Skip to content
Solar Software

Best Solar Proposal Software Australia: 2026 Guide

The best solar proposal software Australia installers need models STC deeming, state feed-in tariffs, and export limits correctly. Seven tools compared.

Akash Hirapara
Akash Hirapara CFO
August 3, 2026 Updated October 14, 2026 12 min read

Australian solar quoting has two variables that no other market shares, and generic proposal software handles neither. The first is STC deeming: the federal rebate is created from system size, the postcode’s solar zone rating, and the years left in a scheme that ends in December 2030, so the same 6.6 kW system is worth less this year than last and different amounts in Cairns and Hobart. The second is export limits: distribution networks increasingly cap or dynamically curtail export, so a proposal built on unconstrained feed-in overstates income on exactly the systems most likely to be constrained. This guide compares the platforms Australian installers should shortlist on those two things first.

Short version. The best solar proposal software for Australian installers in 2026 is SurgePV, because it calculates STC deeming from system size and solar zone, applies AS/NZS 5033 and AS 4777.2 checks at design time, models DNSP export limits, and generates the customer document from the same engineering record. OpenSolar is the default for simple residential on cost. Solargraf suits crews that already own a design tool.

Australia has the highest per-capita rooftop solar penetration in the world, which means the market is mature, competitive, and unusually well-informed. Customers here compare quotes closely and often know their network’s export rules. For the design-side comparison see our solar design software Australia guide, and the global solar proposal software ranking for the category without the Australian lens.

Quote a live Australian job with real STC numbers

A SurgePV engineer takes one of your addresses, deems the STCs against the postcode's solar zone, applies your DNSP's export limit, and produces the branded proposal in 20 minutes.

Book a Free Demo

20 minutes · Bring a real job · No credit card

What An Australian Solar Proposal Has To Get Right

STC deeming, computed not assumed. The Small-scale Renewable Energy Scheme creates certificates for systems under 100 kW based on capacity, solar zone, and remaining scheme years to December 2030. Most retailers pass the value through as an upfront discount in exchange for assignment. The deeming period shortens each year, so a rebate figure hardcoded in a template decays annually without anyone noticing. SurgePV’s STC scheme guide covers the mechanics.

CEC accreditation and approved products. STC eligibility requires a CEC-accredited installer holding a relevant electrical licence and maintaining accreditation annually, plus CEC-approved components. Both halves matter. See SurgePV’s CEC accreditation guide.

AS/NZS compliance at design time. AS/NZS 5033:2021 sets DC cable sizing, string protection fusing, array and frame earthing, arc fault detection, and commissioning testing. AS 4777.2:2020 sets grid connection behaviour including volt-watt and volt-VAR response, ride-through, and anti-islanding. AS/NZS 5139:2019 governs battery installation. The AS/NZS 5033 guide and AS 4777.2 guide cover the detail.

DNSP export limits. Ausgrid in NSW, Energy Queensland, SA Power Networks, and Western Power all set their own limits and connection conditions, and constrained areas increasingly get dynamic or zero export. See the export limits guide.

The Two Errors That Cost Australian Installers Money

The deeming error. Because the scheme ends in December 2030, the deeming period shortens every year on 1 January. A template carrying last year’s per-kW rebate overstates the discount, and the gap widens each year until the scheme closes. Solar zone compounds it: the same system deems differently in Zone 1 and Zone 4, so a national flat rate is wrong nearly everywhere.

The consequence is the same in both cases. The installer who models honestly looks more expensive than the one who does not, and loses deals on a comparison that was never valid. The defence is to show the constraint explicitly in the proposal, because a customer who understands the export limit will accept a smaller system or a battery rather than assume you are padding.

The Platforms Australian Installers Should Evaluate

1. SurgePV, the integrated pick

Proposal generated from the same project record as the design. STC deeming from size and solar zone, AS/NZS 5033 and AS 4777.2 checks, DNSP export limit modelling, 8,760-hour module-level shading, bankable P50, P75, P90, and white-label proposals with e-signature. $1,299 to $1,899 per user per year flat.

2. OpenSolar

The default in Australian residential, and free at entry, which is a genuinely strong position. STC handling is solid. Shading is simplified, and add-ons stack at commercial scale. See our OpenSolar alternative breakdown for where the free tier stops paying off.

3. Solargraf

Fast, clean residential documents with e-signature, Enphase-owned. Sits downstream of a design tool. Roughly $1,200 to $2,400 per user per year. More in our Solargraf alternative review.

4. Aurora Solar

Deep residential design built for US utility structures. No STC deeming, no CEC product list, no DNSP export rules. Defensible only for commercial-heavy teams willing to handle Australian specifics manually. See our Aurora Solar alternative comparison.

5. Pylon

Fast residential proposals for sales-led teams, limited engineering depth, per-feature pricing. Covered in our Pylon alternative comparison.

6. SunSniffer and local proposal tools

Several Australia-specific quoting tools handle STC and CEC paperwork well but carry thin simulation. Workable for straightforward residential where the design question is already settled.

7. Spreadsheet plus a design tool

Still common in smaller operations. The main source of stale deeming rates in circulating quotes, because nobody updates the sheet on 1 January.

Australia Solar Proposal Software Comparison

Australia solar proposal software compared on STC, export limits, CEC filtering and price
ToolSTC deeming by zoneDNSP export limitsCEC product filteringAS/NZS checksProposal from design recordPricing (per user / yr)
SurgePVYesYesYesAS/NZS 5033, 4777.2, 5139Yes$1,299 to $1,899
OpenSolarYesPartialYesPartialYesFree + add-ons
SolargrafManualNoNoNoNo$1,200 to $2,400
Aurora SolarNoNoNoNoYes$1,908 to $3,108+
PylonManualNoNoNoNoVaries
Local quoting toolsYesPartialYesPartialPartialAU-market priced
Spreadsheet + design toolManualManualManualManualNoEffectively free

See export limits modelled instead of assumed

SurgePV applies your DNSP's export cap to the 8,760-hour generation profile, shows the curtailed energy separately, and prices the battery case against it.

Book a Free Demo

20 minutes · Bring a real job · No credit card

Worked Example: 10 kW In Adelaide, With And Without An Export Limit

An illustrative calculation showing the size of the export limit effect. Inputs: 10 kW array, 1,550 kWh per kW specific yield, 15,500 kWh generation, 6,200 kWh self-consumed, import at 42c per kWh, feed-in at 5c per kWh.

10 kW in Adelaide with and without a 5 kW export limit (illustrative)
LineUnconstrained export5 kW export limit
Annual generation15,500 kWh15,500 kWh
Self-consumed6,200 kWh6,200 kWh
Exported9,300 kWh6,900 kWh
Curtailed0 kWh2,400 kWh
Value of avoided import at 42c$2,604$2,604
Feed-in income at 5c$465$345
Total year one benefit$3,069$2,949

The headline gap is $120, which looks small. That is the point worth making to the customer: at a 5c feed-in tariff, curtailment barely matters, and the 2,400 kWh being thrown away is worth $120 as export but $1,008 if shifted into household use. On these numbers the export limit is not the problem. The 5c tariff is, and it is the strongest battery argument in the Australian market. A proposal that only reports total savings hides that entirely.

Who Should Choose What

  • Choose SurgePV if you want STC deeming, export limits, AS/NZS checks and proposals in one license, or you run commercial alongside residential.
  • Choose OpenSolar if you are residential-only and entry cost is decisive, accepting simplified shading.
  • Choose Solargraf if you already own a design platform and want a faster customer document.
  • Choose Aurora only if commercial design depth outweighs handling Australian specifics manually.
  • Choose Pylon or a local quoting tool if proposal speed on straightforward residential is the whole job.
  • Drop the spreadsheet if it still carries a hardcoded per-kW STC figure, which decays every January.

After signing, pipeline and follow-up move to a CRM. QuickEstimate takes the handoff from SurgePV by API.

One license for STC deeming, export limits and proposals

AS/NZS 5033 and AS 4777.2 checks, CEC-approved component filtering, DNSP export caps, 8,760-hour shading and white-label proposals from $1,299 per user per year.

Book a Free Demo

Or see pricing · Australia compliance library

The Bottom Line

Australia is the most mature rooftop market in the world, and the two things that decide an Australian proposal’s accuracy are both moving targets: a rebate that shrinks annually and export rules that tighten locally.

  • Recompute STCs, never hardcode them. Deeming shortens every 1 January and varies by solar zone, so any flat per-kW figure in your template is already wrong somewhere.
  • Model the export limit and show the curtailed energy. At a 5c feed-in tariff, curtailed kWh are the clearest battery argument you have, but only if the proposal shows them.
FAQ

Frequently Asked Questions

What is the best solar proposal software for Australian installers in 2026?
SurgePV for teams wanting the proposal generated from the same bankable design record, with STC deeming calculated from system size and solar zone, AS/NZS 5033 checks, and DNSP export limits applied at design time. OpenSolar is dominant in Australian residential and free at entry, which is hard to argue with for simple jobs. Solargraf and Aurora are credible but neither carries STC deeming or Australian export limit rules natively.
How should solar proposal software calculate STCs?
STCs are created from system size, the solar zone rating of the installation postcode, and the years remaining in the scheme, which ends in December 2030. Because the deeming period shortens each year, the same system generates fewer certificates in 2027 than in 2026, and the rebate value falls accordingly. Most installers offer an upfront discount equal to the STC value in exchange for assignment. Software that hardcodes a flat per-kW rebate will be wrong within a year, and wrong immediately across zone boundaries.
Do Australian solar proposals need to model DNSP export limits?
Yes, and this is where generic tools fail most visibly. Distribution networks set their own export limits, and many now apply dynamic or zero-export conditions in constrained areas. A 10 kW system on a 5 kW export limit behaves nothing like an unconstrained one, because the excess is curtailed rather than sold. A proposal built on unconstrained export overstates the feed-in income and, on a system sized to export, overstates the payback substantially.
Does CEC accreditation affect the proposal?
It determines whether the customer receives the STC rebate at all. STC eligibility requires a CEC-accredited installer, and accreditation must be maintained annually alongside a relevant electrical licence. A quote showing the STC discount against an unaccredited install is showing a discount the customer cannot claim. Products must also be on the CEC approved list, so component selection is part of eligibility rather than just preference.
How much does solar proposal software cost in Australia?
OpenSolar is free at entry with per-feature add-ons, which is why it dominates Australian residential. Solargraf runs roughly $1,200 to $2,400 per user per year. SurgePV is $1,299 to $1,899 per user per year with design and proposals in one license, putting a five-seat team at $6,495. Aurora at $159 to $259 per user per month is generally hard to justify against Australian residential margins unless you are commercial-heavy.
Which standards does Australian solar design and proposal software need to respect?
AS/NZS 5033:2021 governs array installation including DC cable sizing, string protection fusing, array and frame earthing, arc fault detection, and commissioning testing. AS 4777.2:2020 governs grid connection, covering volt-watt and volt-VAR response, frequency and voltage ride-through, and anti-islanding settings. AS/NZS 5139:2019 covers battery energy storage installation and safety. Inverter settings under AS 4777.2 matter to the proposal because volt-watt response can curtail output on weak network segments.
Can one platform handle both Australian and New Zealand projects?
Yes. AS/NZS standards are joint Australian and New Zealand documents, so the core design rules carry across. What differs is the incentive and export side: New Zealand has no STC equivalent, and buyback rates are set per retailer. SurgePV ships the AS/NZS library and handles both markets from one seat, which suits trans-Tasman operators.
Akash Hirapara
Written by

Akash Hirapara CFO, Qbits Energy

CFO overseeing solar financing, procurement, and channel partner enablement at Qbits.

Related Reading
Solar Software 9 min

Solar Bid Software: Win More Deals in 2026

Solar bid software should produce a bankable proposal in under 20 minutes. Here is how SurgePV ships fast layout, yield, finance, and branded output.

Get Started

Continue your solar software research

Compare the workflow, inputs and limitations that matter to your task before choosing software.