Solar Inverter Market in India 2026, Industry Report

A source-led guide to India's solar inverter market: segment definitions, PM Surya Ghar and ALMM context, brand landscape, and why public market-share estimates need care.

Nirav Dhanani
Nirav Dhanani CEO
June 5, 2026 Updated October 14, 2026 18 min read

India’s solar inverter market is easy to describe and hard to measure. Every grid-connected system needs an inverter, and capacity additions are well documented. What is not well documented is the market in rupees or in brand shares, where published numbers differ by a factor of two or more. This report keeps to figures that name a source and a date. Where a number cannot be sourced, it says so instead of filling the gap. Data points were checked between 12 and 14 October 2026.

How big is the solar inverter market in India?

Three research firms publish a headline figure, and no two agree. The differences come from scope (solar PV inverters only, or all inverters), base year, currency conversion and how utility-scale central inverters are counted.

Published estimates of the India solar inverter market, 2025 value and forecast, by research firm
Publisher2025 valueForecastGrowth rateNotes
IMARC GroupUSD 386.7 millionUSD 793.5 million by 20348.07% (2026 to 2034)Solar PV inverters; page updated 4 Sep 2026
TechSci ResearchUSD 612 millionAbout USD 1,100 million by 203110.11% (2026 to 2031)Central, string and micro; on-grid and off-grid
Market Research FutureUSD 0.86 billionUSD 3.12 billion by 203513.6% (2026 to 2035)Includes string, central, micro and hybrid or battery-ready
USD million02505007501,000IMARC Group386.7 USD millionTechSci Research612 USD millionMarket Research Future860 USD millionUSD million02505007501,000IMARC Group386.7 USD millionTechSci Research612 USD millionMarket ResearchFuture860 USD million
Published 2025 estimates of India's solar inverter market
ItemValue (USD million)
IMARC Group386.7 USD million
TechSci Research612 USD million
Market Research Future860 USD million
Published 2025 estimates of India's solar inverter marketSource: IMARC Group (page updated 4 Sep 2026), TechSci Research and Market Research Future report pages, read 12 to 14 October 2026Modelled estimates with different scope and base years, not measured sales. The spread is the finding.

The highest 2025 figure is more than twice the lowest. None of the three is a measured sales total. They are modelled estimates behind a paywall, and each firm’s methodology is its own. The practical reading is a range of roughly USD 0.4 to 0.9 billion for 2025, with growth forecasts between about 8% and 14% a year depending on the firm.

A single figure such as “USD 1.4 to 1.6 billion” with 15 to 18% growth is sometimes quoted online. We could not trace it to any of the research firms above or to a trade publication, so this page does not use it.

A better yardstick: capacity added and inverters shipped

Revenue estimates differ, but capacity additions are tracked monthly by MNRE and by analysts such as JMK Research. Inverter demand follows the AC capacity of new plants, so these numbers show how much work the market is actually doing.

India solar capacity added and installed, with source and date for each figure
MeasureFigureSource and date
Installed solar capacity168.04 GW at 31 Aug 2026MNRE, as cited in TechSci’s report page
Solar added in FY2026About 44.6 GW, up 87.2% on FY2025JMK Research, 10 Apr 2026
Of which utility-scaleAbout 34.8 GW, up 106%JMK Research, 10 Apr 2026
Of which rooftopAbout 8.7 GW, up 69%JMK Research, 10 Apr 2026
Solar added Jan to Sep 202635.2 GW (24.4 GW utility, 9.8 GW rooftop)PV Tech, 12 Oct 2026, citing JMK
Cumulative rooftop capacityAbout 33.4 GW at end September 2026PV Tech, citing JMK
Rooftop added in H1 2026About 6.4 GW, up 104% on H1 2025Down To Earth, 15 Jul 2026, citing JMK

Mercom India tracks the inverter side directly. It reported that inverter shipments to solar projects in India increased 40.8% in 2025 compared with 2024, driven by record installations and a strong pipeline for commissioning in the first half of 2026, and that central inverters accounted for 51% of total shipments. Mercom’s 2024 leaderboard coverage put string inverters at 51.3% and central inverters at 48.7%, so the mix swung back towards central units in 2025 as large ground-mount plants came online.

Two cautions apply. First, those are shares of shipments to solar projects, a measure that is weighted towards utility-scale plants where central inverters are common. It is not a residential split. Second, rooftop figures differ by source and cut-off date: MNRE data compiled by Climate Compatible Futures showed 25.7 GW of cumulative rooftop capacity at March 2026, while JMK’s September 2026 figure is 33.4 GW, a different date and a different compilation.

Segment definitions: residential, C&I and utility

The three segments buy different products for different reasons, which is why a single national “market share” is of limited use to a buyer.

Inverter segments, typical product and what drives the purchase
SegmentTypical inverterWhat drives the purchase
Residential rooftopSingle-phase or small three-phase string inverter, or a hybrid inverter where backup is wantedPM Surya Ghar eligibility, installer recommendation, warranty and local service
Commercial and industrial rooftopThree-phase string inverters, often several per siteTariff savings, datasheet specifications, monitoring, references
Utility-scaleCentral inverters and large string invertersTenders, bankability, supplier balance sheet

The two market reports that publish segment shares disagree, which is itself informative. TechSci estimated for 2025 that string inverters held about 43% of the market, on-grid systems about 72%, three-phase models about 67% and utilities about 51%. Market Research Future estimated string inverters at 45.6%, three-phase at 71.8% and utility-scale at 65.4%. Both agree on the direction: three-phase and on-grid products dominate, because utility and commercial plants dominate revenue. Residential is the fastest-growing application in Market Research Future’s forecast, at 16.0% a year from 2026 to 2035.

For a household, the relevant point is that the inverter is usually chosen by the installer. The procurement checks that matter to you are covered in the on-grid inverter and hybrid inverter hubs.

PM Surya Ghar and the residential pipeline

PM Surya Ghar Muft Bijli Yojana is the main driver of residential rooftop demand. Reports in October 2026 describe a scheme with an outlay of INR 750 billion, a target of 10 million households and a 30 GW rooftop target, with the current scheme ending on 31 March 2027 (TaiyangNews, 12 October 2026, citing Mint). The scheme’s own portal is pmsuryaghar.gov.in, and the household subsidy slabs are in our PM Surya Ghar subsidy amount guide.

Progress figures depend on who is counting and when:

PM Surya Ghar and residential rooftop progress figures, with source and date
MeasureFigureSource and date
Residential rooftop installed17,561 MW across 59,47,035 householdsJMK Research monthly update, September 2026
Commissioned under the scheme14.8 GW at 4 Aug 2026TaiyangNews, 12 Oct 2026
Households coveredMore than 2.6 millionJMK Research, 10 Apr 2026
Central financial assistance disbursedNearly INR 14,771 croreJMK Research, 10 Apr 2026

The gap between 17.6 GW and 14.8 GW is a dating and definition difference, not a contradiction. A Business Standard report on 7 October 2026, citing JMK, said the scheme had crossed 17.5 GW while monthly rooftop additions fell for a second month. That matters for planning: the pipeline is large, but it is not accelerating every month.

Within the scheme, state leadership has moved. JMK’s September 2026 update showed Uttar Pradesh adding 234.46 MW of PM Surya Ghar capacity in the month, ahead of Maharashtra (208.04 MW) and Gujarat (165.6 MW). The vendor and eligibility rules sit in our empanelled vendor guide and the complete scheme guide.

Top states by rooftop solar capacity

Rooftop solar is concentrated. MNRE data compiled by Climate Compatible Futures and reported by Down To Earth on 23 June 2026 put national rooftop capacity at 25.7 GW as of March 2026 and showed these states:

Rooftop solar capacity by state, March 2026, for the states named in the source
StateRooftop capacity, March 2026
Gujarat6,882 MW
Maharashtra5,442 MW
Rajasthan2,090 MW
Kerala1,850 MW
Haryana1,188 MW
Uttar Pradesh715 MW
Punjab581 MW
Delhi410 MW
Assam344 MW
Uttarakhand274 MW
MW02,0004,0006,0008,000Gujarat6,882 MWMaharashtra5,442 MWRajasthan2,090 MWKerala1,850 MWHaryana1,188 MWUttar Pradesh715 MWPunjab581 MWDelhi410 MWAssam344 MWUttarakhand274 MWMW02,0004,0006,0008,000Gujarat6,882 MWMaharashtra5,442 MWRajasthan2,090 MWKerala1,850 MWHaryana1,188 MWUttar Pradesh715 MWPunjab581 MWDelhi410 MWAssam344 MWUttarakhand274 MW
Rooftop solar capacity by state, March 2026
ItemValue (MW)
Gujarat6,882 MW
Maharashtra5,442 MW
Rajasthan2,090 MW
Kerala1,850 MW
Haryana1,188 MW
Uttar Pradesh715 MW
Punjab581 MW
Delhi410 MW
Assam344 MW
Uttarakhand274 MW
Rooftop solar capacity by state, March 2026Source: MNRE data compiled by Climate Compatible Futures, reported by Down To Earth, 23 June 2026Only the states named in the source are shown. Tamil Nadu and Karnataka are not given.

The article reports that the top ten states account for close to 86% of the national total. Gujarat and Maharashtra together hold 12,324 MW, about 48% of the 25.7 GW. The table lists the states the article names, and the source does not give Tamil Nadu or Karnataka, so it is not a complete top-ten list.

Stock and growth tell different stories. JMK reported that in FY2026 Maharashtra added the most rooftop capacity at 2,144 MW (25% of additions), followed by Gujarat at 1,777 MW (20%) and Tamil Nadu at 600 MW (7%). In August 2026 Gujarat added 628.7 MW, Uttar Pradesh 489.7 MW and Andhra Pradesh 210.8 MW. Uttar Pradesh, with only 715 MW in March, is the state to watch. For state-level subsidy rules see the Uttar Pradesh solar subsidy guide and the state subsidy overview, and for more dated national statistics see India solar statistics 2026.

Who supplies the inverters: what is public, and what is not

The only public, repeatable supplier ranking we found is Mercom India’s leaderboard of inverter shipments to solar projects. Mercom named the same five suppliers at the top in recent years, with the order changing:

Top inverter suppliers by share of shipments to solar projects in India, Mercom India leaderboard
Supplier2024 share of shipments2025 position
Sungrow29.1%First, nearly one-third
TBEA Energy India21.3%About 18%
Sineng Electric13.3%Second, over 19%
FIMER India12.2%Nearly 7%
Solis (Ginlong)6%Fifth
%0102030Sungrow29.1%TBEA Energy India21.3%Sineng Electric13.3%FIMER India12.2%Solis (Ginlong)6%%0102030Sungrow29.1%TBEA EnergyIndia21.3%Sineng Electric13.3%FIMER India12.2%Solis (Ginlong)6%
2024 share of inverter shipments to solar projects in India, top five suppliers
ItemValue (%)
Sungrow29.1%
TBEA Energy India21.3%
Sineng Electric13.3%
FIMER India12.2%
Solis (Ginlong)6%
2024 share of inverter shipments to solar projects in India, top five suppliersSource: Mercom India, India Solar Market Leaderboard coverage for 2024 (public articles; full data is paywalled)Shares of shipments to solar projects, weighted to utility-scale supply. Not a residential brand ranking.

Source: Mercom India’s India Solar Market Leaderboard coverage for 2024 and 2025, as summarised in its public articles. Full leaderboard data is behind Mercom’s paywall.

Read this table for what it is. Share estimates in blog posts are not a substitute for shipment data.

Two developments are worth knowing. TaiyangNews reported on 12 October 2026 that Waaree’s planned inverter manufacturing capacity is 4.15 GW a year, and that India is considering local-content rules for inverters. The market for Indian-made inverters is therefore a policy question as well as a commercial one. Qbits Energy is one Indian inverter maker among others in this market, with on-grid and hybrid lines. For brand-by-brand comparisons, use our top 10 solar inverter brands in India, the Indian brands guide and the market share explainer.

Five checks that matter for the Indian grid and climate

A brand that does well in Europe or China still has to cope with Indian grid conditions, heat and service distances. These are the checks procurement teams actually use. They are a checklist, not a score.

ALMM and inverter compliance are separate checks

MNRE’s ALMM covers solar modules (List-I) and cells (List-II). MNRE publishes no inverter list. List-II was notified to be effective from 1 June 2026, so a module on List-I must use cells from a List-II manufacturer (Energetica India, 10 December 2024). MNRE has since issued clarifications and exemptions for some project types, so check the current position on MNRE’s site.

For inverter buyers this means two parallel checks: the module and cell requirement against the ALMM lists, and the inverter against its own certificates and the DISCOM’s accepted-make list. A seller who answers an inverter question with an ALMM claim is answering the wrong question. Our ALMM scope guide walks through the difference.

The direction of policy is worth watching. TaiyangNews reported on 12 October 2026 that the Renewable Energy Secretary said proposals for locally made inverters and batteries in the next phase of PM Surya Ghar remain under consideration. Nothing has been notified.

Hybrid inverters, battery storage and remote monitoring all feature in installer conversations, but only some of it can be quantified from public sources.

Hybrid and storage. No public series tracks hybrid inverter shipments in India. The constraint on storage is supply: TaiyangNews, citing Wood Mackenzie, reported domestic battery-cell capacity of about 2 GWh in 2026 against a tender pipeline of roughly 260 GWh. A hybrid inverter without a locally available battery is a partial system, so the battery decision matters as much as the inverter. Our on-grid versus hybrid ROI analysis compares costs under different outage patterns.

Monitoring. Remote monitoring is moving from an extra to an expected feature, because installers servicing many sites cannot visit each one. The useful test is whether the system tells the installer what is wrong, not only that something is.

EV charging. Some commercial and society projects combine rooftop solar with EV charging. We found no sourced India share for this, so we make no estimate. It is a design consideration for inverter sizing and export control.

Challenges that limit growth

Challenges that limit rooftop solar growth, what each means for a project and how to mitigate
ChallengeWhat it means for a projectMitigation
DISCOM approval and net metering delaysSubsidy and savings start later than the installation dateConfirm the DISCOM process and expected timeline before signing; see how to apply for net metering
Concentrated geographyService networks and installer depth are thinner outside the top statesCheck the service partner covers your pincode
Uncertified or poorly documented equipmentSubsidy and warranty disputes laterAsk for the exact model’s certificates in writing
Feeder capacityExport may be limited in some areasA site survey and DISCOM confirmation before design
Policy changeEligibility rules can move, as the local-content proposal showsVerify against MNRE and the portal at the time of purchase

The DISCOM processes remain the hardest constraint to solve at project level, because they depend on grid infrastructure and administration rather than the installer. Where a feeder cannot take exports, a net metering alternative or an export-limited design is a conversation with the DISCOM, not a decision for the inverter vendor.

Where to track these numbers yourself

Market figures go stale within a quarter. If you rely on them for a purchase, a tender or a plan, go to the publishers directly and check the date on each figure before you use it.

Where to track India solar inverter market numbers yourself
QuestionWhere to lookHow often it updatesLimits
How much solar was installed, and how much was rooftop?JMK Research’s monthly renewable sector update and MNRE’s physical progress dataMonthlyJMK and MNRE compile on different cut-off dates, so totals rarely match exactly
How many inverters shipped, and from which suppliers?Mercom India’s annual leaderboard coverage, linked aboveYearlyFull tables are paywalled, and the ranking reflects utility-scale supply
How many homes have joined PM Surya Ghar?pmsuryaghar.gov.in and the JMK monthly updateMonthly to quarterlyThe portal and analysts define “installed” and “commissioned” differently
Is a module or cell on the approved list?MNRE’s ALMM pageRevised oftenLists modules and cells only, never inverters
What is the modelled market size in rupees or dollars?IMARC, TechSci and Market Research Future report pages, linked aboveIrregularPaywalled models with different scope and base years

Three habits make any of these figures safer to use. Write down the publisher and the date next to the number when you copy it. Compare like with like, so a shipment share is never set beside a revenue share. And treat any single market-size figure with no named source, however confident it sounds, as an unverified claim rather than a statistic.

What the data means for buyers and installers

  • Do not anchor on a market-size number. The estimates differ by a factor of more than two, and none is measured sales.
  • Use shipment and capacity data for direction, not for brand choice. Mercom’s ranking is weighted to large plants. A home buyer should compare exact models.
  • Treat rooftop concentration as a service question. If your state is outside the main rooftop states, ask harder questions about local service.
  • Separate the module check from the inverter check. ALMM answers the first. Certificates and DISCOM acceptance answer the second.
  • Expect rules to move. The local-content proposal for inverters is under consideration, not law.

Qbits Energy publishes datasheets for its on-grid and hybrid models on the datasheet page. For warranty and service terms, obtain the current written terms for the exact model and sale, since the public datasheets do not set a universal duration, remedy or service commitment.

Qbits models

Specs below come from each model's datasheet. Confirm the exact model and current written terms with Qbits before you buy.

Browse all on-grid inverters →

FAQ

Frequently Asked Questions

What is the size of the solar inverter market in India?
Published estimates disagree, because firms define the market differently. For 2025, IMARC puts the India solar PV inverter market at USD 386.7 million, TechSci Research at USD 612 million, and Market Research Future at USD 0.86 billion. Forecast growth rates range from about 8% to 13.6% a year. Use one report's figure only with its own definition and year, and treat the spread as the honest range rather than picking the highest number.
How fast is demand for solar inverters growing in India?
Mercom India reported that inverter shipments to Indian solar projects rose 40.8% in 2025 compared with 2024. JMK Research reported that India added about 44.6 GW of solar in FY2026, up 87.2% year on year, and 35.2 GW in January to September 2026. Inverter demand follows these additions, so shipments are tied to project pipelines rather than to a single market-size estimate.
Which states have the most rooftop solar in India?
MNRE data compiled by Climate Compatible Futures and reported by Down To Earth on 23 June 2026 put Gujarat at 6,882 MW and Maharashtra at 5,442 MW of rooftop solar as of March 2026, followed by Rajasthan at 2,090 MW and Kerala at 1,850 MW. National rooftop capacity in that series was 25.7 GW. Uttar Pradesh had 715 MW but was adding capacity quickly, so rankings by additions differ from rankings by stock.
How does ALMM affect solar inverter procurement in India?
ALMM covers solar PV modules (List-I) and cells (List-II), and MNRE publishes no ALMM list for inverters. The module requirement is therefore checked against the ALMM list, while the inverter is checked through its own documents: BIS registration or the applicable self-certification, test certificates for the exact model, the DISCOM's acceptance of the make and model, and any data or monitoring requirements under the scheme. Treat the two as separate checks and ask the seller for both.
What share of the Indian inverter market is string versus central?
Mercom India reported that central inverters were 51% of inverter shipments to Indian solar projects in 2025, so string inverters were about 49%. In 2024 the split was reported as 51.3% string and 48.7% central. This is a share of shipments to solar projects, which is weighted towards utility-scale plants, and is not a residential split. TechSci and Market Research Future each publish their own segment shares, which differ.
Which inverter brands lead the Indian market?
It depends on the segment and on how it is measured. Mercom India's supplier rankings of inverter shipments to Indian solar projects have named Sungrow, Sineng Electric, TBEA Energy India, FIMER India and Solis in the top five in recent years, with the order changing. No public source publishes a comparable residential brand share. Shortlist by exact model, certificates, written warranty terms and service coverage near you rather than by a ranking.
How big is PM Surya Ghar's effect on residential inverter demand?
JMK Research reported 17,561 MW of residential rooftop capacity across 59,47,035 households under PM Surya Ghar as of September 2026. A separate report on 12 October 2026 cited 14.8 GW commissioned as of 4 August 2026. The two figures use different dates and definitions. The scheme's stated targets are 10 million households and 30 GW of rooftop capacity by 31 March 2027, so the pipeline is large, and each system needs an inverter that meets the scheme's compliance checks.
Is India planning to require locally made inverters?
It is under consideration, not decided. On 12 October 2026 TaiyangNews, citing a Mint interview with the Renewable Energy Secretary, reported that India is considering domestic-manufacturing requirements for inverters and batteries in the next phase of PM Surya Ghar, and that the proposals remain under consideration. No inverter ALMM list exists today. Check MNRE's notices before relying on any rumour about eligibility.
What challenges slow down India's solar inverter market growth?
The main drags are DISCOM approval and net metering delays, price pressure that pushes some buyers toward uncertified equipment, uneven after-sales service outside large cities, changing compliance and data requirements, and an uneven geographic spread of rooftop solar. Down To Earth's analysis of MNRE data found the top ten states hold close to 86% of national rooftop capacity. Buyers can reduce risk by choosing models with current certificates, a written warranty and a service partner who covers their pincode.
Is hybrid inverter demand rising in India?
There is no public shipment series for hybrid inverters, so a precise growth rate cannot be sourced. The drivers are visible, though: grid interruptions in some areas, storage that is still scarce domestically (TaiyangNews reported about 2 GWh of battery-cell capacity in 2026 against a pipeline of roughly 260 GWh in tenders, citing Wood Mackenzie), and policy interest in local batteries. For the cost and payback comparison, see our on-grid versus hybrid ROI analysis.
Nirav Dhanani
Written by

Nirav Dhanani CEO, Qbits Energy

Co-founder & CEO driving Qbits Energy's product strategy and growth across India.

Related Reading
Industry 17 min

REI Expo 2026: What Solar Buyers Should Check

REI Expo 2026 runs 22 to 24 October in Greater Noida. A cautious preview of inverter, storage and module topics, with the checks EPC buyers should run on any vendor claim.

Industry 17 min

Solar Service SLA Crisis in India, A Founder's View

India's solar service SLA gap: many warranties state no measurable service time, downtime keeps costing the buyer, and a 5-gate SLA standard is proposed for ticketing, diagnosis, visit, parts and restoration.