Salderingsregeling ends 1 January 2027. The best solar proposal software Netherlands installers need shows both scenarios and the battery case. Six tools compared.

Akash Hirapara
Akash Hirapara CFO
August 3, 2026 Updated October 14, 2026 11 min read

Every Dutch solar proposal written between now and 1 January 2027 has a shelf life problem. The salderingsregeling ends on that date, confirmed when the Senate approved the termination in December 2024. A system quoted today will spend a few months under net metering and roughly twenty-five years without it. Yet the standard Dutch quote still leads with a payback figure calculated under netting, which describes the shortest and least representative period of the customer’s ownership. This guide compares the platforms Dutch installers should be using to quote honestly through the transition, and explains why the battery line moves from optional extra to the centre of the document.

Short version. The best solar proposal software for Dutch installers in 2026 is SurgePV, because it computes self-consumption and export separately from an hourly simulation against a real load profile, models terugleverkosten, and can present the pre-2027 and post-2027 scenarios side by side in the same customer document. OpenSolar is free and widely used but assumes annual netting. PV*SOL models self-consumption well but is desktop-bound.

The Netherlands is about to run a live experiment in what happens when a market built on net metering loses it, and the installers who handle the conversation well will take share from those still quoting the old numbers. For the design-side comparison see our best solar design software Netherlands guide, and the global solar proposal software ranking for the category without the Dutch lens.

Quote a Dutch job on post-2027 economics

A SurgePV engineer takes one of your addresses, runs 8,760-hour generation against the household load profile, and produces a proposal showing the savings with and without the salderingsregeling.

Book a Free Demo

20 minutes · Bring a real job · No credit card

What A Dutch Proposal Has To Show From Now On

Two scenarios, not one. A quote issued in 2026 covers a system that operates under two different regimes. Showing only the netting figure is not conservative or optimistic, it is simply describing the wrong period. Showing only the post-2027 figure understates the first months. Both belong in the document, with the post-2027 case as the headline because it governs the asset’s life.

Self-consumption and export as separate lines. Under netting these were the same thing, which is why Dutch quotes historically collapsed them into a net annual figure. From 2027 they are different businesses at different prices. A customer who cannot see the split cannot understand why load shifting or a battery would help.

Terugleverkosten stated explicitly. Several suppliers now charge customers for exporting. Where that applies, export carries a net cost rather than a net income, and a proposal listing export as revenue will not match the first bill.

A battery case with real sizing. Not a bolt-on line item, but a modelled option showing how much surplus the battery actually captures and what that is worth. Our solar plus storage design software comparison covers the dispatch modelling this requires.

The Payback Conversation Dutch Installers Are About To Have

The commercially interesting point is that honesty here is an advantage rather than a cost. A homeowner comparing three quotes, two showing seven year paybacks and one showing a twelve year payback with a clear explanation and a battery option, is being given something the other two did not provide. In a market where the policy change is widely reported and half a million social housing tenants are already being told they will lose money, credibility is worth more than an attractive number.

There is also a practical sales consequence. The post-2027 economics make batteries, heat pump scheduling, and EV charge timing genuinely valuable rather than marginal. Installers who can model those are selling a larger, higher-margin system on a defensible basis. Installers who cannot are selling panels into a market where panels alone stopped being the answer.

The Six Platforms Dutch Installers Should Evaluate

1. SurgePV, the integrated pick

8,760-hour module-level simulation against a real load profile, battery dispatch, configurable export compensation and terugleverkosten, and white-label proposals with e-signature generated from the same project record. Both scenarios can be shown in one document. $1,299 to $1,899 per user per year.

2. OpenSolar

Free at entry and heavily used in Dutch residential, with a clean customer-facing document. The financial logic assumes annual netting, and simplified shading limits self-consumption accuracy. Both become liabilities in 2027. See our OpenSolar alternative breakdown.

3. PV*SOL

Strong European simulation with credible self-consumption and battery modelling. Windows desktop with a thin proposal layer, so it usually pairs with separate quoting. See our PV*SOL alternative comparison.

4. Aurora Solar

Deep residential design built for US utility structures, with no Dutch tariff logic. Difficult to justify here. See our Aurora Solar alternative comparison.

5. Zonneplan-style consumer calculators

Several Dutch tools handle supplier tariff comparison and the consumer-facing sums well, and some already model the 2027 change. They are sales aids rather than design-linked proposal engines.

6. Excel plus a design tool

Common in smaller Dutch operations, and flexible enough to model the transition if someone maintains it. That maintenance burden is the risk, since supplier terugleverkosten and expected compensation rates are both moving.

Netherlands Solar Proposal Software Comparison

Netherlands solar proposal software compared by export split, post-2027 logic and battery sizing
ToolSelf-consumption and export splitPost-2027 export logicTerugleverkostenBattery sizing from hourly surplusProposal from design recordPricing (per user / yr)
SurgePVYesYes, configurableYesYesYes$1,299 to $1,899
OpenSolarPartialAnnual nettingNoLimitedYesFree + add-ons
PV*SOLYesManualManualYesThin layerDesktop licence
Aurora SolarUpper tierNoNoLimitedYes$1,908 to $3,108+
Consumer calculatorsPartialSomeSomeNoNoNL-market priced
Excel + design toolManualManualManualManualNoEffectively free

Show both scenarios in one customer document

SurgePV prices the same system under salderingsregeling and under post-2027 supplier compensation, with the battery case modelled against the actual hourly surplus.

Book a Free Demo

20 minutes · Bring a real job · No credit card

Worked Example: How The Same Quote Reads Under Both Regimes

An illustrative calculation using published expectations for post-2027 compensation. Inputs: 4.8 kWp, 4,560 kWh generation, 3,400 kWh consumption, import at 30 cents per kWh, post-2027 export at 7 cents per kWh, self-consumption 32% without storage, installed cost EUR 5,400.

The same quote under salderingsregeling and from 2027, with and without a 5 kWh battery (illustrative)
LineUnder salderingsregelingFrom 2027, no batteryFrom 2027, plus 5 kWh battery
Self-consumed1,459 kWh1,459 kWh2,918 kWh
Exported3,101 kWh3,101 kWh1,642 kWh
Self-consumption value at 30cEUR 438EUR 438EUR 875
Export valueEUR 930 netted at retailEUR 217EUR 115
Year 1 benefitEUR 1,368EUR 655EUR 990
Simple payback on EUR 5,4003.9 years8.2 years8.5 years including battery cost

The middle column is the one most Dutch customers have not seen yet. The right column is the conversation worth having, because it recovers half the lost benefit and the payback stays competitive once the battery cost is included. A proposal that only shows the left column is quoting a number with a five month shelf life.

Who Should Choose What

  • Choose SurgePV if you want both scenarios, terugleverkosten and modelled battery sizing in one customer document generated from the design record.
  • Choose PV*SOL if your work is engineering-led and someone else builds the quote, and you value its European simulation reputation.
  • Choose OpenSolar only for simple residential where entry cost dominates, and plan to move before January 2027.
  • Avoid Aurora for Dutch residential. Good software, no relevance to the tariff structure.

After signing, pipeline and follow-up sit in a CRM. QuickEstimate takes the handoff from SurgePV by API.

Be ready before 1 January 2027

Hourly self-consumption, battery dispatch, configurable export compensation and white-label proposals from one project record, from $1,299 per user per year.

Book a Free Demo

Or see pricing · Europe compliance library

The Bottom Line

Dutch proposal software is about to be judged on one thing: whether it can quote a system honestly across a policy change that lands in five months.

  • Put the post-2027 number in the headline. It governs twenty-five of the system’s twenty-five years. The netting period is a footnote, not the forecast.
  • Collect smart meter data at the survey. Half-hourly consumption is what makes the post-2027 estimate real rather than assumed, and Dutch coverage makes it obtainable.
FAQ

Frequently Asked Questions

What is the best solar proposal software for Dutch installers in 2026?
SurgePV, because from 1 January 2027 a Dutch proposal has to show self-consumption and export separately rather than a single netted figure, and SurgePV computes both from an 8,760-hour simulation against the customer's actual load profile. OpenSolar is widely used and free at entry but its financial logic assumes annual netting. PV*SOL models self-consumption well but is desktop-bound with a thin proposal layer.
Should proposals issued in 2026 show post-2027 numbers?
Yes, and arguably they must. A system quoted in late 2026 will spend the overwhelming majority of its 25 year life without the salderingsregeling. A payback figure calculated under netting describes roughly the first few months of ownership and nothing after that. The defensible approach is to show both scenarios side by side, with the post-2027 case as the headline and the netting period treated as a short-lived bonus.
How much does payback change when net metering ends?
Current residential payback runs roughly seven to nine years under the salderingsregeling. Published estimates put it at 12 to 17 years afterwards, depending on the feed-in compensation suppliers set and on grid fees. That is not a rounding adjustment. Any proposal carrying a pre-2027 payback for a system commissioning near the change is describing an economic reality that expires.
What are terugleverkosten and how should they appear in a quote?
Terugleverkosten are feed-in charges that several Dutch suppliers now apply to customers exporting significant volumes. They are effectively a cost per exported kWh, which can make export negative-value for some households even before 2027. A proposal that lists export as pure income will overstate the return for those customers. Show the supplier's actual terugleverkosten alongside the export credit, or the net figure will not match the customer's first bill.
Does the battery case belong in every Dutch proposal now?
For most residential customers, yes. Under netting the battery had almost no financial case because export already paid retail value. From 2027, shifting a kWh from a roughly 7 cent export to a roughly 30 cent avoided import is worth over four times the export value. That makes storage the main lever on post-2027 payback. Sizing it properly needs hourly surplus modelling rather than a rule of thumb.
Where should the load profile come from?
Smart meter data, wherever the customer can supply it. Dutch smart meter penetration is high and half-hourly consumption data is generally obtainable, which makes an accurate self-consumption estimate possible rather than assumed. Collecting it at the survey stage is the single highest-value change a Dutch installer can make to their process before January 2027, because after that date the load profile is what determines the return.
How much does solar proposal software cost in the Netherlands?
SurgePV is $1,299 to $1,899 per user per year with design, hourly simulation, battery dispatch and proposals in one license, putting a five-seat team at $6,495. OpenSolar is free at entry with per-feature add-ons. PV*SOL is a per-seat desktop licence and usually pairs with separate quoting. Aurora at $159 to $259 per user per month carries no Dutch tariff logic at all.
Akash Hirapara
Written by

Akash Hirapara CFO, Qbits Energy

CFO overseeing solar financing, procurement, and channel partner enablement at Qbits.

Related Reading
Solar Software 9 min

Solar Bid Software: Win More Deals in 2026

Solar bid software should produce a bankable proposal in under 20 minutes. Here is how SurgePV ships fast layout, yield, finance, and branded output.

Get Started

Continue your solar software research

Compare the workflow, inputs and limitations that matter to your task before choosing software.