Skip to content
Policy

Solar Subsidy in Karnataka 2026, BESCOM Guide

Solar subsidy in Karnataka 2026 combines PM Surya Ghar (₹78,000 for 3 kW) with BESCOM's online net-metering portal, Karnataka's high urban solar adoption, and 5.5 peak sun hours.

Akash Hirapara
Akash Hirapara CFO
June 5, 2026 Updated October 14, 2026 17 min read

ALMM and inverter compliance: MNRE’s current ALMM page publishes solar PV module and cell lists, not an inverter list. Verify the inverter’s exact model documents and applicable scheme or DISCOM requirements separately.

Karnataka homeowners asking about solar in 2026 have one distinct advantage over most other Indian states: BESCOM, which covers Bangalore and the surrounding districts, operates one of the most digitised solar net metering portals in the country. Combined with Karnataka’s high solar irradiance, 5.0 to 6.0 kWh/m²/day in much of the state, and the central PM Surya Ghar subsidy of up to ₹78,000 for a 3 kW system, rooftop solar in Karnataka delivers some of the most attractive payback economics in India.

This guide covers the complete Karnataka solar subsidy picture: what the central scheme provides, how BESCOM’s online application process works, what the four non-BESCOM DISCOMs (HESCOM, MESCOM, CESC, GESCOM) require, realistic timelines, the documents you will need, and a worked example from a Bangalore homeowner.

Karnataka’s solar subsidy in 2026 rests primarily on the central PM Surya Ghar scheme. The scheme provides up to ₹78,000 for a 3 kW residential system. Karnataka does not currently operate a separate state cash top-up comparable to Gujarat’s programme. What Karnataka provides instead is high irradiance (5.0–5.5 kWh/m²/day in Bangalore, up to 6.0 in northern Karnataka), BESCOM’s relatively efficient online portal, and a KERC net metering framework that credits surplus generation annually at approximately ₹3.00–₹4.00 per unit.

Understanding the DISCOM-specific process is critical, Karnataka has five DISCOMs serving different geographies, and each has different processing speeds and documentation requirements. The PM Surya Ghar complete guide covers the national scheme; this post adds the Karnataka layer.

What PM Surya Ghar Provides in Karnataka: The Central Subsidy

The Pradhan Mantri Surya Ghar Muft Bijli Yojana is administered nationally through pmsuryaghar.gov.in and disbursed as a direct bank transfer after installation and commissioning. The subsidy structure is nationally standardised:

PM Surya Ghar central subsidy by residential system size
System SizeRateTotal Central Subsidy
1 kW₹30,000/kW₹30,000
2 kW₹30,000/kW₹60,000
3 kW₹30,000 (first 2 kW) + ₹18,000 (third kW)₹78,000
4 kW+Capped at 3 kW equivalent₹78,000 maximum
₹020,00040,00060,00080,0001 kW2 kW3 kW4 kW and above₹30,000₹60,000₹78,000₹78,000₹020,00040,00060,00080,0001 kW2 kW3 kW4 kW andabove₹30,000₹60,000₹78,000₹78,000
Central PM Surya Ghar subsidy by system size
ItemValue (₹)
1 kW₹30,000
2 kW₹60,000
3 kW₹78,000
4 kW and above₹78,000
Central PM Surya Ghar subsidy by system sizeSource: MNRE PM Surya Ghar Muft Bijli Yojana portal (pmsuryaghar.gov.in), subsidy structure as cited in this article, 2026Capped at the 3 kW amount for larger systems.

₹78,000. The maximum central subsidy under PM Surya Ghar Muft Bijli Yojana for a 3 kW residential system, paid directly to the buyer’s bank account after commissioning. Source - MNRE PM Surya Ghar Portal, 2026.

Karnataka State Solar Policy: What KREDL Administers

Karnataka does not offer a dedicated state-level cash top-up for residential rooftop solar in 2026 comparable to Gujarat’s Surya Gujarat or Maharashtra’s Mukhyamantri Saur Krishi Vahini equivalents. The state’s solar policy framework, administered by KREDL (Karnataka Renewable Energy Development Ltd), is oriented primarily toward utility-scale and commercial-industrial solar rather than residential incentives.

What the Karnataka state framework does provide for residential applicants:

  • Empanelled vendor lists: KREDL maintains state-level empanelment of solar vendors for state-sponsored programmes; however, PM Surya Ghar uses DISCOM empanelment.
  • KERC net metering regulations: Karnataka Electricity Regulatory Commission sets the export tariff and banking mechanism that governs residential surplus generation.
  • HESCOM, MESCOM, CESC, GESCOM facilitation: KREDL coordinates with all five DISCOMs on implementation of national programmes and sets compliance standards.

The practical implication for Karnataka homeowners: your subsidy income is the central PM Surya Ghar amount. The state does not currently add additional cash. The economic case still works well, primarily because Karnataka’s solar resource is genuinely strong.

5.5 kWh/m²/day. The average solar irradiance in Bangalore, making Karnataka’s capital one of India’s better cities for rooftop solar generation. Northern Karnataka districts like Kalaburagi and Vijayapura receive up to 6.0 kWh/m²/day. Source - NREL Global Solar Atlas, NREL, 2026.

The 5-Pillar Karnataka Subsidy Stack Framework

Navigating the Karnataka solar subsidy process requires managing five distinct elements in sequence. Each pillar must be completed correctly to ensure the central subsidy is received without delay.

The 5-Pillar Karnataka Subsidy Stack

  1. National portal registration: Register at pmsuryaghar.gov.in with your DISCOM consumer number, Aadhaar details, and bank information before any installation begins. Registration after installation creates verification complications and often delays subsidy disbursement.

  2. DISCOM technical feasibility: Submit to your DISCOM (BESCOM for Bangalore, or one of the four regional DISCOMs) for technical feasibility approval. BESCOM accepts online submissions through its consumer portal; other DISCOMs may require in-person submission at divisional offices.

  3. Installation by an empanelled vendor: Once the written feasibility consent letter arrives, a DISCOM-empanelled installer completes the installation and you request inspection through the DISCOM portal.

  4. Net meter commissioning: After installation, the DISCOM replaces your existing meter with a bidirectional smart meter. BESCOM’s queue for this step typically runs 30 to 45 days post-inspection.

  5. Subsidy disbursement: After commissioning is confirmed on the PM Surya Ghar portal, the central subsidy transfers to your Aadhaar-linked bank account within 30 days. Karnataka does not currently have a parallel state disbursement mechanism for a separate top-up.

Karnataka’s Five DISCOMs: Which One Covers Your Area?

Karnataka’s electricity distribution is divided among five companies, each with distinct geographic coverage and varying levels of digital infrastructure for solar applications.

BESCOM: Bangalore and Surrounding Districts

BESCOM (Bangalore Electricity Supply Company Limited) covers Bangalore Urban, Bangalore Rural, Tumkur, Kolar, Chikkaballapur, and Ramanagara. It is Karnataka’s largest DISCOM by consumer base and has the most developed digital portal for solar applications. BESCOM’s online application system allows submission, document upload, status tracking, and communication without requiring office visits for standard residential cases. Portal: bescom.karnataka.gov.in. Planning estimate for straightforward residential applications: about 55 to 85 days from submission to commissioned meter.

HESCOM: Northern Karnataka

HESCOM (Hubballi–Dharwad Electricity Supply Company) covers Hubballi–Dharwad, Gadag, Haveri, Uttara Kannada, Belagavi, and Bagalkot. Northern Karnataka has higher solar irradiance than Bangalore but HESCOM’s application processing is less digitised. Plan for about 75 to 115 days for net metering completion. HESCOM divisional offices in Hubli and Belagavi are the primary contact points.

MESCOM: Coastal Karnataka

MESCOM (Mangaluru Electricity Supply Company) covers Mangaluru, Udupi, Chikkamagaluru, Shivamogga, Kodagu, and Hassan. Coastal Karnataka’s higher humidity and moderate irradiance (4.8 to 5.2 kWh/m²/day) make IP66 weather-rated equipment particularly important here. MESCOM processing: plan for about 75 to 115 days.

CESC: Mysuru Region

CESC (Chamundeshwari Electricity Supply Corporation) covers Mysuru, Mandya, Chamarajanagar, and Kodagu. Mysuru city has a growing residential solar market. CESC portal: cescmysore.karnataka.gov.in. Timeline: plan for about 75 to 115 days.

GESCOM: Hyderabad Karnataka

GESCOM (Gulbarga Electricity Supply Company) covers Kalaburagi, Bidar, Yadgir, Koppal, Ballari, and Raichur. This region has the highest solar irradiance in Karnataka (up to 6.0 kWh/m²/day) but lower urban density. GESCOM processing timelines can run longer in rural subdivisions; plan for about 75 to 115 days or more.

Karnataka DISCOMs by coverage area, approximate net metering timeline (planning estimates from the stage table below, not DISCOM-published) and portal
DISCOMCoverageApprox. TimelinePortal
BESCOMBangalore + 5 districts55–85 daysOnline (best in class)
HESCOMNorthern Karnataka75–115 daysPartial online
MESCOMCoastal Karnataka75–115 daysPartial online
CESCMysuru region75–115 daysPartial online
GESCOMHyderabad Karnataka75–115 daysLimited online

BESCOM Net Metering: The Online Process Step by Step

BESCOM has invested significantly in its consumer digital infrastructure. The solar net metering application is largely paperless for standard residential cases. Here is the actual sequence:

  • Step 1: Portal login: Access BESCOM’s consumer services portal or use the PM Surya Ghar national portal, which routes BESCOM consumers to the BESCOM backend. Log in with your consumer number.
  • Step 2: Solar application submission: Fill the net metering application form online. Specify proposed system capacity, inverter type, and installer details. Upload scanned documents (bill, Aadhaar, PAN, property proof, rooftop photographs).
  • Step 3: Feasibility assessment: BESCOM’s divisional office reviews the application. For standard cases (1–3 kW, existing meter board adequate), approval is granted online with a digital feasibility consent letter. Complex cases (larger systems, older infrastructure) require a site visit.
  • Step 4: Installation and inspection request: After feasibility approval, the empanelled installer completes the installation. The consumer then submits an inspection request through the BESCOM portal, uploading post-installation photographs and the installer’s completion certificate.
  • Step 5: BESCOM inspection: A BESCOM technician visits within 7 to 15 days of inspection request to physically verify the installation matches the approved design.
  • Step 6: Meter change: Following a successful inspection, BESCOM orders the bidirectional meter change. This is the longest step, 30 to 45 days in most Bangalore divisions.
  • Step 7: Commissioning and subsidy trigger: Once the bidirectional meter is active, BESCOM updates the PM Surya Ghar portal. The central subsidy disbursal begins within 30 days.

Karnataka Net Metering Economics: What KERC Rules Mean for Your Bill

Karnataka’s net metering framework under KERC (Karnataka Electricity Regulatory Commission) governs how surplus generation is credited and how annual settlements work.

How Karnataka net metering billing works:

Under the KERC net metering regulation, monthly surplus generation (units where your solar system generates more than your consumption) is credited as a carry-forward balance. At the end of the financial year (typically March 31st), any remaining banked units are settled at the applicable export tariff, not at the import tariff.

This distinction matters significantly for economics:

  • Import tariff (what you pay per unit drawn from the grid): depends on your consumption slab; assumed ₹6.50 average in the example below
  • Export tariff (what the DISCOM pays for surplus): set by the applicable KERC order; assumed ₹3.50 in the example below

The gross metering vs net metering comparison explains the broader billing mechanics, which is useful background before the BESCOM portal application.

Documents Required for Karnataka Solar Subsidy: State-Specific Checklist

  • Aadhaar card: Linked to OTP-enabled mobile for PM Surya Ghar portal authentication
  • PAN card: Required for subsidy disbursement
  • Bank account proof: Passbook or cancelled cheque; account must be Aadhaar-linked for direct transfer
  • Property ownership: Khata certificate from BBMP/Panchayat, sale deed, or property tax receipt
  • For apartments, Association NOC: Apartment owners association or RWA letter permitting rooftop installation, specifying allocated rooftop area
  • Rooftop photographs: Minimum four views showing shadow-free area and existing electrical board
  • Installer’s technical feasibility form: Signed by DISCOM-empanelled vendor; includes single-line diagram of proposed system

For BESCOM applicants, all documents can be uploaded digitally through the BESCOM consumer portal. For HESCOM, MESCOM, CESC, and GESCOM, call the divisional office in advance to confirm whether physical submission is still required.

Timeline: What Is Realistic for Karnataka in 2026

Stage-by-stage planning timeline, BESCOM versus other Karnataka DISCOMs (estimates; totals are the sums of the stage ranges)
StageBESCOM (Bangalore)Other Karnataka DISCOMs
Portal registration1–2 days1–2 days
Technical feasibility15–25 days20–40 days
Installation7–14 days (post-approval)7–14 days
Inspection + meter change30–45 days45–60 days
Subsidy disbursement30 days (post-commissioning)30 days
Total to commissioning (excluding subsidy)53–86 days73–116 days
Total including subsidy disbursement83–116 days103–146 days

Karnataka’s monsoon (June–September) does not significantly slow the application process but does reduce generation during those months. For consumers wanting to begin benefiting from solar generation before the next summer, filing applications in September–October (as the monsoon ends) means commissioning around December–January, right before the high-irradiance spring months.

A Bangalore Homeowner Example: Whitefield, 3 kW System (Illustrative)

This is an illustrative scenario, not a real customer. Take a 4 BHK independent house in Whitefield, Bangalore, served by BESCOM. The monthly bill averages ₹4,200 (500–600 units per month, including air conditioning). Here is how the solar subsidy process would play out.

Costs and subsidies:

  • Gross system cost: ₹2,00,000 (installed)
  • Central PM Surya Ghar subsidy: ₹78,000
  • Net out-of-pocket: ₹1,22,000

Energy economics:

  • Annual generation estimate: about 4,500 kWh (3 kW × 5.2 peak sun hours × 365 × 0.79 efficiency = 4,498 kWh)
  • Annual savings at 85% self-consumption (₹7/unit blended): approximately ₹26,800 (3,823 kWh × ₹7)
  • Annual export earnings (15% at ₹3.50/unit): approximately ₹2,360 (675 kWh × ₹3.50)
  • Total annual benefit: approximately ₹29,100
  • Payback period: approximately 4.2 years post-subsidy (₹1,22,000 ÷ ₹29,100)

BESCOM experience (illustrative): The owner submits the BESCOM application online in October 2025. Technical feasibility approval comes in 22 days. Installation is completed in November 2025. BESCOM inspection happens 11 days after the inspection request is submitted online. The meter change takes 38 days, the main bottleneck. The first subsidised bill arrives in January 2026. The subsidy credit reaches the bank account 28 days after commissioning confirmation.

Key insight: The BESCOM online portal reduces paperwork friction significantly compared with HESCOM applications in Hubli, which are less digitised. The physical meter change remains the unavoidable delay regardless of portal efficiency.

Pros and Cons of Going Solar in Karnataka in 2026

Pros and cons of going solar in Karnataka by DISCOM area and system type
ProsCons
BESCOM area (Bangalore)✓ Online portal, digitised process, about 55–85 day timeline✗ High application volume, meter change queue, monsoon reduces generation 30–40%
Other Karnataka DISCOMs✓ Higher irradiance in northern/Hyderabad Karnataka✗ Less digital process, about 75–115 days to commissioning, may need in-person submission
On-grid system✓ Lowest cost, fastest payback, subsidy-eligible✗ No backup during grid failure, exports at lower export tariff
Hybrid system✓ Battery backup, grid-independent critical loads✗ 25–40% higher upfront, longer payback

For most Bangalore homeowners with reliable BESCOM supply and no critical backup requirement, the on-grid system with a payback of roughly 3 to 4 years post-subsidy is the correct financial decision. The on-grid vs hybrid comparison provides the full decision framework.

Common Mistakes Karnataka Solar Applicants Make

  • Not verifying vendor DISCOM empanelment: Karnataka has many solar installers, but only DISCOM-empanelled vendors can process PM Surya Ghar applications. Ask the vendor to show their empanelment certificate for the specific DISCOM (BESCOM, HESCOM, etc.) before paying any advance; a directory such as Heaven Green Energy’s local installer finder{target=“_blank” rel=“noopener”} is a reasonable starting point for shortlisting vendors to verify.

  • Installing before DISCOM feasibility approval: Even if the installer assures you approval is “just a formality,” install only after the written feasibility consent letter arrives. Pre-installation claims are frequently not honoured if the feasibility is later denied or modified.

  • Choosing a 5 kW system when the bill supports only 3 kW: The PM Surya Ghar subsidy is capped at 3 kW regardless of system size. For a Bangalore home consuming 450–600 units per month, a 3 kW system covers most of the bill without over-generating and exporting at the lower tariff.

  • Underestimating the monsoon impact on payback: Bangalore’s June–September monsoon reduces daily generation by 30 to 40 percent compared to the dry season. Payback calculations should use annual generation figures, not summer peak figures, to avoid overestimating economics; SurgePV’s financial modeling tool{target=“_blank” rel=“noopener”} lets you factor seasonal generation swings into the payback estimate rather than relying on a flat monthly average.

The net metering India complete guide and the how to apply for net metering guide together provide the full procedural background before the BESCOM portal application.

Where Qbits Fits in a Karnataka Rooftop System

Karnataka’s climate (particularly the coastal MESCOM zone with high humidity and the intense summer heat in the Hyderabad Karnataka region served by GESCOM) puts specific demands on inverter hardware. Coastal humidity accelerates corrosion in standard IP65 units. Northern Karnataka’s 45 °C+ ambient temperatures require inverters that sustain full nameplate output without thermal derating.

  • Hybrid Inverters: Review current QBH model documents and confirm the exact battery, firmware, PV, backup-output, transfer, communication, warranty and project requirements in writing.
  • String Sizing Calculator: Confirm your panel-string configuration against your rooftop area and BESCOM sanctioned load before the feasibility application.

Contact Qbits with the site, load, equipment and document details relevant to this guide. Confirm the responsible party, deliverable, commercial scope and response time after submission.

Qbits models

Specs below come from each model's datasheet. Confirm the exact model and current written terms with Qbits before you buy.

Browse all on-grid inverters →

FAQ

Frequently Asked Questions

What is the solar subsidy available in Karnataka in 2026?
Karnataka homeowners access the central PM Surya Ghar Muft Bijli Yojana, which provides ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kilowatt - a maximum of ₹78,000 for a 3 kW system. Karnataka does not currently operate a separate state-level residential rooftop solar cash top-up comparable to Gujarat's Surya Gujarat scheme. However, KREDL (Karnataka Renewable Energy Development Ltd) administers state solar policy and provides facilitation support. Applicants should verify any new state incentives at kredl.kar.gov.in before applying, as policy positions can change between financial years.
Which DISCOM handles solar applications in Bangalore?
BESCOM (Bangalore Electricity Supply Company Limited) covers Bangalore Urban, Bangalore Rural, Tumkur, Kolar, Chikkaballapur, and Ramanagara districts. Bangalore city homeowners apply through BESCOM, which operates one of the more digitised solar application portals among Karnataka's five DISCOMs. BESCOM's consumer portal allows online submission, tracking, and status updates for net metering applications. Homeowners outside Bangalore should identify their DISCOM: HESCOM (Hubli–Dharwad area), MESCOM (Mangaluru), CESC (Mysuru), or GESCOM (Kalaburagi).
How long does BESCOM net metering approval take in 2026?
For straightforward residential applications in Bangalore, a reasonable planning estimate for the BESCOM net metering timeline is about 55 to 85 days from online portal submission to commissioned bidirectional meter (the sum of the stage estimates in the timeline table below; BESCOM publishes no standard end-to-end time). BESCOM's online portal has reduced paperwork processing time compared to earlier years, but the physical meter change remains a bottleneck. Applications in BESCOM's high-density divisions (Bengaluru South, Indiranagar, Whitefield) may take longer due to application volume. HESCOM and MESCOM may run longer, about 75 to 115 days on the same stage estimates, because of lower digital processing maturity.
What is the net metering export rate in Karnataka?
Karnataka's net metering framework is regulated by KERC (Karnataka Electricity Regulatory Commission). The export credit for residential rooftop solar and the settlement of banked units are set by the applicable KERC order, and the import tariff depends on your consumption slab, so read the current KERC order and your BESCOM or other DISCOM bill. In this guide's examples we assume an export rate of ₹3.50 per unit and an import rate of ₹6.50 per unit (assumptions, not published figures); where the export rate is lower than the import rate, self-consumption is more valuable than grid export.
Does Karnataka have a state solar policy beyond PM Surya Ghar?
Yes. Karnataka operates under the Karnataka Solar Policy 2014–2021 framework, with extensions and updates administered by KREDL. The state policy primarily targets utility-scale and commercial solar rather than residential subsidy top-ups. KREDL maintains a renewable energy facilitation role and manages state-level empanelment of solar vendors. For residential consumers, the primary financial incentive remains the central PM Surya Ghar subsidy. Homeowners in Karnataka benefit more from the state's high solar irradiance (5.0–6.0 kWh/m²/day in northern Karnataka) than from additional state cash incentives.
What documents are needed for Karnataka solar subsidy application?
Keep ready a recent electricity bill showing your consumer number and the ESCOM, Aadhaar-based identity for the portal's e-KYC, a bank account in the applicant's name, proof of ownership or a no-objection certificate from the owner or RWA, a mobile number and email, and your roof details. The application goes through the PM Surya Ghar national portal, and your ESCOM runs the feasibility check, inspection and net metering. Document lists change, so confirm the current list on the portal and with your ESCOM before you apply.
Can I get solar subsidy for an apartment in Bangalore?
Yes, provided you hold an individual electricity connection in your name with BESCOM and obtain an NOC from the apartment association or RWA. Bangalore has a large apartment housing stock, and BESCOM processes apartment solar applications routinely. Shadow-free rooftop area allocation per flat is typically the limiting factor - most apartment rooftops can support 1 to 2 kW per unit rather than the full 3 kW subsidy cap. Some large apartment projects have pursued community solar arrangements with single large systems and sub-metered distribution among beneficiary units.
Is rooftop solar economically viable in Bangalore given its climate?
Bangalore receives approximately 5.0 to 5.5 peak sun hours per day on average, with less seasonal variation than north India due to its equatorial latitude. However, Bangalore's monsoon season (June through September) reduces generation by 30 to 40 percent during those four months compared to the dry season. Annual capacity utilisation factor for a well-sited Bangalore rooftop is approximately 18 to 22 percent. A 3 kW system generates roughly 4,500 to 5,200 kWh per year in Bangalore, saving approximately ₹32,000 to ₹37,000 annually at prevailing BESCOM tariffs. Payback post-subsidy is typically 3 to 4 years.
What role does KREDL play in Karnataka solar subsidy?
KREDL (Karnataka Renewable Energy Development Ltd) is the state nodal agency for renewable energy in Karnataka, functioning under the Karnataka government's energy department. KREDL administers state-level renewable energy policy, maintains state vendor empanelment lists for certain schemes, and acts as the facilitating body between MNRE (central government) and Karnataka's five DISCOMs for PM Surya Ghar implementation. Homeowners do not interact with KREDL directly for residential subsidy applications; the primary application channel is the national portal at pmsuryaghar.gov.in routed through the DISCOM.
Akash Hirapara
Written by

Akash Hirapara CFO, Qbits Energy

CFO overseeing solar financing, procurement, and channel partner enablement at Qbits.

Related Reading
Policy 18 min

Solar Subsidy in Delhi 2026, BSES + TPDDL

Solar subsidy in Delhi 2026 stacks PM Surya Ghar (₹78,000 for 3 kW) with a ₹2,000/kW Delhi state top-up across BSES Rajdhani, BSES Yamuna, and TPDDL. Full process inside.

Policy 18 min

Solar Subsidy in Maharashtra 2026, MSEDCL + Central

Solar subsidy in Maharashtra 2026 is the central PM Surya Ghar scheme (up to ₹78,000 for 3 kW) plus MSEDCL net metering. Includes the SMART scheme for low-use homes, DISCOMs, scheme end date and an illustrative payback.

Get Started

Check the rule that applies to your project

Use the issuing authority and your DISCOM documents to confirm the current rule, eligibility and application process for your location.