Skip to content
Solar Software

Solar Takeoff Software: Auto-BOQ Guide 2026

Solar takeoff software pulls quantities straight from the design canvas. Compare SurgePV, Aurora, HelioScope, and OpenSolar on auto-takeoff and export.

Nirav Dhanani
Nirav Dhanani CEO
June 14, 2026 Updated October 14, 2026 9 min read

Solar takeoff software is the tool an estimator uses to turn a finished design into a bill of quantities that procurement and the install crew can act on. The pain is well known. A residential job can swallow two hours of manual counting. A C&I bid can swallow a full day. Estimators tab through PDF drawings, tally modules, measure conduit on a screen ruler, guess at mounting hardware, and type it all into a spreadsheet that nobody trusts. The right solar takeoff software removes that step. It reads the design canvas, applies the hardware rules, and writes the BOQ automatically. SurgePV’s auto-BOQ does exactly this on every paid plan.

See auto-takeoff on your own project

Bring a real roof. We will design it, run the 8,760-hour shade study, and export the full BOQ inside the call. No slideware.

Book a Free Demo

20 minutes · Bring a real project · No credit card

What a Solar Takeoff Includes

A complete solar takeoff is not a module count. It is the full procurement and labour list the project office needs to order materials, schedule crew, and price the bid. A useful takeoff lists every category below.

How SurgePV Auto-Generates the Takeoff

SurgePV treats the design canvas as the single source of truth. Every object on the canvas carries the catalog rules that govern its quantity. When the design changes, the BOQ changes.

When the design is locked, the platform writes the BOQ. Modules come from the array. Rail length comes from the row geometry. Clamp count comes from module count plus end clamps per row. DC cable length comes from the routed string paths set during string sizing. AC cable length comes from the run from inverter to the service panel. Conduit follows the routed paths with a configurable fill factor. Labour follows the editable rate table.

The result exports as a branded solar proposal PDF, an XLSX takeoff for the procurement team, and a DXF/DWG export for the install crew. The whole bundle drops out of a single canvas inside the solar design platform.

Solar Takeoff Software Across Tools

Most platforms market themselves as solar design software. Far fewer ship a true auto-takeoff. The table below compares the four most common tools an estimator will evaluate in 2026.

Solar takeoff capabilities compared across SurgePV, Aurora, HelioScope and OpenSolar
CapabilitySurgePVAuroraHelioScopeOpenSolar
Auto-BOQ from canvasYes, on every paid planAdd-on moduleLimited, design focusedResidential focus
Hardware-neutral catalog70,000 modules, 12,000 invertersLarge, curatedLarge, curatedCurated, residential heavy
Labour line itemsEditable rules, includedManual rulesManual rulesLimited
PDF, XLSX, CSV exportAll threePDF and XLSXPDF and XLSXPDF and CSV
AutoCAD DXF or DWGNative exportAdd-onLimitedNot native
8,760-hour module-level shadeEvery paid planHigher tierYesLimited
Entry price per seat1,299 dollars per yearHigher and tieredHigher and tieredPer-project pricing

The pattern is clear. SurgePV bundles auto-takeoff and the export formats procurement actually uses into the base seat price. Competing platforms either add modules at extra cost or leave the takeoff partial. See the full breakdown on SurgePV pricing.

One flat seat price, every feature included

SurgePV ships auto-BOQ, 8,760-hour shade, Clara AI, and DXF export on every paid plan. No add-ons, no usage meters, no surprise invoices on the renewal date.

Compare Plans

Annual billing · Cancel anytime · Includes Clara AI

Real Example: 50 kW C&I Takeoff in 30 Seconds

Picture a 50 kW rooftop C&I project on a warehouse in Pune. The estimator imports the satellite image, draws the building footprint, sets the parapet height, and lets Clara AI place the array. The design takes under twenty minutes.

When the estimator clicks Generate BOQ, this is what drops out, in under thirty seconds.

  • 92 modules at 545 W, monocrystalline bifacial, plus 2 spares.
  • 1 string inverter at 50 kW, three-phase, six MPPT inputs.
  • 184 meters of mounting rail, 6063-T6 aluminium.
  • 188 mid clamps and 16 end clamps to suit a 35 mm frame.
  • 24 L-feet and flashings rated for the metal deck.
  • 92 pairs of MC4 connectors and 320 meters of 4 sq mm DC cable.
  • 80 meters of 16 sq mm AC cable from inverter to the LT panel.
  • 110 meters of 32 mm UV-rated conduit with eight sweeps.
  • 1 DC isolator at 1,000 V DC and 1 AC isolator at 63 A.
  • 1 monitoring gateway, 1 irradiance sensor, 1 module temperature sensor.
  • 96 hours of mounting labour, 24 hours of wiring, 8 hours of commissioning.
  • A contingency line at 3 percent for breakage and offcuts.

The same export carries the shade report, the yield estimate, the proposal PDF, the single line diagram, and the DXF for the install crew. The estimator never opened a spreadsheet.

Common Takeoff Mistakes

The bids that lose money rarely lose on module pricing. They lose on the lines the estimator forgot. The five most common misses.

  1. Missing labour. The BOQ lists every part and zero hours. The crew shows up on day one and the margin is gone by lunchtime.
  2. Forgetting AC cable to the meter. The DC side is detailed and the AC run to the service panel is left blank. On a long warehouse roof that single line can swing the bid by tens of thousands of rupees.
  3. Wrong mounting count. End clamps are not mid clamps. Splices are not free. Counting one clamp per module instead of one per module plus end clamps per row understates the hardware by ten to fifteen percent.
  4. Missing spare parts. Modules break in transit. MC4 connectors get crushed. A spare allowance of two to three percent protects the install schedule.
  5. No contingency. Cable offcuts, breakage, weather delays. A two to three percent contingency line keeps the project office honest with the buyer.

Auto-takeoff does not eliminate judgment. It does eliminate the lines that get skipped because the estimator was tired.

Integration With Procurement and CRM

The takeoff lives downstream of design and upstream of procurement. SurgePV exports the BOQ as CSV, which means it slots into any ERP, any inventory system, and most quoting tools without a custom integration. Teams that want a clean handoff to a buyer-facing quote often pair SurgePV with QuickEstimate to turn the BOQ into a customer-ready price sheet without re-typing line items.

For sales workflows, the same export feeds the CRM. Deal stage, BOQ version, and quoted price stay aligned. When the engineer revises the design, the auto-BOQ updates and the CRM pulls the new total. That is the loop most teams describe as the difference between bidding ten jobs a week and bidding fifty.

Who Should Choose Each Tool

A few honest recommendations based on the shape of the team.

  • Solo installer or two-person residential shop. Pick a tool with a fast residential flow and a clean proposal PDF. SurgePV Individual at 1,899 dollars per year fits if you also bid the occasional C&I roof.

  • Three to five person mixed residential and C&I team. SurgePV at 1,299 to 1,499 dollars per seat is the sweet spot. Auto-BOQ, shade, and DXF export are included on every seat.

  • Residential-only retail sales floor with light engineering. OpenSolar is a reasonable starting point, but most teams outgrow the BOQ depth within a year.

  • Utility-scale only. Use a dedicated utility-scale tool. SurgePV is built for residential and C&I rooftop and carport work up to multi-megawatt jobs.

For most installer teams in 2026, the math is simple. Pick the solar design software that ships auto-takeoff, hardware neutrality, and export formats your procurement team already uses. That short list is short for a reason.

Try auto-takeoff on a real bid

Free trial, no credit card. Build a design, generate the BOQ, and export the DXF inside one session. If the takeoff saves you an hour on your next bid, you have your answer.

Book a Free Demo

Or see pricing · explore the platform

FAQ

Frequently Asked Questions

What is solar takeoff software?
Solar takeoff software counts the quantities an installer needs to buy and install a system. That includes modules, inverters, racking rails, clamps, DC and AC cable lengths, conduit runs, combiner boxes, disconnects, breakers, and labour hours. Modern solar takeoff software pulls those counts straight from a finished design canvas instead of asking the estimator to tally them by hand on a spreadsheet.
How is auto-takeoff different from manual takeoff?
Manual takeoff means an estimator opens the design, counts modules, measures cable runs with a ruler tool, and types every line into Excel. A single residential job can absorb two hours. Auto-takeoff reads the same design canvas, applies the rules in the hardware catalog, and writes the full bill of quantities in seconds. The estimator reviews instead of types.
Does SurgePV's takeoff include labour estimates?
Yes. SurgePV's auto-BOQ ships with editable labour rules for module mounting, rail install, DC and AC wiring, inverter setup, and commissioning. Set the labour rate per hour or per watt for your crew, and every new design returns a labour line on the takeoff. You can override any line before exporting the final bid.
Can the takeoff export to procurement systems?
Yes. SurgePV exports the takeoff to PDF, XLSX, and CSV. The CSV maps cleanly into procurement tools, ERPs, and the QuickEstimate quoting flow. You can also push the DXF and DWG drawings alongside the BOQ so the warehouse, the crew, and the buyer all work from the same source file.
Is SurgePV's takeoff hardware-neutral?
Yes. SurgePV ships a catalog of more than 70,000 modules and 12,000 inverters from every major brand. The takeoff respects whatever hardware you picked. If you swap a 540 W module for a 580 W module, the BOQ updates the count, the rail length, the clamp quantity, and the DC string layout. No vendor lock-in.
How accurate is auto-takeoff?
Auto-takeoff is as accurate as the design canvas behind it. SurgePV builds the design from a satellite-driven AI 3D model, so the roof outline, obstructions, and azimuths match the real site. Cable lengths follow the routed conductor paths. Most teams report BOQ variance under three percent against the as-built drawings.
What does solar takeoff software cost?
SurgePV charges 1,899 dollars per user per year for the Individual plan, 1,499 dollars per seat for the 3-User Team, and 1,299 dollars per seat for the 5-User Team. Auto-BOQ, the 8,760-hour shade engine, Clara AI, and AutoCAD export are included on every paid plan. The free trial does not ask for a credit card.
Does the takeoff cover residential and C&I?
Yes. SurgePV's takeoff handles single-family residential, multi-family, and commercial and industrial designs up to multi-megawatt rooftop and carport jobs. The same canvas generates the BOQ, the shade report, the yield model, and the AutoCAD DXF or DWG drawing set, so the same workflow scales across job sizes.
Nirav Dhanani
Written by

Nirav Dhanani CEO, Qbits Energy

Co-founder & CEO driving Qbits Energy's product strategy and growth across India.

Related Reading
Solar Software 9 min

Solar Bid Software: Win More Deals in 2026

Solar bid software should produce a bankable proposal in under 20 minutes. Here is how SurgePV ships fast layout, yield, finance, and branded output.

Get Started

Continue your solar software research

Compare the workflow, inputs and limitations that matter to your task before choosing software.