Solar permit design software is the difference between shipping a permit pack on Tuesday and waiting on a third-party drafter until Friday. In 2026, installers face the same choice they faced five years ago, only the math has shifted. Design the SLD, layout, and BOQ in-house with the right solar design software, or outsource the whole pack to a permit-design service. This article walks through what a permit pack actually contains, how a modern solar design platform like SurgePV generates each sheet, and the honest tradeoffs between owning the workflow and paying somebody else to draw it for you.
See a Permit Pack Built in 25 Minutes
Watch a 5 kW roof go from satellite import to AHJ-ready PDF and DWG on a live demo call. Bring your toughest jurisdiction.
Book a Free Demo20 minutes · Bring a real project · No credit card
What Is in a Solar Permit Pack
Every Authority Having Jurisdiction wants a slightly different bundle, but the spine of a permit pack is consistent across the United States, Australia, the EU, and most of South Asia. If your software cannot produce these seven artifacts, you are going to spend hours in CAD every job.
- Site plan. A scaled overhead drawing of the property with the array footprint, setbacks from ridges and edges, location of the main service panel, point of utility connection, and access pathways. Most AHJs want 1:200 or 1:100 scale.
- Electrical layout. Module locations on the roof or ground, string assignments, MLPE positions if used, conduit runs, and combiner or string inverter locations.
- Single line diagram (SLD). The schematic that walks from PV array through DC disconnect, inverter, AC disconnect, production meter, and main service panel. This is the most-scrutinized sheet.
- Equipment datasheets. Module, inverter, optimizer, and racking cut sheets, usually appended as PDF pages.
- Labels and placards. The warning labels and placard schedule, including the rapid shutdown label.
- Structural attestation. A roof attachment schedule and, in many jurisdictions, a stamped letter from a licensed structural engineer, the kind of structural and civil engineering work Heaven Designs handles for stamped submittals.
- AHJ-specific extras. Some cities want a placard schedule, others want a fire access diagram, others want a battery storage addendum.
How SurgePV Generates Permit-Ready Drawings
SurgePV was built to replace the old four-tool stack of Aurora plus HelioScope plus PVsyst plus a proposal builder. The permit-pack output is one of the places that consolidation pays off, because every sheet in the pack pulls from the same underlying project model.
Site plan and layout. Start with AI 3D roof modeling that pulls high-resolution satellite imagery and builds the roof geometry in under 30 seconds. Setbacks, obstructions, and keepout zones import automatically. The layout sheet is a direct render of the model with dimensions and labels added.
Auto-SLD. When you finalize the electrical design, SurgePV generates the single line diagram with the correct conductor sizes, OCPD ratings, and code labels based on the project jurisdiction. NEC 2023 is the default for US projects. The diagram includes rapid shutdown labels, DC and AC disconnect callouts, and the PV system warning placard.
Shade and yield evidence. Some AHJs and most lenders ask for the production model behind the proposal. SurgePV runs 8,760-hour shade analysis on every project, so the production estimate in the permit pack is the same number on the proposal and the bankable yield report.
CAD export. When your CAD operator needs to add a custom title block or a city-specific cover sheet, DXF/DWG export preserves layers, line weights, and block structure. The DWG opens cleanly in AutoCAD 2018 and later, BricsCAD, and DraftSight.
Proposal in the same file. The same project drives the branded solar proposal and the permit pack, so the homeowner sees the same kWh number that the AHJ approves, a workflow our solar proposal software comparison covers in more depth.
This is what solar design software for installers looks like when it is built for the job rather than retrofitted from a yield simulator.
Solar Permit Design Software vs Outsourcing the Permit Pack
The honest answer is that both have a place. Here is the framing I give installers when they ask.
Design in-house with SurgePV when:
- You ship more than 1 residential job per week per designer.
- You work the same handful of AHJs and benefit from preset templates.
- You want to control turnaround and not wait on a vendor queue.
- Your team is comfortable picking conductor sizes and reading NEC tables.
Outsource the permit pack when:
- You hit a surge in volume and your in-house team is at capacity.
- You move into a new jurisdiction and have not built AHJ presets yet.
- The project is a complex commercial or utility-scale system that needs detailed structural stamps and PE seals.
- You are early in your business and one or two designers cannot justify a $1,899 annual seat.
For overflow, hybrid permit packs, and stamped commercial drawings, Heaven Designs (heavendesigns.in) is the sister brand we point installers to. They use SurgePV under the hood, so the deliverable lands in the same file format your in-house team already understands.
Pair either approach with QuickEstimate for the upstream takeoff and feasibility step before the permit pack starts.
SurgePV vs Aurora vs Solo: Permit Pack Capabilities
| Capability | SurgePV | Aurora | Solo |
|---|---|---|---|
| Auto-SLD | Yes, with code labels | Add-on, limited labels | Yes, US only |
| NEC 2017 / 2020 / 2023 labels | All three, switchable | NEC 2020 default | NEC 2020 only |
| AutoCAD DXF and DWG export | Yes, layer-preserving | PDF only on standard tier | PDF only |
| AHJ preset library | 400+ presets, growing | Limited | None |
| IEC, AS-NZS, IS code sets | Yes | No | No |
| 8,760-hour shading included | Every project | Higher tier | Add-on |
| Branded proposal in same file | Yes | Separate tool | Limited |
| Starting seat price (annual) | $1,899 | $2,400+ | $1,800 |
The biggest gap is the CAD export. If your CAD operator cannot drop the SLD into AutoCAD, every revision means a redraw. SurgePV writes clean DWG by default, a gap our Aurora Solar alternative comparison also flags. If you want to dig into SurgePV pricing and what each tier includes, the per-seat math gets very compelling at the 3-user and 5-user team plans.
Flat Per-Seat Pricing, No Project Caps
$1,899 for an individual seat, $1,299 per seat on a 5-user team. Every plan includes unlimited 8,760-hour shading, Clara AI, and AutoCAD export.
Compare PlansAnnual billing · Cancel anytime · Includes Clara AI
Best Practices for Permit-Ready Drawings
- Build AHJ presets the first time you work each jurisdiction. Store the title block, label set, sheet order, and any specific notes. Reuse on every subsequent job in that city.
- Pick the NEC code year up front. Switching from NEC 2020 to NEC 2023 mid-design forces a relabel on every disconnect.
- Confirm the utility interconnection rules before you set the inverter size. Some utilities cap export at 80 percent of nameplate. Encoding that in the project header avoids a redesign after the pack ships.
- Use the auto-SLD as a starting point, not a rubber stamp. Review conductor sizing, OCPD ratings, and grounding for every project. The software is right 95 percent of the time. The 5 percent matters.
- Export to PDF for the AHJ and DWG for the file. Submit PDF, archive DWG. When the AHJ comes back with corrections, you edit the source.
- Match the proposal kWh to the permit pack kWh. Lenders, AHJs, and customers each see one of these. If the numbers diverge, somebody asks why.
Common Mistakes in Permit Design
- Hand-drawing the SLD in Visio or PowerPoint. Every revision is a manual redraw, and label compliance is a coin flip.
- Using last year’s NEC label set. AHJs reject packs that reference NEC 2017 in a NEC 2023 jurisdiction.
- Sizing conductors from memory. Ambient temperature, conduit fill, and continuous current factors stack quickly. Let the software do the math.
- Skipping the rapid shutdown label. This is the single most common rejection reason in US residential permits.
- Outsourcing every pack without tracking the math. If you are at 60 jobs a year, you are spending $15,000 to $25,000 a year on permit drawings. One SurgePV seat covers that and gives you a yield report and a proposal builder.
Who Should Choose Each
Solo installers and 2-person shops doing under 50 jobs per year. Get an individual SurgePV seat at $1,899 per year. Design in-house. Outsource only the complex commercial jobs to Heaven Designs when they come up.
5 to 15 person residential installers doing 100 to 400 jobs per year. Buy the 3-user or 5-user team plan and run permit design in-house. The per-seat price drops to $1,299 and you get consistent output across the team, a workflow covered further in our residential solar design software guide.
Contact Qbits with the exact model, site inputs and documents relevant to the request. Confirm the responsible party, deliverable, fees and response time after submission.
Shops with spiky volume. Run a hybrid. SurgePV handles steady-state. When volume doubles for a quarter, outsource the overflow rather than hiring a fourth designer you will not need in six months.
Stop Outsourcing Routine Permit Packs
The math flips at 12 jobs a year. See the auto-SLD, AHJ preset library, and CAD export on a live call with your real project.
Book a Free DemoFrequently Asked Questions
What is solar permit design software?
Does SurgePV produce AHJ-ready permit drawings?
Should I design permit packs in-house or outsource them?
How long does it take to generate a permit pack?
Does SurgePV cover NEC code labels?
What AHJ-specific tweaks does the auto-SLD support?
How does pricing compare to using a permit-pack service?
Can I export the permit pack to AutoCAD?
Nirav Dhanani CEO, Qbits Energy
Co-founder & CEO driving Qbits Energy's product strategy and growth across India.