The most expensive line in a Philippine solar proposal is usually the export assumption, and most software gets it wrong by default. Net metering under ERC Resolution No. 09, Series of 2013 credits exported energy at the blended generation rate, which for a Meralco customer runs roughly PHP 5 to 6 per kWh. Imported energy costs the full retail tariff, including transmission, distribution, system loss and universal charges. Any tool that nets the two at the same rate, which is the default behaviour in most US and European platforms, overstates the return on every system that exports. This guide compares the platforms Philippine installers should shortlist for quoting.

Short version. The best solar proposal software for Philippine installers in 2026 is SurgePV, because it lets you price export at the blended generation rate rather than retail, models year-end credit forfeiture, and generates the customer document from the same 8,760-hour engineering record. OpenSolar is the practical choice for small residential on entry cost. PVsyst remains the bankable reference for large commercial.

Philippine electricity is among the most expensive in Southeast Asia, which makes the underlying case for solar strong. It also means the buyer is often comparing several quotes and is sensitive to numbers that do not hold up. For the design-side comparison see our best solar design software Philippines guide, and the global solar proposal software ranking for the category without the local lens.

Quote a Philippine job at the real export rate

A SurgePV engineer takes one of your addresses, prices export at the blended generation rate, models the load profile hour by hour, and produces the branded proposal in 20 minutes.

Book a Free Demo

20 minutes · Bring a real job · No credit card

What A Philippine Proposal Has To Get Right

Export priced at the BGC. This is the single setting that decides whether the proposal is accurate. The blended generation rate covers generation charges only. Everything else on the bill is still payable on imported energy. SurgePV’s ERC net metering guide covers the methodology.

The right capacity assumption. With the non-residential cap now at 1 MW rather than 100 kW, C&I projects that previously needed splitting can be quoted whole. Software still enforcing the old ceiling will misprice them.

Realistic approval timelines. 10 working days for the DU decision on a complete application, 3 working days for the LGU permit and CFEI after inspection. Those are mandated and worth quoting precisely, because they are faster than most customers expect. SurgePV’s DOE 10-day mandate guide covers the process.

The CoC and who signs it. A licensed RME or PEE signs the Certificate of Compliance, covered in SurgePV’s Certificate of Compliance guide.

Why Load Profile Beats System Size In This Market

The commercial implication favours a specific customer type. A factory, a mall, a cold store, or an office running its heaviest load during daylight hours consumes most of what it generates, and every one of those kWh avoids the full retail tariff. A warehouse with low daytime demand exports the majority of its output at half the value. Two identical arrays, materially different returns.

That makes the load profile the first question in a Philippine sales conversation rather than the roof area. It also means the proposal should demonstrate the match rather than assert it, which requires hourly modelling. Our PV yield simulation software guide covers the methodology, and solar plus storage design software covers the storage case, which lands earlier here than in retail-netting markets because grid reliability is itself a selling point.

The Six Platforms Philippine Installers Should Evaluate

1. SurgePV, the integrated pick

Configurable export credit so BGC can be applied properly, 8,760-hour module-level simulation with a tropical thermal model, battery dispatch, and white-label proposals with e-signature generated from the same project record. $1,299 to $1,899 per user per year.

2. OpenSolar

Free at entry and widely used by smaller Philippine residential installers. Financial defaults assume retail netting and need manual correction, and shading is simplified. Our OpenSolar alternative breakdown covers the limits.

3. PVsyst

The bankable reference for large C&I and utility projects where a lender or offtaker requires it. No proposal layer, no local tariff logic. See our PVsyst alternative review.

4. Aurora Solar

Strong residential design built for US utility structures, with no BGC logic and pricing above what Philippine residential supports. See our Aurora Solar alternative comparison.

5. HelioScope

Credible browser-based engineering simulation for C&I rooftops, with no proposal layer and no incentive modelling. Our HelioScope alternative guide covers the trade-offs.

6. Excel plus a design tool

Still the most common setup, and the usual reason retail-rate export assumptions survive into customer-facing documents.

Philippines Solar Proposal Software Comparison

Philippines solar proposal software compared on BGC export, forfeiture, 1 MW cap and price
ToolExport configurable to BGCYear-end forfeiture modelledHourly self-consumption1 MW C&I cap supportedProposal from design recordPricing (per user / yr)
SurgePVYesYesYesYesYes$1,299 to $1,899
OpenSolarManualNoSimplifiedManualYesFree + add-ons
PVsystManualNoYesYesNo~EUR 500
Aurora SolarNoNoUpper tierNoYes$1,908 to $3,108+
HelioScopeNoNoYesYesNot supported$1,188 to $3,600+
Excel + design toolManualManualNoManualNoEffectively free

See the same array quoted for a factory and a warehouse

SurgePV runs the load profile hour by hour, so the proposal shows why a daytime-heavy operation returns far more from identical hardware.

Book a Free Demo

20 minutes · Bring a real job · No credit card

Worked Example: 50 kW Commercial Rooftop In Metro Manila

An illustrative calculation, not a specific customer project. Inputs: 50 kW DC, 1,400 kWh per kW specific yield, 70,000 kWh generation, retail import at PHP 12 per kWh, export at PHP 5.50 per kWh, 70% self-consumption.

50 kW commercial rooftop in Metro Manila priced at retail versus BGC (illustrative)
LinePriced at retail (wrong)Priced at BGC (correct)
Self-consumed49,000 kWh49,000 kWh
Exported21,000 kWh21,000 kWh
Value of self-consumption at PHP 12PHP 588,000PHP 588,000
Value of exportPHP 252,000 at PHP 12PHP 115,500 at PHP 5.50
Year 1 benefit presentedPHP 840,000PHP 703,500

The retail-priced version overstates year one benefit by PHP 136,500, roughly 19%, on a system with fairly high self-consumption. On a warehouse exporting 65% of output the same error would be several times larger. The customer does not discover it at signing. They discover it on the bills, and the gap compounds every year of the asset’s life.

Who Should Choose What

  • Choose SurgePV if you want BGC-correct export pricing, hourly self-consumption and proposals in one license, or you quote C&I under the new 1 MW cap.
  • Choose PVsyst where a lender or offtaker names it on a large project.
  • Choose OpenSolar for small residential where entry cost decides, accepting manual tariff correction on every quote.
  • Choose HelioScope if your team is engineering-only and someone else builds the document.
  • Avoid Aurora here. Wrong tariff model, wrong price point.

After signing, pipeline and follow-up sit in a CRM. QuickEstimate takes the handoff from SurgePV by API.

Design and BGC-correct quoting in one seat

Export priced at the blended generation rate, 8,760-hour tropical yield modelling, battery dispatch, and white-label proposals from $1,299 per user per year.

Book a Free Demo

Or see pricing · Philippines compliance library

A proposal tool only earns its place inside a working stack. The wider solar software picture in the Philippines covers what sits either side of it.

The Bottom Line

Philippine proposals are decided by one number that most software fills in wrongly by default, and by one question most quotes never ask.

  • Set export to the BGC on every model. Roughly PHP 5 to 6 against a PHP 12 import price is the actual spread.
  • Ask about the load profile before the roof. Daytime-heavy operations are where Philippine solar pays, and the proposal should prove the match rather than assume it.
FAQ

Frequently Asked Questions

What is the best solar proposal software for Philippine installers in 2026?
SurgePV, because Philippine net metering credits the blended generation rate rather than the retail tariff, and a proposal that does not price export correctly overstates the return on every export-heavy system. SurgePV lets you set the export credit to the BGC, runs 8,760-hour simulation against the load profile, and generates the proposal from the same record. OpenSolar suits small residential on cost. PVsyst remains the reference for large C&I bankable yield.
Why does the blended generation rate matter so much in a proposal?
Because it is roughly half the retail price. Under ERC Resolution No. 09, Series of 2013, exported energy is credited at the generation charge only, running about PHP 5 to 6 per kWh for Meralco customers, which is around 50 to 60 percent of the full retail tariff. Imported energy costs the full tariff including transmission, distribution, system loss and universal charges. A proposal that nets export against import at the same rate overstates the benefit substantially.
Do net metering credits expire in the Philippines?
Monthly credits roll over, but they may be forfeited at year-end settlement. That is a real constraint on sizing, because a system built well above annual consumption accumulates credits the customer may never realise. It argues directly against the oversizing habit imported from retail-netting markets, and it belongs in the proposal as a stated assumption rather than being quietly ignored.
What changed with the capacity cap in 2026?
A DOE circular in April 2026 raised the non-residential net metering capacity cap from 100 kW to 1 MW. That is a significant expansion for commercial and industrial rooftop work, opening a project class that previously had to be split or restructured to stay under the old ceiling. Proposal software still enforcing a 100 kW assumption in its net metering logic will misprice these projects.
What approval timelines should a Philippine proposal promise?
The distribution utility must approve or reject a complete net metering application within 10 working days under the DOE mandate. The LGU electrical permit and Certificate of Final Electrical Inspection follow within 3 working days after inspection. Republic Act 9513 of 2008 makes net metering a statutory right for on-grid renewable energy end-users, so a compliant application cannot simply be declined. Quote those timelines rather than a vague estimate.
Who signs off a Philippine solar installation?
A Certificate of Compliance signed by a licensed Registered Master Electrician or Professional Electrical Engineer is required. The installation must meet the Philippine Electrical Code, which is based on NEC 2008, including anti-islanding that disconnects within 2 seconds of a grid outage, earthing of array frames and enclosures, DC arc fault protection on longer runs, and accommodation for bidirectional metering.
How much does solar proposal software cost in the Philippines?
SurgePV is $1,299 to $1,899 per user per year with design and proposals in one license, so a five-seat team pays $6,495. OpenSolar is free at entry with per-feature add-ons, which suits smaller residential installers. Aurora at $159 to $259 per user per month is hard to justify against Philippine residential ticket sizes. For a C&I-focused firm the licence cost is trivial next to one mispriced 500 kW rooftop.
Akash Hirapara
Written by

Akash Hirapara CFO, Qbits Energy

CFO overseeing solar financing, procurement, and channel partner enablement at Qbits.

Related Reading
Get Started

Continue your solar software research

Compare the workflow, inputs and limitations that matter to your task before choosing software.