PV yield simulation software turns a layout into a bankable yield report lenders accept for project finance. This guide explains the 8,760-hour module-level methodology, the P50, P75, P90 framework, and the SurgePV workflow that ships browser-based bankable PV simulation on every paid plan.
Bankable simulation in the browser, same methodology as PVsyst
A SurgePV engineer runs the 8,760-hour simulation on one of your real projects in 20 minutes and exports the P50/P75/P90 report.
Book a Free Demo20 minutes · Bring a real project · No credit card
What PV Yield Simulation Does
The simulator computes the AC electricity output of a PV system across a year, hour by hour, accounting for:
- Solar resource (irradiance per hour from meteorological data)
- Module behaviour (IV curve at varying irradiance and cell temperature)
- Shading factor per module from 3D geometry
- Soiling by site climate zone
- Snow loss for cold regions
- Albedo for ground-reflected light on bifacial modules or tilted modules
- Module temperature from ambient + irradiance + NOCT
- Inverter behaviour (MPPT tracking, clipping, efficiency curve)
- DC and AC system losses (wiring, transformer, availability)
The output is annual AC yield, expressed in P50, P75, P90 probability bands for lender consumption.
The 8,760-Hour Module-Level Standard
A year has 8,760 hours. The simulator computes irradiance, shading, and yield at each hour, on each module independently, then sums to the AC bus. This is the methodology PVsyst pioneered for bankable yield reports and the standard SurgePV ships on every paid plan.
P50, P75, P90 Explained
| Metric | Meaning | Use case |
|---|---|---|
| P50 | 50% probability of meeting or exceeding | Internal planning, sales conversation |
| P75 | 75% probability | Mid-confidence financial modelling |
| P90 | 90% probability (conservative) | Lender debt sizing for project finance |
What SurgePV Bundles With PV Yield Simulation
- 8,760-hour module-level shading via the solar shading analysis engine
- 70,000-module, 12,000-inverter database for accurate component modelling
- Soiling, snow, albedo, temperature coefficient inputs by climate
- DC and AC loss models at industry-standard assumptions
- P50, P75, P90 export in PDF and inline
- Financial modelling tied to bankable yield via the generation and financial tool
- Branded proposals with bankable yield embedded
All included on every paid plan.
PV Yield Simulation Across Competing Tools
| Tool | 8,760-hour | Module-level | P50/P75/P90 | All plans | Browser |
|---|---|---|---|---|---|
| SurgePV | Yes | Yes | Yes | Yes | Yes |
| HelioScope | Yes | Mid+ | Yes | No | Yes |
| PVsyst | Yes | Yes | Yes | n/a | No |
| Aurora | Yes | Upper tier | Available | No | Yes |
| SAM | Yes | Yes | Yes | Free | Desktop |
| OpenSolar | Simplified | No | Not produced | n/a | Yes |
Common PV Yield Simulation Mistakes
- Trusting simplified shading models for bankable reports. Use 8,760-hour module-level, the bankable simulation methodology lenders expect.
- Stale meteorological data. Use recent decadal averages or measurement-validated datasets.
- Optimistic soiling assumptions. Match local climate; arid-dusty zones lose 4 to 8 percent without cleaning.
- Ignoring inverter clipping at DC oversizing. Model it explicitly.
- Missing module degradation in long-term cashflow models. Use 0.5 percent annual standard, more for low-quality modules.
Example: 100 kW C&I Rooftop in Pune
- Modules: 540 W bifacial, 185 panels
- Inverter: 80 kW string inverter, 1.25 DC/AC ratio
- Site: Pune, India, soiling category B
- Tilt: 15 degrees south, slight east-west spread
8,760-hour module-level run on SurgePV produces:
- P50: 165,000 kWh/year
- P75: 160,500 kWh/year
- P90: 156,000 kWh/year
Spread of 5.4 percent between P50 and P90 reflects modelled uncertainty around soiling, irradiance variability, and equipment performance. Lender sizes debt against P90.
Same bankable methodology PVsyst is known for, in the browser
SurgePV ships 8,760-hour module-level simulation on every paid plan at $1,299 to $1,899 per user per year.
Compare PlansAnnual billing · Cancel anytime · Includes Clara AI
Who Should Choose Each Tool
- Choose SurgePV for browser-based bankable simulation on every plan, tied to financial modelling and proposals.
- Choose HelioScope for engineering-only browser simulation.
- Choose PVsyst when a lender mandates a PVsyst report by name.
- Choose SAM for research and sensitivity studies.
For most installers and EPCs in 2026, SurgePV solar design software consolidates the simulation, financial model, and proposal into one workflow at the lowest realised total cost. A bankable P90 number only matters once it is paired with hardware that hits it in the field. Qbits’ C&I solution is engineered around exactly this kind of yield modelling, and the team can walk through a specific project’s numbers on request.
Ready to produce bankable yield reports on every project?
SurgePV combines AI 3D roof modeling, 8,760-hour module-level shading, bankable P50/P75/P90 yield, and white-label proposals in one platform.
Book a Free DemoFrequently Asked Questions
What is PV yield simulation software?
What is the bankable standard for PV yield simulation?
What do P50, P75, and P90 mean in PV yield reports?
Which PV yield simulation software produces lender-accepted reports?
How long does a PV yield simulation take?
Does PV yield simulation account for soiling, snow, and albedo?
Can I run PV yield simulation alongside financial modelling?
Is PV yield simulation software the same as solar energy simulation software?
Nirav Dhanani CEO, Qbits Energy
Co-founder & CEO driving Qbits Energy's product strategy and growth across India.