ALMM and inverter compliance: MNRE’s current ALMM page publishes solar PV module and cell lists, not an inverter list. Verify the inverter’s exact model documents and applicable scheme or DISCOM requirements separately.

Two major government schemes, two different beneficiary groups, and considerable confusion between them. Homeowners ask about KUSUM when they should be looking at PM Surya Ghar; farmers hear about PM Surya Ghar when KUSUM Component B is actually the right fit. This guide draws a clear line between the two schemes so you apply to the one that actually applies to your situation.

Direct answer. PM Surya Ghar is for residential homeowners with a domestic electricity connection seeking rooftop solar subsidies. KUSUM Yojana is for farmers seeking to solarise agricultural pumps or install solar on agricultural land. The two schemes serve different beneficiary groups, different connection types, and different MNRE objectives. Choosing the wrong scheme results in an ineligible application.

Both schemes fall under MNRE’s rooftop solar programme framework but address fundamentally different energy problems. Residential rooftop solar and agricultural solar pumping need completely different policy interventions. Understanding the distinction takes five minutes and prevents weeks of misdirected applications.

Scheme Overview: Side-by-Side Comparison

PM Surya Ghar and KUSUM Yojana compared on beneficiary, subsidy, portal, vendor and timeline
DimensionPM Surya Ghar (Muft Bijli Yojana)KUSUM Yojana
Target beneficiaryResidential homeownersFarmers and agricultural users
Connection typeDomestic electricity connectionAgricultural connection or off-grid
Primary purposeRooftop solar for home electricityPump solarisation and agricultural land use
Portalpmsuryaghar.gov.inState nodal agency portals
Max central subsidy₹78,000 (3 kW system)30% of benchmark cost (varies by component)
Vendor requirementEmpanelled vendor from national portalEmpanelled installer from state DISCOM list
Net metering benefitYes - residential buy-back rateYes for Component C - agricultural feed-in tariff
Application timeline45–90 days average3–12 months average (state-dependent)
ALMM requiredYesYes
Battery subsidyNo (solar only)No for pump components; some states fund separately

₹34,000 crore. The total central allocation for KUSUM Yojana from 2019 through 2026, targeting 3.5 million farmers for pump solarisation under Component B and C. Source - MNRE KUSUM Portal{target=“_blank” rel=“noopener”}, 2026.

PM Surya Ghar: Who Should Apply

PM Surya Ghar is the right choice if your situation matches all of these criteria:

The subsidy of up to ₹78,000 for a 3 kW system, combined with net metering income, shortens the payback period of a residential installation; the exact figure depends on system cost, tariff and self-consumption (the solar IRR and payback guide shows the arithmetic). After payback, the solar system generates effectively free electricity for its remaining 20+ year life.

For the complete application process, see how to apply for PM Surya Ghar online. For required documents, see the PM Surya Ghar documents checklist.

KUSUM Yojana: The Three Components Explained

KUSUM Yojana addresses the energy challenges of India’s agricultural sector through three structurally different components.

Component A: Decentralised Ground-Mounted Solar Plants

Farmers and rural landowners with barren, fallow, or marginal agricultural land can lease it for solar plants of 0.5 MW to 2 MW capacity. The solar power generated is sold to the local DISCOM at a fixed tariff. The farmer earns annual lease income (₹20,000 to ₹60,000 per acre per year in most states) without installing or maintaining the system. The investor or developer handles all technical work; the farmer provides land access.

This component is best for large landholders with land that has low agricultural productivity. Landowners who want to keep part of the plot under cultivation while hosting panels should also look at agrivoltaic design approaches, which combine crop production with solar generation on the same land.

Component B: Standalone Solar Pumps

Farmers without a grid connection who rely on diesel pumps for irrigation can replace them with standalone solar pumps. The central subsidy covers 30% of the benchmark cost; state subsidies add 30%; the farmer pays 40% (or takes a soft loan for 40%).

This component is ideal for farmers in areas with poor or absent grid connectivity.

Component C: Solarisation of Grid-Connected Pumps

Existing grid-connected agricultural pump users can add solar panels to their pumps. The solar power first runs the pump, and surplus is exported to the DISCOM grid at a feed-in tariff. This is the most financially attractive component for farmers who already have a grid connection, the solar system simultaneously eliminates pump electricity costs and generates export income. Installers scoping these projects can find dedicated PM-KUSUM ground-mount and pump solarisation resources covering component-specific requirements.

A 5 HP pump with a 7.5 kW solar system can generate ₹50,000 to ₹1 lakh per year in feed-in tariff income in sunny states (Rajasthan, Gujarat, MP), with a payback period of 3 to 5 years after subsidies.

The 3-Question Which-Scheme-Fits-You Test

Use this framework before approaching any installer or government office.

The 3-Question Scheme Selector Framework

  1. What is your electricity connection type?: If you have a domestic connection at home, PM Surya Ghar. If you have an agricultural connection or want to use agricultural land, KUSUM. If you have both, you may be eligible for both, separately.
  2. What problem are you solving?: Reducing your home electricity bill: PM Surya Ghar. Eliminating diesel pump costs on your farm: KUSUM Component B or C. Generating income from barren land: KUSUM Component A.
  3. Do you have a grid connection at the installation site?: Home with grid connection: PM Surya Ghar (on-grid system, net metering). Farm with no grid: KUSUM Component B (standalone pump). Farm with grid: KUSUM Component C (grid-connected pump solarisation).

These three questions determine your scheme with no ambiguity. If your situation is mixed (a farming household with both a domestic house and agricultural land) you may be eligible for both programmes simultaneously.

Financial Comparison: Net Cost After Subsidies

Understanding actual net cost helps you compare the two schemes directly.

Net cost after central and state subsidy for a 3 kW home system, a 5 HP standalone pump and a 7.5 kW pump solarisation
ScenarioGross CostCentral SubsidyState Subsidy (avg)Net Farmer/Homeowner Cost
3 kW home system (PM Surya Ghar)₹1,80,000–₹2,20,000₹78,000₹0–₹25,000 (state-dependent)₹77,000–₹1,42,000
5 HP standalone pump (KUSUM-B)₹3,50,000–₹4,00,00030% (~₹1,05,000)30% (~₹1,05,000)40% (~₹1,40,000)
7.5 kW pump solarisation (KUSUM-C)₹4,00,000–₹4,50,00030% (~₹1,20,000)30% (~₹1,20,000)40% (~₹1,60,000)

3.5 million. The target number of farmers to be covered under KUSUM Component B and C combined by 2026-27, per MNRE’s revised targets. Source - Saur Energy India{target=“_blank” rel=“noopener”}, 2026.

Application Process Comparison

The application experience differs significantly between the two schemes.

PM Surya Ghar:

  • Single national portal (pmsuryaghar.gov.in)
  • Aadhaar-based eKYC login
  • Online document upload
  • Real-time status tracking
  • PFMS direct bank transfer
  • Clear stage-by-stage timeline

KUSUM Yojana:

  • Varies by state, some states have online portals; others require district-level offline applications
  • State nodal agency (TNEDA, GEDA, HAREDA, MSEDCL, etc.) manages the process
  • Timeline is significantly longer, 3 to 12 months from application to installation in most states
  • Subsidy transfer varies, some states transfer directly; others deduct from invoice

For KUSUM specifically, contact your state’s nodal agency and your agricultural DISCOM to understand the local application process. The KUSUM agricultural solar subsidy guide covers state-specific KUSUM application processes in detail.

Common Mistakes When Choosing Between the Schemes

  • Applying to PM Surya Ghar with an agricultural connection: Ineligible. Agricultural connections must use KUSUM.
  • A farmer applying only to KUSUM when a home solar system is also needed: Missed opportunity. A farming household can benefit from both schemes simultaneously for different installations.
  • Expecting PM Surya Ghar to cover pump solarisation: The scheme covers only rooftop systems on residential buildings.
  • Treating KUSUM as a faster process than PM Surya Ghar: In practice, KUSUM typically takes significantly longer due to state-level implementation variability.
  • Not verifying module compliance for KUSUM equipment: Both schemes set conditions on the solar modules, which are checked against the ALMM lists, and MNRE publishes no ALMM list for inverters or pump controllers. Farmers are sometimes less familiar with this requirement and accept unverified modules from local dealers.

Where Qbits Fits

Qbits models

Specs below come from each model's datasheet. Confirm the exact model and current written terms with Qbits before you buy.

Browse all on-grid inverters →

FAQ

Frequently Asked Questions

What is the main difference between PM Surya Ghar and KUSUM Yojana?
PM Surya Ghar (Muft Bijli Yojana) is designed for residential homeowners with a domestic electricity connection who want rooftop solar. KUSUM Yojana (Kisan Urja Suraksha evam Utthaan Mahabhiyan) is designed for farmers and agricultural users who want to solarise their irrigation pumps or install ground-mounted solar on barren or fallow agricultural land. A homeowner applies to PM Surya Ghar; a farmer with an agricultural connection applies to KUSUM. The two schemes do not overlap for the same consumer.
Can a farmer apply for PM Surya Ghar?
A farmer who owns a residential house with a domestic electricity connection can apply for PM Surya Ghar for that house's rooftop solar. However, the agricultural connection and farm land are covered by KUSUM, not PM Surya Ghar. The two are separate applications for separate connection types. A farmer household could theoretically benefit from both - PM Surya Ghar for the home and KUSUM Component A or B for the farm - as long as the applications are for different connections and different installations.
What are the components of KUSUM Yojana?
KUSUM Yojana has three components. Component A provides for 10,000 MW of decentralised ground-mounted solar power plants (0.5 to 2 MW) on agricultural land, with electricity sold to DISCOMs. Component B subsidises standalone off-grid solar pumps for farmers without grid connections, replacing diesel pumps. Component C solarises existing grid-connected agricultural pump sets, reducing electricity consumption and allowing excess generation to be sold. Each component has different subsidy levels, eligibility, and application processes.
How much subsidy does KUSUM Yojana offer?
KUSUM subsidy levels vary by component and state. Under Component B (standalone solar pumps), the central subsidy is 30% of the benchmark cost. State governments typically add another 30%, leaving the farmer to pay 40% (or less with additional state support). Under Component C (grid-connected pump solarisation), central subsidy is 30% and state typically adds 30%, with 40% paid by the farmer or through soft loans. Some states like Rajasthan, Gujarat, and Maharashtra provide higher state subsidies that reduce farmer cost to 10 to 20%.
Which scheme has a faster application process - PM Surya Ghar or KUSUM?
PM Surya Ghar typically has a faster and more digitalised application process through the pmsuryaghar.gov.in portal, which provides real-time status tracking and direct bank transfer. KUSUM applications are handled through state nodal agencies and state DISCOMs, with more manual processes and longer timelines in many states. KUSUM Component B and C applications can take 3 to 12 months from application to installation depending on state, while PM Surya Ghar averages 45 to 90 days in 2026.
Is ALMM compliance required for KUSUM Yojana?
ALMM applies to solar modules (List-I) and cells (List-II), not to inverters or pump controllers. Equipment conditions under KUSUM come from the scheme guidelines and the state nodal agency, and they can include module requirements such as ALMM and domestic content. Confirm the current requirement for your component with the state nodal agency, and for any inverter or pump controller ask the supplier for the exact model's certificates.
Can I get both PM Surya Ghar and KUSUM benefits?
Yes, if you have both a domestic electricity connection (for your house) and an agricultural connection (for your farm), you can potentially access PM Surya Ghar for the residential rooftop and KUSUM Component B or C for the agricultural pump. These are separate government programmes with separate budgets and separate application portals. Both applications must be for genuinely separate connections and installations - you cannot claim two subsidies for a single solar system.
What happens to my electricity bill under KUSUM Component C?
Under KUSUM Component C, your agricultural pump is solarised - it generates solar power that first powers the pump. Any excess generation is exported to the DISCOM grid at a feed-in tariff rate. This means your agricultural electricity bill can drop to near zero during sunny months, and you receive income from exported units. In some states, this generates a net annual income of ₹50,000 to ₹1.5 lakh per solarised pump for farmers with surplus solar capacity.
Nirav Dhanani
Written by

Nirav Dhanani CEO, Qbits Energy

Co-founder & CEO driving Qbits Energy's product strategy and growth across India.

Related Reading
Policy 22 min

KUSUM Yojana: Agricultural Solar Subsidy Guide

KUSUM Yojana funding for solar pumps and plants in India: the three components, the MNRE funding split (30% central, at least 30% state on pumps), eligibility, state nodal agencies and how to apply.

Get Started

Check the rule that applies to your project

Use the issuing authority and your DISCOM documents to confirm the current rule, eligibility and application process for your location.