Singapore solar has a decision most markets do not: which export scheme the customer sits under. SCT pays a fixed rate near S$0.20 per kWh and settles simply through SP Services. ECIS pays the variable USEP wholesale rate, typically 10 to 20 cents per kWh, requires EMC Market Participant registration, and caps at 10 MWac per installation. One is predictable, the other is exposed to wholesale price movement and can only be estimated properly with an hourly generation profile matched against a price curve. Add a 1 MWac licensing threshold that adds three to six months of EMA processing, and Singapore rewards design software that can model the specific commercial arrangement rather than a generic export assumption.
Short version. The best solar design software for Singapore installers in 2026 is SurgePV, because the SCT versus ECIS choice materially changes the financial model and ECIS revenue can only be estimated from an hourly profile matched to a price curve. SurgePV runs 8,760-hour simulation with a tropical thermal model and produces the proposal from the same record. PVsyst remains the bankable reference for large C&I. Aurora carries no Singapore scheme logic.
Singapore is a small market by installed capacity and an unusually sophisticated one by buyer type. Most demand is commercial, industrial, or institutional, frequently driven by corporate sustainability reporting rather than payback alone. For the broader category comparison see our solar design software buyer’s guide and the best solar design software ranking.
Model a Singapore rooftop under both export schemes
A SurgePV engineer takes one of your addresses, runs 8,760-hour generation, and shows the revenue under SCT fixed rate against ECIS variable settlement in the same proposal.
Book a Free Demo20 minutes · Bring a real project · No credit card
SCT Versus ECIS, And Why It Is A Modelling Question
| Scheme | Rate | Registration | Cap |
|---|---|---|---|
| SCT | Approximately S$0.20 per kWh, fixed | SP Services direct | None stated |
| ECIS | USEP variable, typically 10 to 20 cents per kWh | EMC Market Participant | 10 MWac per installation |
SCT is the simpler product and the honest default for customers who want certainty. At roughly S$0.20 per kWh it also sits above the low end of the USEP range, so it is not obviously the worse commercial choice. ECIS makes sense where the customer has the appetite and the administrative capacity for Market Participant registration and believes wholesale prices will favour them.
The design consequence is that ECIS customers need hourly modelling and SCT customers do not. A tool that only produces annual totals can serve an SCT customer adequately and cannot serve an ECIS customer at all. SurgePV’s SCT guide and ECIS guide cover the registration mechanics for each.
Licensing, Standards And The Roof Constraint
The 1 MWac threshold. Below it, no EMA Generation Licence. At or above it, a full licence through the ELISE portal at elise.ema.gov.sg, estimated at three to six months. On a project sitting near the boundary that timeline is a genuine reason to design just below it, and the design tool should make the AC rating visible rather than burying it. See SurgePV’s EMA licensing guide.
Licensed Electrical Worker. Required to submit the Electrical Installation application on every system regardless of size.
Standards. SS 638 governs wiring. Inverters need IEC 62109-1 and 62109-2 plus anti-islanding to IEEE 1547 or IEC 62116. Modules need IEC 61215 or 61646 for performance and IEC 61730 for safety.
Roof scarcity. This is the practical constraint that shapes Singapore design work. Usable rooftop is limited, frequently shaded by adjacent towers, and often already carrying plant. Inter-building shading from high-rise neighbours is a first-order effect rather than an edge case, which raises the value of accurate 3D site modelling and module-level shading well above what it would be in a market with open roof. Our solar shading analysis software guide covers why module-level hourly resolution matters, and 3D solar design software covers the site modelling side.
JTC also imposes mandatory deployment obligations on certain industrial premises, covered in SurgePV’s JTC solar guide, which creates a class of project driven by requirement rather than return.
The Six Platforms Singapore Installers Should Evaluate
1. SurgePV, the all-in-one pick
8,760-hour module-level simulation with a tropical thermal model, which is what ECIS modelling requires, AI 3D roof modeling from satellite for the inter-building shading that dominates Singapore rooftops, bankable P50, P75, P90, and white-label proposals with e-signature. $1,299 to $1,899 per user per year.
2. PVsyst
The bankable reference for larger Singapore C&I projects and anything approaching the licensing threshold where a lender or corporate buyer requires a named report. Windows desktop, no proposal layer, no scheme logic. See our PVsyst alternative review.
3. HelioScope
Credible browser-based engineering simulation, well suited to the C&I rooftops that make up most Singapore demand. No proposal layer, no scheme modelling. $1,188 to $3,600 or more per user per year. Our HelioScope alternative guide covers the trade-offs.
4. Aurora Solar
Deep residential design built for US net metering, a structure with no Singapore equivalent, and residential is a small share of this market anyway. Poor fit. See our Aurora Solar alternative comparison.
5. PVcase
Relevant only for the rare Singapore ground-mount or floating project. Narrow scope. See our PVcase alternative comparison.
6. Consultant spreadsheets plus PVsyst
Common on institutional and JTC-driven projects. Produces defensible engineering and the usual source of ECIS revenue being averaged rather than modelled.
Singapore Solar Design Software Comparison
| Tool | Hourly profile for ECIS | Inter-building shading accuracy | AC rating visible against 1 MWac | Tropical thermal model | Proposals included | Pricing (per user / yr) |
|---|---|---|---|---|---|---|
| SurgePV | Yes | Module-level, 8,760-hour | Yes | Yes | Yes | $1,299 to $1,899 |
| PVsyst | Yes | Yes | Manual | Yes | No | ~EUR 500 |
| HelioScope | Yes | Yes | Yes | Yes | Not supported | $1,188 to $3,600+ |
| Aurora Solar | Upper tier | Residential-oriented | Partial | Basic | Sales Mode extra | $1,908 to $3,108+ |
| PVcase | Yes | Terrain-oriented | Yes | Yes | No | Enterprise quote |
| Spreadsheet + PVsyst | Manual | Via PVsyst | Manual | Via PVsyst | No | Effectively free |
Model inter-building shading on a constrained rooftop
SurgePV builds the 3D site model from satellite including neighbouring towers, then runs 8,760-hour module-level shading so the yield figure survives a dense urban context.
Book a Free Demo20 minutes · Bring a real project · No credit card
Worked Example: 800 kWp Industrial Rooftop, SCT Versus ECIS
An illustrative calculation, not a specific customer project. Inputs: 800 kWp DC, 720 kWac, 1,250 kWh per kWp specific yield, 1,000,000 kWh generation, 70% self-consumed, 300,000 kWh exported, import at S$0.28 per kWh.
| Line | Under SCT | Under ECIS |
|---|---|---|
| Self-consumed | 700,000 kWh | 700,000 kWh |
| Avoided import at S$0.28 | S$196,000 | S$196,000 |
| Exported | 300,000 kWh | 300,000 kWh |
| Export rate | S$0.20 fixed | USEP variable, modelled hourly |
| Export revenue | S$60,000 | S$45,000 to S$60,000 |
| Year 1 total | S$256,000 | S$241,000 to S$256,000 |
| AC rating vs 1 MWac threshold | 720 kWac, no licence | 720 kWac, no licence |
Two things stand out. First, self-consumption dominates in both cases, so the scheme choice affects a minority of the revenue and the customer should not agonise over it. Second, the ECIS range is genuinely a range, and a proposal presenting a single ECIS figure is presenting a point estimate from a distribution. The honest presentation shows the range and the assumptions behind it. Note also the 720 kWac rating sits comfortably below the licensing threshold, which is worth stating explicitly because it removes three to six months from the programme.
Who Should Choose What
- Choose SurgePV if you need hourly modelling for ECIS, accurate inter-building shading, and proposals from one license.
- Choose PVsyst where a corporate buyer or lender names it, or on anything crossing the licensing threshold.
- Choose HelioScope if your team is engineering-only and someone else builds the customer document.
- Choose PVcase only for the rare ground-mount or floating project.
- Avoid Aurora here. Residential-oriented, US scheme logic, and residential is a small share of this market.
Design, scheme modelling and proposals in one seat
SS 638 aware design, 8,760-hour hourly profiles for ECIS settlement, satellite 3D with inter-building shading, and white-label proposals from $1,299 per user per year.
Book a Free DemoThe Bottom Line
Singapore is a commercial market with scarce roof and a genuine choice of export scheme. Both facts push toward tools that model hours rather than years.
- Establish SCT or ECIS before modelling. A fixed S$0.20 and a variable USEP curve are different financial products and need different treatment.
- Watch the AC rating against 1 MWac. Crossing it adds an estimated three to six months of EMA licensing, which is often worth designing around.
Frequently Asked Questions
What is the best solar design software for Singapore installers in 2026?
What is the difference between SCT and ECIS?
When does a Singapore solar system need an EMA generation licence?
Who has to submit the electrical installation application?
Does the ECIS variable rate change how systems should be designed?
Why does roof area matter so much in Singapore?
How much does solar design software cost for a Singapore team?
Keyur Rakholiya CTO, Qbits Energy
Listed by Qbits as its CTO. Current role, technical responsibilities and credentials require confirmation by the company owner.