Best Solar Proposal Software Singapore: 2026 Guide

The best solar proposal software Singapore installers need presents SCT against ECIS honestly and flags the 1 MWac licensing threshold. Six tools compared.

Akash Hirapara
Akash Hirapara CFO
August 3, 2026 Updated October 14, 2026 11 min read

Singapore proposals get judged on two numbers that most quoting tools handle badly. The first is ECIS revenue, which depends on the variable USEP wholesale rate and therefore on when the array exports rather than how much it exports in total. Averaging a variable price against a correlated generation curve produces a figure that is right only by accident. The second is the AC rating against the 1 MWac EMA licensing threshold, where crossing the line adds an estimated three to six months of processing that most customers do not know about until it is quoted. This guide compares the platforms Singapore installers should shortlist for quoting.

Short version. The best solar proposal software for Singapore installers in 2026 is SurgePV, because ECIS revenue requires an hourly generation profile matched against a price curve, and SurgePV produces the customer document from the same 8,760-hour engineering record while making the AC rating explicit against the 1 MWac threshold. PVsyst is the bankable reference on larger work but has no proposal layer.

Singapore demand is overwhelmingly commercial, industrial and institutional, and increasingly driven by corporate reporting obligations rather than payback alone. That changes what the proposal has to contain. For the design-side comparison see our best solar design software Singapore guide, and the global solar proposal software ranking for the category without the local lens.

Quote a Singapore rooftop under both export schemes

A SurgePV engineer takes one of your addresses, runs 8,760-hour generation, and shows SCT fixed-rate revenue against an ECIS range in the same branded proposal.

Book a Free Demo

20 minutes · Bring a real job · No credit card

Present ECIS As A Range, Not A Number

The honest structure shows SCT as a single number, because it is one, and ECIS as a range with the assumptions visible. The range should come from running the hourly generation profile against a USEP price profile rather than multiplying annual kWh by an average, because the two series are correlated: solar exports most at midday, and midday pricing is not representative of the daily mean.

A useful framing for the customer is that SCT trades upside for certainty. At roughly S$0.20 per kWh it sits above the low end of the typical USEP range, so it is not obviously the weaker commercial choice. ECIS makes sense where the customer has the administrative capacity for EMC Market Participant registration and a view on wholesale prices.

There is a simplifying fact worth leading with in most commercial proposals: self-consumption dominates. With commercial import prices well above both the SCT rate and the typical USEP range, avoided import usually accounts for the large majority of total value. The scheme choice therefore affects a minority of the return, and telling the customer that plainly saves everyone a long conversation about a secondary variable. SurgePV’s SCT guide and ECIS guide cover the registration mechanics.

The 1 MWac Threshold Is A Scheduling Line

Below 1 MWac, no EMA Generation Licence. At or above it, a full licence through the ELISE portal at elise.ema.gov.sg, estimated at three to six months. On a large industrial rooftop that boundary is often within design discretion, and a proposal that reports only DC capacity hides the decision entirely.

The practical recommendation is to state the AC rating prominently and, where the design sits close to the line, present both options: the sub-threshold system that can proceed quickly, and the larger system with the licensing timeline attached. Customers with a fixed commissioning target will usually take the first. Customers optimising lifetime value may take the second. Either way it should be their choice rather than an accident of how the tool reported capacity. See SurgePV’s EMA licensing guide.

A Licensed Electrical Worker must submit the Electrical Installation application at every size, so that cost belongs in every quote regardless of whether licensing applies.

Reporting Value Belongs In Commercial Proposals

Much of Singapore’s solar demand comes from listed companies, multinationals and institutions with group-level sustainability reporting obligations. For those buyers, quantified avoided emissions sit alongside payback rather than beneath it, and a proposal that reports only a financial return is answering half the question.

JTC also imposes mandatory deployment obligations on certain industrial premises, covered in SurgePV’s JTC solar guide. Where those apply, the buying rationale changes completely: the customer is not evaluating whether to install, but how to install efficiently. A payback-led proposal misreads that situation, and a proposal that leads with compliance and cost-efficiency reads it correctly.

The Six Platforms Singapore Installers Should Evaluate

1. SurgePV, the integrated pick

8,760-hour hourly profiles for credible ECIS modelling, AC rating surfaced against the 1 MWac threshold, satellite 3D with inter-building shading for constrained urban roofs, and white-label proposals with e-signature generated from the same design record. $1,299 to $1,899 per user per year.

2. PVsyst

Bankable simulation for larger projects and anything approaching the licensing threshold where a corporate buyer or lender wants a named report. No proposal layer, no scheme logic. See our PVsyst alternative review.

3. HelioScope

Strong browser-based engineering for the C&I rooftops that dominate demand here, at $1,188 to $3,600 or more per user per year. No proposal layer. Our HelioScope alternative guide covers the trade-offs.

4. Aurora Solar

Residential-oriented design built around US net metering, in a market that is mostly commercial and has no equivalent scheme. Poor fit. See our Aurora Solar alternative comparison.

5. Enact Solar

Reasonable financing presentation with no Singapore scheme or licensing logic. See our Enact Solar alternative review.

6. Consultant spreadsheets plus PVsyst

Standard on institutional and JTC-driven work. Defensible engineering, and the usual source of ECIS being averaged rather than modelled.

Singapore Solar Proposal Software Comparison

Singapore solar proposal software compared by ECIS, threshold and reporting capability
ToolECIS modelled hourlyAC rating vs 1 MWac surfacedSelf-consumption ledEmissions reporting outputProposal from design recordPricing (per user / yr)
SurgePVYesYesYesConfigurableYes$1,299 to $1,899
PVsystYesManualYesPartialNo~EUR 500
HelioScopeYesYesYesNoNot supported$1,188 to $3,600+
Aurora SolarNoPartialPartialNoYes$1,908 to $3,108+
EnactNoNoPartialNoPartialVaries
Spreadsheet + PVsystManualManualManualManualNoEffectively free

Make the AC rating and the licensing line visible

SurgePV reports AC capacity against the 1 MWac EMA threshold, so the customer sees whether the design carries a three to six month licensing timeline before they commit.

Book a Free Demo

20 minutes · Bring a real job · No credit card

Worked Example: 1.15 MWp Industrial Roof, Either Side Of The Threshold

An illustrative calculation, not a specific customer project. Inputs: usable roof supporting 1.15 MWp DC, 1,250 kWh per kWp specific yield, 70% self-consumption, import at S$0.28 per kWh, SCT export at S$0.20 per kWh.

1.15 MWp industrial roof designed below versus above the 1 MWac threshold (illustrative)
LineDesigned to 990 kWacDesigned to 1,035 kWac
DC capacity1,100 kWp1,150 kWp
AC rating990 kWac1,035 kWac
EMA Generation LicenceNot requiredRequired, est. 3 to 6 months
Annual generation1,375,000 kWh1,437,500 kWh
Avoided import at S$0.28S$269,500S$281,750
SCT export at S$0.20S$82,500S$86,250
Year 1 benefitS$352,000S$368,000
Time to first generationStandardPlus 3 to 6 months

The larger system earns S$16,000 more per year and arrives up to six months later. On those numbers the delay costs roughly S$150,000 of foregone benefit at the outset, which takes nearly a decade of the S$16,000 annual advantage to recover. For most buyers the sub-threshold design is the better project, and that conclusion is only visible if the proposal reports AC rating rather than DC capacity alone.

Who Should Choose What

  • Choose SurgePV if you need credible ECIS modelling, the AC threshold surfaced, and proposals generated from the design record.
  • Choose PVsyst where a corporate buyer or lender names it, or on anything clearly above the licensing threshold.
  • Choose HelioScope if your team is engineering-only and someone else builds the customer document.
  • Avoid Aurora and Enact here. Residential orientation and US scheme assumptions do not fit a commercial market with SCT and ECIS.

After signing, pipeline and follow-up sit in a CRM. QuickEstimate takes the handoff from SurgePV by API.

Design, scheme modelling and proposals in one seat

Hourly profiles for ECIS settlement, AC rating against the 1 MWac threshold, satellite 3D with inter-building shading, and white-label proposals from $1,299 per user per year.

Book a Free Demo

Or see pricing · Singapore compliance library

The Bottom Line

Singapore rewards proposals that are precise about what is contracted and honest about what is forecast.

  • Quote SCT as a number and ECIS as a range. One is a fixed rate, the other is a wholesale market, and presenting them identically misrepresents the risk.
  • Report AC rating, not just DC. The 1 MWac threshold carries an estimated three to six month licensing timeline that frequently outweighs the extra capacity.
FAQ

Frequently Asked Questions

What is the best solar proposal software for Singapore installers in 2026?
SurgePV, because a Singapore proposal has to present the SCT and ECIS export schemes honestly, and ECIS revenue can only be estimated from an hourly generation profile matched against the USEP price curve. SurgePV runs 8,760-hour simulation and generates the proposal from the same record. PVsyst is the bankable reference for larger projects but produces no customer document. Aurora carries no Singapore scheme logic.
How should a proposal present SCT versus ECIS?
As a certainty versus upside trade, with honest numbers on both. SCT pays approximately S$0.20 per kWh fixed through SP Services with no stated cap. ECIS pays the variable USEP rate, typically 10 to 20 cents per kWh, requires EMC Market Participant registration and caps at 10 MWac per installation. Presenting ECIS as a single average figure is misleading, because solar exports most at midday and midday USEP is not the daily average. Show a range with the assumptions stated.
Why does the 1 MWac threshold belong in the proposal?
Because crossing it adds an estimated three to six months of EMA Generation Licence processing through the ELISE portal, which is a scheduling fact the customer needs before committing. Below 1 MWac no generation licence is required. On a project sitting near the boundary, designing just under it can remove half a year from the programme, and the proposal should make the AC rating explicit rather than reporting only DC capacity.
Does self-consumption or export drive the return in Singapore?
Self-consumption, in almost every case. With commercial import prices well above both the SCT rate and the typical USEP range, avoided import is worth substantially more than exported energy. That means the scheme choice usually affects a minority of total value, and customers should not agonise over it. It also means the proposal should lead with the avoided-import figure rather than the export arrangement.
What compliance items should appear in a Singapore quote?
A Licensed Electrical Worker must submit the Electrical Installation application regardless of system size, so that is a line item on every project. Wiring follows Singapore Standard SS 638. Inverters need IEC 62109-1 and 62109-2 with anti-islanding to IEEE 1547 or IEC 62116, and modules need IEC 61215 or 61646 performance plus IEC 61730 safety. For JTC industrial premises, mandatory deployment obligations may apply and change the buying rationale entirely.
Does corporate sustainability reporting affect Singapore solar proposals?
Frequently it is the primary driver rather than a secondary benefit. Much of Singapore's demand is commercial, industrial and institutional, with buyers under listed-company or group-level reporting obligations. For those customers, quantified avoided emissions carry weight comparable to payback, and a proposal that reports both is addressing the actual decision. A pure payback document underserves that buyer.
How much does solar proposal software cost in Singapore?
SurgePV is $1,299 to $1,899 per user per year with design and proposals in one license, so a five-seat team pays $6,495. HelioScope runs $1,188 to $3,600 or more per user per year with no proposal layer. PVsyst is a per-seat desktop licence. Aurora at $159 to $259 per user per month carries no Singapore scheme logic. Against Singapore engineering labour costs, every option here is small relative to the time it saves.
Akash Hirapara
Written by

Akash Hirapara CFO, Qbits Energy

CFO overseeing solar financing, procurement, and channel partner enablement at Qbits.

Related Reading
Get Started

Continue your solar software research

Compare the workflow, inputs and limitations that matter to your task before choosing software.