solar in Tamil Nadu, Andhra Pradesh, Karnataka, Maharashtra and others.

Utility-scale solar parks under SECI and NTPC tenders.

Distributed solar under state agencies like Solar Energy Corporation of Karnataka and Gujarat Urja Vikas Nigam.

CPSU programmes setting FIT for self-consumption-plus-export configurations.

PM-KUSUM Component C feeders, where FIT is set for agriculture-feeder solarisation, a segment installers pairing solar EPC with KUSUM feeder work know well.

Advantages of FIT

Long-term price certainty for investors.

Simple to administer for the utility.

Encourages standardisation in plant design and construction.

Drives down costs over time as competition pushes tariffs lower.

Supports financing at low cost of capital.

Limitations of FIT

Less efficient than reverse-auction tendering at discovering the lowest tariff.

Risk of stranded contracts if technology costs fall sharply during the term.

Locks utilities into legacy high-cost contracts when newer cheaper sources become available.

Does not value self-consumption.

Requires regulatory capacity to set tariffs accurately.

Common problems

Late payments from cash-strapped DISCOMs. Some states routinely delay solar FIT payments by 90 to 240 days.

FIT revision attempts. Regulators occasionally try to apply revised FITs retrospectively, triggering litigation.

Curtailment without compensation. Excess generation curtailed by the DISCOM may not be paid under some contracts.

Metering disputes. Inaccurate generation meters cause revenue gaps.

Force majeure ambiguity. Cyclones, COVID-related lockdowns and grid restrictions have all triggered disputed force majeure claims.

PSM (Payment Security Mechanism) absence in some PPAs.

Best practices

Read the entire tariff order, not just the headline rate.

Negotiate a payment security mechanism in the PPA.

Confirm the metering arrangement and ownership before signing.

Build cash flow buffers for 180 days of delayed payment.

Maintain detailed generation logs for dispute resolution.

Watch for curtailment events and document them.

Pursue late payment surcharge claims to deter chronic delays.

Comparison: FIT vs reverse auction vs net metering

FIT vs reverse auction vs net metering
FeatureFIT (regulated)Reverse auctionNet metering
Price discoveryRegulatorBiddersNone, retail offset
SpeedFaster project sign-upSlower (auction process)Customer-driven
Used forDistributed and historical utilityModern utility solarResidential rooftop
Risk allocationRegulatorBidderCustomer

Homeowners deciding between gross-metered FIT and standard net metering should also see our state-by-state guide on how to apply for net metering in India.

Indian market context

The CERC and state SERCs publish FIT tariff orders periodically. The Forum of Regulators provides cross-state coordination.

Utility-scale FITs are now largely discovered through SECI and state agency tenders rather than through regulator-set rates. The few state-set utility FITs that remain are usually higher than tendered rates.

Distributed FITs for rooftop solar appear in state-specific gross metering frameworks, mostly for C&I.

The Late Payment Surcharge Rules 2022 created a mechanism for DISCOMs to clear outstanding renewable energy dues with escalating penalties.

Standards and certifications

Laws and orders behind feed-in tariffs
StandardScope
Electricity Act 2003Statutory basis
CERC Tariff RegulationsMethodology
SERC tariff ordersPer-state FITs
Late Payment Surcharge Rules 2022Payment discipline
CEA Technical Standards 2019Connectivity

Common mistakes

Assuming FIT escalates with inflation. Most contracts are flat.

Failing to register for payment security mechanism.

Ignoring early payment delays. Habits established in year one persist.

Skipping legal review of PPA terms.

Not modelling curtailment risk in the financial plan.

Selecting a low FIT without checking DISCOM payment history.

Ignoring tariff order amendments published mid-year.

Key takeaways

Feed in tariff is the regulated long-term price that makes solar PV financing possible. Indian FITs have fallen from above ₹15 per kWh in 2010 to below ₹2.50 per kWh in 2024 as capex has collapsed. State SERC orders and SECI tender results define the current FIT landscape. Payment discipline, PPA structure and contract clauses matter as much as the headline rate. For customers weighing FIT-based export against self-consumption, our guide to solar inverter payback period across Indian states works through the underlying math.

Further reading

For how Feed In Tariff plays out in real projects, these guides go deeper:

Sources

  • Electricity Act 2003, Government of India.
  • CERC Tariff Regulations 2024 and prior orders, Central Electricity Regulatory Commission.
  • State SERC tariff orders for rooftop and utility-scale solar.
  • SECI and NTPC tender bid documents and discovered tariffs.
  • Late Payment Surcharge Rules 2022, Ministry of Power.
  • MNRE Annual Reports on solar capacity addition and tariff trends.
  • IRENA Renewable Power Generation Costs in 2024.
  • Forum of Regulators publications on distributed renewable tariff design.
  • IEA India Energy Outlook 2024, International Energy Agency.

Apply this term

FAQ

Frequently Asked Questions

What is feed in tariff in simple words?
It is the price the utility pays you for every unit of solar power you send to the grid. A regulator fixes the rate, and it stays constant for the contract term, usually 25 years.
FIT vs net metering, what is the difference?
Net metering offsets your bill with retail-priced units. FIT pays you a fixed wholesale price for every exported unit while you pay retail for consumption.
Is FIT used in India?
Yes. State regulators set FIT for gross-metered rooftop solar. Central FIT-like mechanisms include SECI tender prices and PPAs negotiated under state RPO programmes.
What is the FIT for rooftop solar in India in 2026?
Approximate state ranges: ₹2.4 to ₹4.5 per kWh, depending on state and category. Larger systems usually get lower FITs than smaller ones.
Is FIT taxable?
FIT revenue is taxable as business income for commercial customers. Residential FIT receipts are typically below taxable thresholds.
How long is a FIT contract?
Usually 25 years, matching the typical solar PV plant life. Some states use 20-year contracts.
Can FIT be revised?
Most tariff orders apply to new projects only. Existing contracts are grandfathered. Check the contract for an escalation or revision clause.
Does FIT include subsidies?
FIT is separate from upfront subsidies. Customers can claim PM Surya Ghar subsidy on capex while selling generation at FIT, where state policy allows.
What is the difference between FIT and average pooled cost?
FIT is a regulated price for new generation. Average pooled cost is the DISCOM's blended average procurement cost across all sources, sometimes used to compensate excess net metering credits.
Why does India use FIT?
To provide investment certainty for renewable developers. Without long-term price guarantees, banks would not finance 25-year solar plants.
Are FITs declining over time?
Yes. As solar capex falls, regulators reduce new FITs. SECI tariffs dropped from ₹17.91 per kWh in 2010 to under ₹2.50 per kWh in 2024.
Can residential customers get FIT?
In states with gross metering for residential, yes. Most residential customers prefer net metering because the per-kWh value is higher.
Is FIT denominated in foreign currency?
No, Indian FIT contracts are in rupees. Some early projects with imported equipment had partial dollar indexation, but this is rare in current contracts.
What happens if the DISCOM does not pay FIT?
Standard PPA dispute resolution applies. Most contracts have late payment surcharges and escalation to CERC or SERC. Some DISCOMs have historically paid late by 90 to 180 days.
Can FIT projects access accelerated depreciation?
Yes. Commercial solar plants under FIT qualify for 40 percent accelerated depreciation under the Income Tax Act.
Nirav Dhanani
Written by
Nirav Dhanani · CEO

Co-founder & CEO driving Qbits Energy's product strategy and growth across India.

Continue researching this solar decision

Use the related definitions and guides to check the assumptions, sources and requirements for your project.