How to Size a Battery for a Hybrid Solar Inverter

Size a hybrid battery from measured loads, backup hours, usable capacity and losses. Check a worked example, power limits and battery compatibility.

Keyur Rakholiya
Keyur Rakholiya CTO
June 5, 2026 Updated October 14, 2026 18 min read

Short version. Size a hybrid solar battery from the energy needed during the outage, then check separately whether the battery and the inverter can deliver the required power, surge and charge current. The starting formula is nominal battery kWh = load energy ÷ (usable fraction × conversion efficiency). Use measured loads and the stated limits of the equipment you are quoting. The two worked examples further down show every step, including a recheck of the arithmetic.

Why battery sizing starts with loads, not inverter capacity

The inverter rating (5 kW, 10 kW) is the most power it can supply at one instant. It says nothing about how much energy your home needs over a long cut. Energy is power multiplied by time, and battery capacity is measured in kilowatt-hours, not kilowatts.

A 5 kW hybrid inverter running at full output from a 5 kWh battery would be flat in about an hour, and less once usable capacity and losses are counted. Pair the same inverter with 15 kWh and a 1.5 kW load can run for many hours. The inverter sets the power ceiling. The battery sets the duration.

Most sizing mistakes come from answering only half the question.

Energy decides how long backup lasts. It is the load in watts multiplied by the hours you want it to run, and it is what the kWh figure addresses.

Power decides whether backup works at all. It is the draw when everything you backed up runs together, plus the surge when a motor starts. A battery holding plenty of energy can still be unable to deliver that rate. A design that passes energy and fails power runs your lights for hours and trips when the refrigerator compressor starts. Both checks have to pass.

The second misunderstanding is total home load versus critical load.

  • Total home load is everything running at peak. It sizes the solar array and the inverter.
  • Critical backup load is what must run during a cut: fans, lights, refrigerator, router, chargers. It sizes the battery in kWh.
  • Backup duration is how many hours the grid is unavailable at your address. It is the biggest single driver of battery cost.

Air conditioners, geysers, induction cooktops and washing machines each draw hundreds of watts to a couple of kilowatts. Putting them on a battery for a long outage multiplies the bank several times over, so most backup designs leave them off the backed-up circuits on purpose. If you do need one, decide it explicitly, because it changes both the kWh and the surge requirement.

List only the loads you intend to back up

Walk through the home and list every appliance you genuinely need during a cut. Record watts and quantity from the nameplate or a plug-in meter. For cycling appliances such as refrigerators, measured energy over a representative day is more useful than nameplate power. Motors also have starting requirements that an energy total cannot show.

The table uses assumed round-number wattages for illustration. They are not measured data for any particular appliance, so replace them with your own readings.

Assumed critical load list for a 3BHK and a 2BHK home (round-number wattages for illustration)
ApplianceAssumed power each3BHK count3BHK watts2BHK count2BHK watts
Ceiling fan70 W4280 W2140 W
LED light12 W896 W672 W
Refrigerator150 W1150 W1150 W
Wi-Fi router15 W115 W115 W
Laptop charger65 W165 W00 W
Phone chargers20 W480 W240 W
Television80 W180 W180 W
Critical load total766 W497 W

Check the sums: 280 + 96 + 150 + 15 + 65 + 80 + 80 = 766 W for the 3BHK, and 140 + 72 + 150 + 15 + 40 + 80 = 497 W for the 2BHK. A 1 HP-class water pump, if the building depends on it during cuts, is a separate motor load with its own starting surge. The examples below add it as an extra with a stated run time.

Choose backup duration from your own records

Record how long outages last at your property and which loads must run through them. National averages are poor guides to your feeder. The Ministry of Power reported through the Press Information Bureau that average supply reached 22.6 hours a day in rural areas and 23.4 hours in urban areas in 2025. An average of that kind hides short daily cuts, long storm outages and feeders that are far worse than the mean.

For the worked examples later in this guide the outage lengths are assumptions: 8 hours for a 3BHK and 2 hours for a 2BHK. They are not statements about any city.

Sensitivity: the same 500 W load at different runtimes

Nominal battery energy for the same 500 W load at 2, 4 and 8 hours, at 80% usable and 90% efficiency
Backup durationLoad energyNominal energy at 80% usable and 90% efficiency
2 hours1 kWh1.39 kWh
4 hours2 kWh2.78 kWh
8 hours4 kWh5.56 kWh

Each row is 0.5 kW × hours ÷ (0.80 × 0.90). The table changes duration only. It does not prove the battery can deliver the load’s power or start a motor.

The five-step sizing method

Run these five steps in order, using the load list and outage log from the two sections above. Each step has a formula, and each worked example below uses them unchanged.

Step 1: Backup load

Sum the critical loads in watts. Add a margin for measurement error and extra devices. This guide uses 15 percent. Convert to kW.

Step 2: Duration

Take the longest normal outage from your log, in hours.

Step 3: Load energy

Load energy (kWh) = Σ (load W × hours) ÷ 1,000. Add any extra loads with their own run times, such as a pump for half an hour.

Step 4: From load energy to nominal capacity

Depth of discharge (DoD) is the share of nameplate capacity you draw before recharging. The conversion efficiency allowance covers losses between the battery and the load.

This guide uses an efficiency allowance of 0.90 as a deliberately conservative planning figure. It is not a datasheet value. The QBH datasheets print a 97.6 percent (3 to 6 kW) or 98 percent (7 to 8 kW and three-phase) maximum efficiency, but that is a peak figure at a favourable operating point, and losses also arise in wiring, the BMS and standby draw.

Step 5: Engineering fit

Check the current the battery and the inverter must carry, the battery voltage window, the supported chemistry and communication, and whether the array can recharge the bank before the next outage. The sections below cover each of these.

Why the usable fraction is not 100 percent

Discharging a battery fully shortens its cycle life, so makers specify a depth of discharge and rate cycle life at that depth. Typical planning figures by chemistry:

Typical planning depth of discharge by battery chemistry, with the sources cited
ChemistryTypical planning DoDWhat the sources say
Lithium iron phosphate (LFP)about 80 to 95% depending on product and inverterThe Pylontech US5000 manual lists 4,800 Wh nominal, 4,560 Wh usable and 95% depth of discharge, available with inverters that fully follow Pylontech’s protocol. Many installers plan on 80% to keep margin.
Tubular lead-acidabout 50% when you want long lifeWikipedia’s deep-cycle article puts a depth of around 50% as the best balance of life against cost. Luminous prints up to 1,500 cycles at 80% DoD for its 150 Ah LPTT12150H tubular battery.

Both rows are planning ranges, not rules. The figure that counts is the one on the datasheet of the battery you are quoting, at the temperature and discharge rate you will use. The LFP battery glossary page explains the underlying chemistry.

Match the battery to inverter charge and discharge current

Every battery has a maximum charge and discharge current. The inverter has its own. The system has to stay inside the lower of the two, and the battery’s rating decides which one that is. C-rate expresses current relative to capacity: a 100 Ah battery charged at 50 A is at 0.5C.

The Qbits datasheets publish the maximum charge and discharge current of each QBH model at a 48 V rated battery voltage. Multiplying by 48 V gives the power the battery port can pass, and doubling the current in Ah gives the bank size at which that current is 0.5C.

Qbits QBH hybrid models, maximum battery charge and discharge current at 48 V rated battery voltage
QBH modelMax charge/discharge currentBattery port power at 48 VBank at 0.5C of that current
QBH-3KS48P75 A3.60 kW7.2 kWh
QBH-3K6S48P90 A4.32 kW8.64 kWh
QBH-4KS48P100 A4.80 kW9.6 kWh
QBH-4K6S48P110 A5.28 kW10.56 kWh
QBH-5KS48P and QBH-6KS48P120 A5.76 kW11.52 kWh
QBH-7KS48P175 A8.40 kW16.8 kWh
QBH-7K6S48P and QBH-8KS48P190 A9.12 kW18.24 kWh
QBH-5KS48P3 (three-phase)120 A5.76 kW11.52 kWh
QBH-6KS48P3125 A6.00 kW12.0 kWh
QBH-7KS48P3150 A7.20 kW14.4 kWh
QBH-8KS48P3190 A9.12 kW18.24 kWh
QBH-10KS48P3210 A10.08 kW20.16 kWh
QBH-12KS48P3250 A12.00 kW24.0 kWh
A0100200300QBH-3KS48P75 AQBH-3K6S48P90 AQBH-4KS48P100 AQBH-4K6S48P110 AQBH-5KS48P / 6KS48P120 AQBH-7KS48P175 AQBH-7K6S48P / 8KS48P190 AQBH-5KS48P3120 AQBH-6KS48P3125 AQBH-7KS48P3150 AQBH-8KS48P3190 AQBH-10KS48P3210 AQBH-12KS48P3250 AA0100200300QBH-3KS48P75 AQBH-3K6S48P90 AQBH-4KS48P100 AQBH-4K6S48P110 AQBH-5KS48P /6KS48P120 AQBH-7KS48P175 AQBH-7K6S48P /8KS48P190 AQBH-5KS48P3120 AQBH-6KS48P3125 AQBH-7KS48P3150 AQBH-8KS48P3190 AQBH-10KS48P3210 AQBH-12KS48P3250 A
Maximum battery charge and discharge current by Qbits QBH model
ItemValue (A)
QBH-3KS48P75 A
QBH-3K6S48P90 A
QBH-4KS48P100 A
QBH-4K6S48P110 A
QBH-5KS48P / 6KS48P120 A
QBH-7KS48P175 A
QBH-7K6S48P / 8KS48P190 A
QBH-5KS48P3120 A
QBH-6KS48P3125 A
QBH-7KS48P3150 A
QBH-8KS48P3190 A
QBH-10KS48P3210 A
QBH-12KS48P3250 A
Maximum battery charge and discharge current by Qbits QBH modelSource: Qbits QBH hybrid inverter datasheets (3 to 6 kW, 7 to 8 kW and three-phase families), as printed in October 2026; current at 48 V rated battery voltageInverter limits, not an approval for any battery. Check the battery's own limits.

Source: the Qbits datasheets for the 3 to 6 kW, 7 to 8 kW and three-phase QBH families, as printed in October 2026. The last column is arithmetic (2 × amps × 48 V), not a Qbits recommendation. These are inverter limits. They do not authorise that current through any battery you attach.

A worked current check with a published battery

Take the Pylontech US5000 as an illustration of how a battery’s own limits enter the check. Its operation manual (September 2024) lists a nominal 48 V, 4,800 Wh and a recommended charge and discharge current of 80 A, with 100 A maximum continuous. Those currents apply for a cell temperature of 10 to 40 °C and are derated outside that range.

  • One module against a 75 A inverter limit (the QBH-3KS48P): 75 A is below the 80 A recommended figure, so no extra limit is needed from the current point of view.
  • One module against a 120 A inverter limit (for example the QBH-5KS48P): 120 A exceeds even the 100 A maximum continuous, so you would either set a lower charge limit in the inverter or fit two modules side by side, which carry 160 A recommended and 200 A maximum together.

If a battery communicates with the inverter, its BMS can request lower limits. Without communication the inverter does not know the battery’s limits, so you have to set the charge current in the inverter menu from the battery datasheet. Check that the exact inverter model has that setting and write the value you set into the commissioning record. The battery connection guide explains the data link.

Choosing between a 48 V and a 96 V battery system

Battery voltage comes from the inverter you buy, not from preference. The datasheet states the battery voltage window the inverter accepts, and the whole bank must stay inside it from empty to full.

What changes with voltage

Current for a given power halves when voltage doubles. At 5,000 W and 90 percent efficiency:

  • 48 V: 5,000 ÷ (48 × 0.90) = 115.7 A
  • 96 V: 5,000 ÷ (96 × 0.90) = 57.9 A

Lower current means thinner cable, less heat and less voltage drop, which matters when the battery sits some distance from the inverter. The cost is that higher-voltage stacks need more cells in series and are offered by fewer makers. The cable arithmetic is worked in the battery connection guide.

Cell count

A lithium iron phosphate cell is nominally 3.2 V. Sixteen in series give 51.2 V, which is why many “48 V” LFP products are labelled 51.2 V. Other makers use a different cell count and label their product 48 V, such as the Pylontech module quoted above. The label is a family name and not a compatibility statement.

Which applies to Qbits models

The QBH single-phase and three-phase hybrid datasheets all print 48 V as the rated battery voltage, with maximum charging voltage of 60 V or less (configurable). Some other hybrid families are built around high-voltage battery stacks instead, so always read the inverter datasheet before choosing cells. Do not stack lower-voltage batteries to hit a number: four 24 V units in series make 96 V, outside a 48 V inverter’s window, while two in series make 48 V and use half of what you bought.

LFP versus lead-acid: the battery chemistry decision

Chemistry decides depth of discharge, cycle life, temperature tolerance and maintenance, so it matters as much as the kWh figure.

What the published figures say

Published figures for one LFP battery and one tubular lead-acid battery
LFP exampleTubular lead-acid example
ProductPylontech US5000 (manual, Sep 2024)Luminous LPTT12150H (product page, Oct 2026)
Nominal48 V, 4,800 Wh12 V, 150 Ah at C10 (1.8 kWh)
Printed depth of discharge95%cycle life stated at 80%
Printed cycle lifemore than 8,000 cycles at 25 °C in the 2024 manual (the 2026 datasheet prints more than 6,000), under conditions to be confirmed with the makerup to 1,500 cycles at 80% DoD
Temperature notecharge 0 to 50 °C, discharge minus 10 to 50 °Cnot stated on the page
Wateringnone stated in the manualtubular lead-acid needs periodic top-up, at the maker’s interval

Battery University’s lead-acid article lists deep-cycle lead-acid at about 400 to 500 cycles at 50% depth and 1,000 or more at 30%, against 150 to 200 at 100%. That is a generic table and not an Indian tubular datasheet, so the two sets of numbers differ. The lesson is the same: cycle count depends heavily on depth, and both figures must be taken from the product you buy.

Cost per kWh delivered, and a ten-year check

A fair cost comparison needs three inputs per product: price, usable energy per cycle and cycles at that depth.

Prices below were shown on the manufacturers’ pages on 14 October 2026 and will change. Cycle figures are each maker’s own, and the Loom Solar page gives only a general range.

Cost per kWh delivered for two batteries, prices shown on manufacturer pages on 14 October 2026
ProductPrice shownNominalDoD usedCycles usedCost per kWh delivered
Luminous LPTT12150H₹17,999 incl. taxes1.8 kWh80% (as printed)1,500₹17,999 ÷ (1.8 × 0.80 × 1,500) = ₹8.33
Loom Solar CAML 5.12 kWh Wall Mount₹1,15,0005.12 kWh80% (assumed)1,500 to 2,000 (page’s general lithium range)₹18.72 at 1,500 cycles, ₹14.04 at 2,000

On these inputs the tubular battery is cheaper per kWh delivered, which shows why a ten-year check matters more than the label. Daily cycling is 365 × 10 = 3,650 cycles. A product rated 1,500 cycles needs 3,650 ÷ 1,500 = 2.43 banks over ten years if it reaches its rating, while a product rated 6,000 or more would not need replacing on cycle count. Efficiency losses, replacement labour, watering and the capacity fade before end of life are not in the table. Use it as a method and swap in your quoted numbers.

Common mistakes in hybrid battery sizing

Sizing for total home load instead of critical load

The most expensive error. A household that uses 20 kWh a day buys a bank to match, then runs the air conditioner, geyser and induction cooktop in a cut and drains it in a few hours. Size the bank for the load that runs during the outage, and review the load list before signing a purchase order.

Ignoring the charge current limit

A small bank on a large inverter can be charged faster than its maker intends. A 120 A inverter limit on one 100 Ah module is 1.2C, above that module’s published 100 A maximum continuous. Where the link to the BMS is missing or the settings are not applied, nothing stops it.

Mismatching battery voltage to the inverter window

Voltage is a hard limit. Check the datasheet range before buying a single cell, and do not rearrange series strings to make a different battery fit.

Choosing lead-acid because it is familiar

A UPS battery may cycle a few times a month. A solar backup battery can cycle every day. At 365 cycles a year, a 1,500-cycle rating is about 4.1 years if it is cycled at the depth that rating assumes (1,500 ÷ 365). Familiar is not the same as suited to a daily duty cycle.

For the surrounding decision on whether storage makes sense at all, read the on-grid vs hybrid guide.

Worked example 1: 3BHK, 8-hour outage (assumed)

Home profile. Three-bedroom home. The 8-hour outage is an assumption for the calculation, not a figure for any city.

  1. Backup load. Base critical load from the table: 766 W. Add 15 percent: 766 × 1.15 = 880.9 W, or 0.881 kW. The pump (750 W for half an hour) and a 180 W air cooler (for 4 hours) are treated as extras.
  2. Duration. 8 hours.
  3. Load energy. Continuous load: 0.881 kW × 8 h = 7.047 kWh. Pump: 0.75 kW × 0.5 h = 0.375 kWh. Cooler: 0.18 kW × 4 h = 0.72 kWh. Total: 7.047 + 0.375 + 0.72 = 8.142 kWh.
  4. Nominal capacity, LFP at 80 percent DoD and 0.90 efficiency. 8.142 ÷ (0.80 × 0.90) = 8.142 ÷ 0.72 = 11.31 kWh. In amp-hours at 51.2 V: 11,309 Wh ÷ 51.2 V = 220.9 Ah.
  5. Pick a bank. Three 5.12 kWh, 100 Ah, 51.2 V modules give 15.36 kWh and 300 Ah. Two modules would give 10.24 kWh, and 10.24 × 0.80 × 0.90 = 7.37 kWh deliverable, which is less than the 8.142 kWh needed. Three modules deliver 15.36 × 0.80 × 0.90 = 11.06 kWh, a margin of 11.06 ÷ 8.142 = 1.36 times.
  6. Engineering fit. Using a 5 kW-class inverter with a 120 A battery limit (for example the QBH-5KS48P): 120 A on a 300 Ah bank is 0.40C, and the battery datasheet still has to confirm that this current is allowed. Peak simultaneous load is 766 + 750 + 180 = 1,696 W, plus margin, well inside a 5 kW backup rating. Battery current at that load is 1,696 ÷ (51.2 × 0.90) = 36.8 A.
  7. Recharge. The battery gives up 8.142 ÷ 0.90 = 9.05 kWh of DC energy. At 5.09 peak sun hours and an assumed 0.80 performance allowance, that needs 9.05 ÷ (5.09 × 0.80) = 2.22 kWp of array for the battery alone. If daytime household loads add 3 kWh (an assumption), that needs a further 3 ÷ (5.09 × 0.80) = 0.74 kWp, so about 2.96 kWp in total before roof, shading and monsoon effects.

Result. A 15.36 kWh LFP bank at 48 V class with a 5 kW-class hybrid inverter, and an array of at least 3 kWp, subject to the datasheets and a site check. Check each figure against your own load log.

Worked example 2: 2BHK, 2-hour outage (assumed)

  1. Backup load. 497 W base. With 15 percent margin: 497 × 1.15 = 571.55 W, or 0.572 kW.
  2. Duration. 2 hours (an assumption).
  3. Load energy. 0.572 kW × 2 h = 1.143 kWh.
  4. Nominal capacity, LFP at 80 percent and 0.90. 1.143 ÷ 0.72 = 1.59 kWh, or 1,588 Wh ÷ 51.2 V = 31.0 Ah.
  5. Pick a bank. A bank this small is smaller than most 48 V-class modules. A 4.8 kWh module such as the Pylontech US5000 delivers 4.8 × 0.80 × 0.90 = 3.46 kWh, enough for about 3.46 ÷ 0.572 = 6.0 hours at this load. Extra headroom is a by-product of module size, not a design goal.
  6. Engineering fit. A 3 kW-class inverter such as the QBH-3KS48P has a 75 A limit. On a 100 Ah module that is 0.75C, below that module’s recommended 80 A. Without a published compatibility confirmation for the specific pairing, treat it as an arithmetic illustration only.
  7. Recharge. DC energy drawn: 1.143 ÷ 0.90 = 1.27 kWh. At 5.56 peak sun hours (Mumbai, as in the table below) and 0.80 performance: 1.27 ÷ (5.56 × 0.80) = 0.29 kWp. Recharge is not the constraint here.

Result. The kWh need is small. The real decisions are module size, charge current and compatibility.

Every figure in both examples follows from the stated formulas, so you can repeat the arithmetic with your own load list and outage hours.

How many solar panels are needed to recharge the battery?

The array has to run daytime loads and refill the battery before the next outage. In high-outage areas this cannot rely on overnight grid charging.

The 0.80 allowance covers module temperature, wiring, MPPT conversion and battery charging losses, and is an assumption to replace with your installer’s figure. Peak sun hours at optimum tilt for reference cities, from the Global Solar Atlas as compiled in our irradiance guide (queried 24 September 2026):

Peak sun hours at optimum tilt by city, annual average (Global Solar Atlas, queried 24 September 2026)
CityPeak sun hours at optimum tilt (annual average)
Lucknow5.09
Patna4.99
New Delhi5.10
Mumbai5.56
Bengaluru5.46
Chennai5.47
Ahmedabad6.01
hours/day02468Ahmedabad6.01 hours/dayMumbai5.56 hours/dayChennai5.47 hours/dayBengaluru5.46 hours/dayNew Delhi5.1 hours/dayLucknow5.09 hours/dayPatna4.99 hours/dayhours/day02468Ahmedabad6.01 hours/dayMumbai5.56 hours/dayChennai5.47 hours/dayBengaluru5.46 hours/dayNew Delhi5.1 hours/dayLucknow5.09 hours/dayPatna4.99 hours/day
Peak sun hours at optimum tilt, annual average, by city
ItemValue (hours/day)
Ahmedabad6.01 hours/day
Mumbai5.56 hours/day
Chennai5.47 hours/day
Bengaluru5.46 hours/day
New Delhi5.1 hours/day
Lucknow5.09 hours/day
Patna4.99 hours/day
Peak sun hours at optimum tilt, annual average, by citySource: Global Solar Atlas, as compiled in the Qbits irradiance guide (queried 24 September 2026)Annual averages. Monsoon months give less.

These are annual averages. Monsoon months give less, so check monthly values for the weeks when outages are most likely. The string sizing calculator checks PV string voltage and current against the selected inverter.

Compare cost using complete quotes

Request the battery, inverter, protection, enclosure, communications equipment, installation and warranty terms as separate items. Compare usable energy and delivered power, not only price per amp-hour or per box.

The battery comparison guide explains warranty and chemistry checks. The 5 kW hybrid price guide provides a dated inverter example and the quote scope.

Where Qbits hybrids fit

The Qbits QBH families are 48 V-class hybrid inverters, with battery current of 75 to 120 A for the 3 to 6 kW models, 175 to 190 A for the 7 to 8 kW models and 120 to 250 A for the 5 to 12 kW three-phase models, depending on the exact model. Check the exact model datasheet for supported battery types and confirm your battery against the compatibility list with Qbits before you buy; the datasheet downloads hold the current files.

Your handover worksheet

Keep the load list, target runtime, usable-fraction assumption, loss allowance, chosen model numbers, configured current limits and warranty documents. Ask the installer to demonstrate the agreed backup circuits and document the commissioning results.

Qbits models

Specs below come from each model's datasheet. Confirm the exact model and current written terms with Qbits before you buy.

Browse all hybrid inverters →

FAQ

Frequently Asked Questions

How do I calculate the battery size for a hybrid solar inverter?
Use five steps. List only the loads you want during an outage and add their watts. Choose the backup hours from your own outage log. Multiply watts by hours to get load energy in kWh. Divide that by the depth of discharge and by a conversion-efficiency allowance to get nominal battery kWh, then divide the watt-hours by the battery voltage to get Ah. Finally check that the battery and the inverter can carry the charge and discharge current. For a 0.88 kW load for 8 hours plus two short extras, the worked example below lands at about 11.3 kWh nominal.
What is depth of discharge and why does it affect battery sizing?
Depth of discharge (DoD) is the share of nameplate capacity you draw before recharging. Makers publish cycle life at a stated DoD, and cycle life falls as the discharge gets deeper. Planning ranges are roughly 80 to 95 percent for lithium iron phosphate, with the exact figure printed on the battery datasheet, and about 50 percent for lead-acid when you want a long life. Dividing your load energy by the DoD gives the nameplate capacity you must buy, so ignoring it leaves a bank that is too small.
Should I use LFP or lead-acid batteries with a hybrid inverter?
Decide from the datasheets, not from the chemistry name. Compare the cycle rating at your planned DoD, the cost per kWh delivered over that cycle life, the temperature limits, the maintenance burden and whether the inverter is approved for the battery. Lithium iron phosphate usually allows a deeper daily discharge and needs no watering, while tubular lead-acid costs less per nameplate kWh. Daily cycling is 3,650 cycles in ten years, so check that figure against each rating.
What is the difference between a 48 V and a 96 V battery system?
Voltage sets the current for a given power. At 5 kW and 90 percent efficiency a 48 V bank carries about 116 A and a 96 V bank about 58 A, so the higher voltage allows thinner cable and less heat. You do not choose it freely, because the inverter datasheet fixes the battery voltage window. The Qbits QBH families on this site are 48 V rated, so a 96 V bank does not fit them.
Can I mix old and new batteries in a hybrid solar system?
Generally no. Modules of different age, capacity or chemistry age at different rates, and the weakest one limits charge and discharge for the whole bank. Battery makers publish their own rules for adding modules, including model, age gap and firmware. Get those rules before the first purchase, and expect that an old bank may need replacing rather than extending.
How do outage hours affect battery sizing?
Backup hours are the biggest driver of battery size because energy scales with time. National averages hide local reality. The Ministry of Power reported average supply of about 22.6 hours a day in rural areas and 23.4 hours in urban areas for 2025, which says little about your feeder. Log your own outages for a few weeks, design for the longest normal cut rather than the average, and treat any generic city figure as an assumption.
What happens if the inverter's charge current is higher than the battery allows?
The battery can be charged faster than its maker recommends. With a working communication link the BMS can request a lower limit. Without one you must set the inverter's charge current limit yourself, using the battery datasheet. For example, one published 48 V module recommends 80 A and allows 100 A continuous, so a 120 A inverter limit needs a lower setting or more modules.
How many solar panels do I need to recharge the battery in a day?
Divide the battery energy you drew by the daily peak sun hours and by a performance allowance of about 0.80. In the Lucknow example the battery gives up 9.05 kWh of DC energy a day, and at 5.09 peak sun hours that needs 9.05 ÷ (5.09 × 0.80) = 2.22 kWp for the battery alone, plus the array share that runs daytime loads. Monsoon weeks, shading and orientation change this, so use the monthly figures for the site.
Keyur Rakholiya
Written by

Keyur Rakholiya CTO, Qbits Energy

Listed by Qbits as its CTO. Current role, technical responsibilities and credentials require confirmation by the company owner.

Related Reading
Comparison 13 min

Best Solar Battery Brands in India 2026

Compare solar battery brands in India using exact product evidence, with conditional picks for lithium and tubular systems plus compatibility checks.