Qbits warranty and service terms: Qbits public datasheets describe an expandable warranty but do not define a universal duration, remedy, registration deadline, service SLA, or exclusions. Obtain the current written terms for the exact model and sale before relying on a headline claim.
ALMM and inverter compliance: MNRE’s current ALMM page publishes solar PV module and cell lists, not an inverter list. Verify the inverter’s exact model documents and applicable scheme or DISCOM requirements separately.
Bihar presents a choice for solar buyers: grid supply has improved sharply, but averages hide local outages, so whether you need backup is a question about your own feeder. An on-grid system does nothing during an outage. A hybrid system with a battery keeps selected loads running. The PM Surya Ghar subsidy, now with a state top-up, reduces the upfront cost for both. This guide covers Bihar’s specific solar landscape, how applications run through NBPDCL and SBPDCL (the two DISCOMs under BSPHCL), and how to choose the right system type.
Direct answer. Solar subsidy in Bihar 2026 is the central PM Surya Ghar amount of up to ₹78,000 for a 3 kW system, plus a state top-up of ₹10,000 per kW up to ₹20,000 approved by the Bihar Cabinet in August 2026, for up to ₹98,000 in total. The state scheme is first come, first served. Hybrid solar with a battery is worth considering only if your own outages justify it, because battery costs are not subsidised. Apply at pmsuryaghar.gov.in{target=“_blank” rel=“noopener”} with NBPDCL or SBPDCL selected.
Bihar is one of the states where the choice between on-grid and hybrid solar needs a decision based on your own outage record. The on-grid vs hybrid decision guide covers the financial comparison in detail. For the neighbouring states, see the solar subsidy Uttar Pradesh guide and the West Bengal guide, or the all-states comparison.
Bihar’s State Top-Up: What Was Approved in 2026
In August 2026 the Bihar Cabinet approved state assistance for residential rooftop solar under PM Surya Ghar, paid on top of the central amount. As reported by BioEnergy Times (13 August 2026) and Energetica India (14 August 2026):
- ₹10,000 per kW, capped at ₹20,000 per consumer, paid by direct benefit transfer
- Combined support: ₹40,000 for 1 kW, ₹80,000 for 2 kW, up to ₹98,000 for 3 kW or more
- First come, first served, with the scheme capped at five lakh consumers and approved for one year
- Estimated outlay: ₹1,000 crore
News reports say the Chief Minister launched it as the Mukhyamantri Solar Protsahan Yojana on 22 September 2026 and transferred the state assistance to 25,000 beneficiaries who had already installed systems under PM Surya Ghar. We found no official government release with the full eligibility terms, so confirm with your DISCOM or BREDA (Bihar Renewable Energy Development Agency, the state nodal agency) before you assume your system qualifies.
| System Size | Central | Bihar state top-up | Total |
|---|---|---|---|
| 1 kW | ₹30,000 | ₹10,000 | ₹40,000 |
| 2 kW | ₹60,000 | ₹20,000 | ₹80,000 |
| 3 kW and above | ₹78,000 | ₹20,000 | Up to ₹98,000 |
Last Date and Scheme Validity
MNRE’s guidelines run PM Surya Ghar through FY 2026-27, and the national portal shows the scheme closing on 31 March 2027. As of mid-October 2026, reports say the Centre is considering an extension and a successor phase, but nothing has been notified, so treat 31 March 2027 as the working deadline. The Bihar top-up is reported as approved for one year from August 2026. The central subsidy is released after commissioning, so installation alone before the date is not enough.
Bihar’s Power Situation: The Grid Reality
Bihar’s electricity supply has improved. Reporting in 2026 quotes the state energy department as putting average supply at about 23 to 24 hours a day in urban areas and 22 to 23 hours in rural areas, against far lower figures in 2005. Those are state-reported averages, and outages remain local: a feeder, a village or a time of year can be much worse than the average.
This changes the solar decision. An on-grid inverter’s mandatory anti-islanding function shuts the system down the moment grid power fails, which is exactly when a household with long outages needs backup most:
| System Type | During Grid Power | During an Outage | Monthly Benefit |
|---|---|---|---|
| On-Grid Solar | Runs; reduces bill | Shuts down (anti-islanding) | Bill savings only |
| Hybrid Solar + Battery | Runs; reduces bill | Continues from battery for selected loads | Bill savings plus lower or no generator cost |
| Existing DG Generator | Off (grid available) | Running; fuel cost depends on your hours and load | Fuel cost only |
For a Bihar family that currently runs a diesel generator through long outages, a hybrid system can cut both the generator cost and the grid bill. For a family with short, rare outages, an on-grid system usually gives the faster payback.
Subsidy Amount and System Cost in Bihar
The central PM Surya Ghar subsidy is uniform across all states. The state top-up applies on top for eligible applicants. The costs below are illustrative assumptions, not quotes and not Qbits prices:
| System Type | Central Subsidy | Assumed Gross Cost | Net Cost After Central | Net Cost After Central + ₹20,000 State |
|---|---|---|---|---|
| 3 kW on-grid | ₹78,000 | ₹1,55,000 to ₹1,85,000 | ₹77,000 to ₹1,07,000 | ₹57,000 to ₹87,000 |
| 3 kW hybrid + 5 kWh LFP battery | ₹78,000 | ₹2,80,000 to ₹3,50,000 | ₹2,02,000 to ₹2,72,000 | ₹1,82,000 to ₹2,52,000 |
| 5 kW hybrid + 10 kWh LFP battery | ₹78,000 | ₹4,20,000 to ₹5,00,000 | ₹3,42,000 to ₹4,22,000 | ₹3,22,000 to ₹4,02,000 |
In these assumptions the battery component adds roughly ₹1,20,000 to ₹1,60,000 to the total cost. Replace the gross costs with your own written quotes.
4.99 hours. Peak sun hours at the Patna reference site at its optimum tilt of 23 degrees, with a modelled yield of 1,438 kWh per kWp a year and horizontal irradiance of 4.70 kWh/m²/day. Source - Global Solar Atlas (World Bank and ESMAP, Solargis v2.2.68), queried 24 September 2026, as tabulated in our state-wise irradiance guide. Values differ by district.
At that modelled yield a 3 kW system generates about 4,314 units a year, roughly 360 a month. What those units are worth depends on your bill: BERC’s FY 2026-27 tariff chart sets the domestic energy charge at ₹7.42 per unit, but the state pays for the first 125 units (cabinet approval July 2025), so only units above 125 a month carry an energy charge for solar to remove.
NBPDCL vs SBPDCL: Which DISCOM Are You Under?
Bihar’s electricity distribution is split between two companies, each a DISCOM in its own right, both owned by the holding company BSPHCL. Both operate through the PM Surya Ghar national portal. District lists below follow the public Wikipedia entries and SBPDCL’s own statement that it serves 17 districts; your bill is the authority.
| DISCOM | Districts Covered |
|---|---|
| NBPDCL (North Bihar, 21 districts) | West Champaran, East Champaran, Sitamarhi, Sheohar, Muzaffarpur, Vaishali, Saran, Siwan, Gopalganj, Madhubani, Darbhanga, Samastipur, Begusarai, Khagaria, Saharsa, Supaul, Madhepura, Araria, Katihar, Purnea, Kishanganj |
| SBPDCL (South Bihar, 17 districts) | Patna, Nalanda, Gaya, Bhagalpur, Lakhisarai, Jehanabad, Aurangabad, Buxar, Bhojpur, Rohtas, Arwal, Munger, Banka, Nawada, Sheikhpura, Jamui, Kaimur |
NBPDCL and SBPDCL Application Process: Step by Step
We have not attached day counts to the stages below because no DISCOM-level timelines are published.
The Bihar PM Surya Ghar 7-Step Application Framework
- Identify your DISCOM: NBPDCL or SBPDCL based on your district and, above all, your bill. Both are listed on the portal under Bihar.
- Register on national portal: Select Bihar and your specific DISCOM entity. Enter your consumer number exactly as it appears on the bill.
- Complete Aadhaar eKYC: Enter Aadhaar number, receive OTP on your Aadhaar-linked mobile.
- Upload documents: Latest electricity bill, Aadhaar, PAN, bank passbook, property proof. Rural applicants without formal title documents should ask their division what alternative proof it accepts.
- DISCOM feasibility and approval: The DISCOM assesses your roof, sanctioned load and the local network. Wait for approval before installing.
- Select empanelled vendor: Choose a vendor from the portal’s empanelled list and compare at least two quotes before confirming. Vendor density is highest in Patna; rural districts may have fewer choices.
- Installation, meter replacement, inspection and subsidy: After installation the DISCOM inspects, installs the net meter and commissions the system; the central subsidy follows verification on the portal. In July 2026 BERC waived the application and meter testing fees for domestic rooftop consumers.
Choosing the Right System for Bihar
The choice between on-grid and hybrid depends on your location’s grid reliability, which you can measure.
Recommend on-grid if:
- You are in a city or town with short, infrequent outages
- Your primary goal is the shortest payback on the PM Surya Ghar subsidy
- You are comfortable with no backup power during outages
Recommend hybrid if:
- You experience long or frequent outages, which you can confirm from a log of a few weeks
- You currently spend a meaningful amount monthly on DG fuel or inverter battery replacement
- You need uninterrupted power for medical equipment, a refrigerator, or study lighting
The how to choose a hybrid solar inverter guide covers the technical selection criteria for these use cases with detailed comparison tables.
Bihar-Specific Inverter Requirements
Bihar’s electrical environment places specific demands on inverters:
- Voltage range handling: Voltage in some district feeders can swing widely. Compare each datasheet’s grid-voltage range; for example, the QB 1.5/2.0/2.7/3.0/3.3/3.6/4.0KTLS datasheet lists a 90 to 290 Vac grid range.
- Monsoon protection: Bihar’s monsoon (June to September) is intense and some districts flood. Check the ingress protection rating on the datasheet of the exact model you are considering, and mount outdoors with that in mind.
- Temperature range: Bihar summers are hot. Compare the datasheet’s operating temperature range and derating behaviour; the QB 1.5 to 4.0KTLS datasheet lists an operating range of -25 to +60 °C.
- Battery compatibility: For hybrid systems, confirm the inverter supports LFP battery chemistry and has configurable charge and discharge parameters for the specific battery type.
Common Mistakes Bihar Solar Applicants Make
- Choosing on-grid when you have long outages: An on-grid system shuts down during an outage, so you lose all solar benefit exactly when backup matters most.
- NBPDCL vs SBPDCL confusion: Selecting the wrong DISCOM entity causes consumer number validation failure. Check your bill header.
- Battery without proper warranty: Battery warranty varies widely in the market. Require the warranty terms in writing with the battery manufacturer’s name on the certificate.
- Overestimating net metering income: During outages on-grid solar cannot export, and the year-end surplus rate is under review by BERC, so do not build your payback on export income.
- Ignoring the free 125 units: A household that uses 125 units or fewer a month has little bill to cut; a payback calculation must start from the units you actually pay for.
See the PM Surya Ghar rejection reasons guide for how to handle document issues that are common in rural applications. The Solar Battery Backup Calculator helps size your battery bank for your own outage pattern.
Bihar Solar ROI: Two Illustrative Cases
Both cases below are assumed households, not real customers. The inputs, formula and result are shown so you can replace them with your own bill and quote. Generation uses the Patna reference site (1,438 kWh per kWp a year) as a proxy for both.
Case 1: 3 kW on-grid, Patna (SBPDCL), 250 units a month. The household pays for 125 units a month after the state’s free 125 (assumption: the support is applied to net billed units; confirm with SBPDCL). A 3 kW system models at about 360 units a month, more than the household uses, so the whole billable amount disappears.
| Item | Amount |
|---|---|
| Monthly consumption (assumed) | 250 units |
| Units billed after the free 125 | 125 units |
| Monthly energy bill at ₹7.42 (BERC FY 2026-27) | about ₹928 |
| Annual saving (₹928 × 12; export surplus not valued) | about ₹11,130 |
| Gross cost (assumed) | ₹1,70,000 |
| Net cost after central subsidy ₹78,000 | ₹92,000 |
| Net cost after central + ₹20,000 state | ₹72,000 |
| Payback, central only | about 8.3 years |
| Payback, central + state top-up | about 6.5 years |
Case 2: 3 kW hybrid with 5 kWh battery, Muzaffarpur (NBPDCL). The household uses 250 units a month, has long outages, and spends an assumed ₹3,000 a month on a diesel generator, which we assume the hybrid system displaces. This is an assumption to test, not a promise: the generator saving depends on the battery size and the loads you back up.
| Item | Amount |
|---|---|
| Monthly energy bill removed (125 billed units at ₹7.42) | about ₹928 |
| Monthly DG fuel cost displaced (assumed) | ₹3,000 |
| Total monthly saving | about ₹3,930 |
| Gross cost, 3 kW hybrid + 5 kWh battery (assumed) | ₹3,10,000 |
| Net cost after central subsidy ₹78,000 | ₹2,32,000 |
| Net cost after central + ₹20,000 state | ₹2,12,000 |
| Payback, central only | about 59 months |
| Payback, central + state top-up | about 54 months |
The hybrid case pays back on the generator saving; without a generator, the same system would pay back on bill savings alone and take far longer. For full payback methodology, see the solar inverter payback period guide and the on-grid vs hybrid ROI comparison. If you want to model your own household’s numbers against a different tariff or DG fuel cost, SurgePV’s financial modeling tool{target=“_blank” rel=“noopener”} lets you adjust the same variables used here.
Where Qbits Fits in Bihar
- On-Grid Inverters: For a 3 kW home system on a reliable feeder, review the QB 1.5/2.0/2.7/3.0/3.3/3.6/4.0KTLS family datasheet and confirm the exact model and any scheme or DISCOM requirements in writing.
- Hybrid Inverters: Review the QBH 3 to 6KS48P family model documents and confirm the exact battery, firmware, PV, backup-output, transfer, communication, warranty and project requirements in writing.
- String Sizing Calculator: Confirm panel-string configuration for your roof before the DISCOM application.
Contact Qbits with the exact model, site inputs and documents relevant to the request. Confirm the responsible party, deliverable, fees and response time after submission.
Qbits inverters for this guide
Specs below come from each model's datasheet. Confirm the exact model and current written terms with Qbits before you buy.
QB 1.5/2.0/2.7/3.0/3.3/3.6/4.0KTLS
- Power
- 1.5–4 kW
- Phase
- Single-phase
- MPPT
- Single-MPPT
QB 4.2/4.6/5/5.4/6KTLS
- Power
- 4.2–6 kW
- Phase
- Single-phase
- MPPT
- Single-MPPT
QB 5/6/8/10/12/15/17KTLC
- Power
- 5–17 kW
- Phase
- Three-phase
- MPPT
- Dual-MPPT
Frequently Asked Questions
What solar subsidy is available in Bihar in 2026?
Why do some Bihar homeowners prefer hybrid solar over on-grid systems?
How long does PM Surya Ghar approval take in Bihar?
What is the electricity tariff in Bihar and does solar make financial sense?
Is there NBPDCL and SBPDCL - which covers my area?
What documents are required for the Bihar solar subsidy application?
What battery specification is recommended for Bihar hybrid solar?
Can rural Bihar households without complete land records apply?
What export rate applies under net metering in Bihar?
Akash Hirapara CFO, Qbits Energy