Skip to content
Buying Guide

Why Qbits Inverter Prices Are Quote-Based

Why Qbits publishes inverter specifications but not a public price list, what changes a project quote, and how EPC buyers can request comparable written pricing.

Akash Hirapara
Akash Hirapara CFO
September 26, 2026 9 min read

Qbits publishes inverter specifications, but it does not publish a per-unit price list. An EPC buyer needs a dated written quotation. It must fix the exact model, quantity, included hardware, delivery basis, tax treatment, documents, warranty reference, exclusions, and validity before two prices are comparable.

That does not make quote-based pricing automatically better. A public list reduces friction and gives buyers a quick budget reference. A vague quotation can be worse than a price list. The quotation earns its value only when it defines exactly what the buyer will receive.

What a public price list can and cannot tell an EPC

A price list is useful for orientation, while a quotation should control a purchase decision. The two documents solve different problems.

What a price list, quotation, purchase order and written warranty each settle and leave open
DocumentWhat it does wellWhat it usually cannot settle
Public price listFast budget reference, visible catalogue, simple model-to-price lookupProject quantity, destination, freight basis, accessories, document scope, current validity
Dated quotationFixes a defined supply scope for a named buyer and projectBroader market benchmark unless the buyer obtains comparable alternatives
Purchase orderRecords what the buyer is orderingMissing or ambiguous terms inherited from the quotation
Written warranty documentDefines the controlling warranty termsPrice, delivery scope, or technical suitability

The practical trade-off is transparency versus specificity. Publishing a list would make the first budgeting step easier. Using quotations lets each enquiry be tied to a model and scope, but it also places more responsibility on the buyer to demand a complete document.

For broad capacity and market-price research, use the solar inverter price guide. This page addresses the next step: turning a Qbits product requirement into a comparable quotation.

Why one capacity label does not define one product

A request for a “5 kW inverter” is not precise enough to price or procure. Capacity alone does not identify topology, phase, MPPT arrangement, DC limits, communication hardware, or the exact model.

Two products can share a capacity label and still serve different designs. An on-grid model and a hybrid model do not have the same power path. Single-phase and three-phase units are not substitutes. Even within one family, tracker count or communication options may vary by model.

Begin with the current Qbits datasheet library and record the exact model identifier. If it is not yet selected, send the design inputs and ask the seller to identify the proposed model. The datasheet-reading guide shows how to carry that identifier into a BOQ and technical submission.

The scope fields that make a quotation usable

A useful inverter quotation fixes the commercial boundary around the exact product. These fields prevent most false comparisons.

Scope fields a usable inverter quotation should fix
FieldWhat the quotation should identifyWhy it matters
ProductExact model and quantityPrevents capacity-only substitution
Included hardwareCommunication device, connectors, mounting items, or other named accessoriesSeparates included items from later additions
Supply boundarySupply only, or any additional stated workStops one price from carrying work that another excludes
DeliveryDestination and whether freight or transit cover is includedMakes the delivered scope visible
Tax treatmentHSN treatment, applicable tax line, and whether the total includes itKeeps tax assumptions out of the base-price comparison
DocumentsDatasheet, test or compliance documents requested by the project, and invoice documentsLinks the commercial offer to the technical submission
Commissioning supportIncluded, excluded, remote, or site-based, if offeredPrevents an undefined support expectation
Warranty referenceCurrent written document name or version supplied with the quoteAvoids treating a headline period as the full policy
ExclusionsEvery item the seller is not supplyingExposes scope gaps before the order
ValidityLast date on which the quotation can be acceptedKeeps an old number from being reused as a current offer

Not every project needs every optional item. The point is to mark each field as included, excluded, not applicable, or clarification required. Blank space is not a commercial term.

A copy-ready request for quotation

Send a structured request instead of asking only for the “best price”. A model-first request gives the sales team enough context to return a useful document.

Copy this into your enquiry and replace the brackets:

Subject: Solar inverter quotation request for [project name or city]

Buyer organisation: [name]
Role: EPC / Installer
Project city and delivery destination: [city, state, postcode]
Application: [on-grid or hybrid]
Connection phase: [single phase or three phase]
Exact inverter model: [model identifier, if selected]
Quantity: [units]
System size: [kW or kWp, with the basis stated]
Required communication or accessories: [list or none]
Supply boundary: [supply only, or define additional required scope]
Required documents: [list the project documents]
Required delivery date: [date, for availability confirmation]

Please show separately:
1. Unit and extended price for the stated model and quantity
2. Included accessories
3. Freight and delivery basis
4. HSN and tax treatment
5. Commissioning or technical support included, if any
6. Current written warranty document or version
7. Exclusions
8. Quotation validity
9. Any assumptions or proposed substitutions

The request asks the seller to confirm availability against a required date. It does not assume or promise a lead time.

How to use the Qbits contact form for an EPC quote

The Qbits contact form can carry a structured product enquiry, but the message must contain the model and scope. The form requires name, email, phone, and a message. It also provides EPC / Installer as a role, Product Inquiry as an inquiry type, an optional system-size field, and a city field.

Select those fields, then paste the completed request above into the message box. If the model is undecided, state the application, phase, system size, module details, and required documents instead. Ask the reply to name the proposed model.

The form does not promise a response time. Plan your procurement schedule without assuming one.

Normalise two quotations before comparing price

Place both quotations into the same comparison sheet and stop at the first unresolved mismatch. Do not adjust a missing field silently.

Comparison sheet for normalising two quotations
Comparison fieldQuotation AQuotation BReview status
Exact modelMatch / mismatch / clarification required
QuantityMatch / mismatch / clarification required
Topology and phaseMatch / mismatch / clarification required
Included communication hardwareMatch / mismatch / clarification required
Other accessoriesMatch / mismatch / clarification required
Supply boundaryMatch / mismatch / clarification required
Delivery destination and basisMatch / mismatch / clarification required
Tax treatmentMatch / mismatch / clarification required
Required documentsMatch / mismatch / clarification required
Commissioning supportMatch / mismatch / clarification required
Written warranty document or versionMatch / mismatch / clarification required
ExclusionsMatch / mismatch / clarification required
Validity dateCurrent / expired / clarification required
Comparable totalCompare only after every material row is resolved

If one quotation includes delivery and another is ex-works, they are not comparable. If one names a communication device and another says “standard accessories”, they are not comparable. If one references written warranty terms and another uses only the word “warranty”, the risk allocation is still unclear.

When to mark clarification required

Use clarification required whenever a buyer would have to guess. Common triggers include:

Send all clarification questions together and ask for a revised quotation. A chain of verbal answers is harder to review and easier to lose than one corrected document.

What a quotation still does not prove

A quotation records an offer. It does not prove technical fit, current approval, product reliability, or warranty coverage beyond the referenced documents. Keep these checks separate.

Engineering should verify the exact model against the string design and project requirements. Procurement should confirm that every required document is current and applies to that model. The contract owner should review the controlling warranty, exclusions, acceptance terms, and remedies.

Price should be compared only after those gates pass. The inverter procurement guide covers the later RFQ, order, inspection, acceptance, and document-control stages. The inverter TCO worksheet handles operating, downtime, service, and replacement scenarios without pretending that a quotation predicts them.

Request an exact-scope Qbits quotation

Prepare the model-first request, resolve every blank field, and retain the dated reply with the technical documents used for selection. Then request a Qbits inverter quotation with your project city, exact model or design inputs, quantity, accessories, document needs, and delivery destination.

Do not compare the final figure until the model and supply boundary match. That is the difference between collecting prices and running procurement.

Qbits models

Specs below come from each model's datasheet. Confirm the exact model and current written terms with Qbits before you buy.

Browse all on-grid inverters →

FAQ

Frequently Asked Questions

Why does Qbits not publish an inverter price list?
Qbits publishes product specifications but handles pricing through quotations. An EPC should require a dated quotation that fixes the exact model, quantity, included accessories, delivery destination, tax treatment, documents, warranty reference, exclusions, and validity. A public list can help early budgeting, but it cannot define those project-specific items.
What should an EPC send when requesting a Qbits inverter quote?
Send the exact model or required topology and phase, quantity, project city, delivery destination, required communication hardware, scope boundary, document list, and required delivery date. Ask for taxes, freight, exclusions, quotation validity, and the controlling written warranty document to be identified separately.
How should two solar inverter quotations be compared?
First normalise both quotations to the same exact model, quantity, accessories, delivery basis, tax treatment, documents, commissioning scope, and warranty evidence. Mark any missing field as clarification required. Compare price only after both columns describe the same supply boundary.
Is quote-based pricing automatically better than a published price list?
No. A public price list is faster for early budgeting and makes an initial benchmark easier. A quotation is useful only when it is complete, dated, and specific enough to compare. An unclear quotation creates the same problem as an incomplete price list.
Akash Hirapara
Written by

Akash Hirapara CFO, Qbits Energy

CFO overseeing solar financing, procurement, and channel partner enablement at Qbits.

Related Reading
Get Started

Compare inverters for your application

Shortlist the right inverter type and phase, then request current documents and an exact-model quotation.