Best Solar Proposal Software Ireland: 2026 Guide

Clean Export Guarantee rates run from 15.2 to 32 cents depending on supplier, and the SEAI grant tapers by kWp band. An Irish proposal that averages either is wrong. Six tools compared.

Akash Hirapara
Akash Hirapara CFO
August 3, 2026 Updated October 14, 2026 11 min read

An Irish solar proposal has two numbers that resist averaging. The SEAI grant tapers by kilowatt band rather than scaling with system size, so support per kilowatt falls sharply above 2 kWp and stops at 4. And the Clean Export Guarantee is set by the supplier, across a standard range running from roughly 15.2 to 32.0 cents per kWh, so the value of every exported unit varies by more than two to one depending on who the customer buys electricity from. Most proposal tools handle both as flat assumptions, which produces quotes that are wrong for nearly every household and wrong in a direction nobody can predict. This guide compares the platforms Irish installers should shortlist.

Short version. The best solar proposal software for Irish installers in 2026 is SurgePV, because it models the banded SEAI grant and supplier-specific export rates correctly and generates the customer document from the same design record. PVsyst is the bankable simulation reference with no proposal layer. Aurora is built around US net metering, which has no Irish counterpart.

For the design-side comparison see our best solar design software Ireland guide, the shading-specific treatment in solar shading analysis software Ireland, and the global solar proposal software ranking for the category without the local lens.

Quote an Irish job with the real grant band and export rate

A SurgePV engineer takes one of your addresses, applies the correct SEAI band and the customer's actual supplier export rate, and produces the branded proposal in 20 minutes.

Book a Free Demo

20 minutes · Bring a real job · No credit card

The Grant Taper Changes Where The Marginal Kilowatt Stops Paying

The SEAI structure is worth spelling out in full, because the shape is unusual.

SEAI grant by system size, grant per kWp and marginal grant on the last kWp
System sizeGrantGrant per kWpMarginal grant on the last kWp
1 kWpEUR 700EUR 700EUR 700
2 kWpEUR 1,400EUR 700EUR 700
3 kWpEUR 1,600EUR 533EUR 200
4 kWpEUR 1,800EUR 450EUR 200
6 kWpEUR 1,800EUR 300Nil

The right-hand column is the one that drives the recommendation. Going from 2 kWp to 3 kWp draws EUR 200 of support against a full kilowatt of cost. Going from 4 kWp to 6 kWp draws nothing.

This does not mean small systems are the right answer. Above the grant ceiling the marginal kilowatt has to justify itself on energy value alone, and on an Irish roof with good orientation it frequently still does, particularly for a household with high daytime consumption or an electric vehicle. The point is that the argument changes at 4 kWp, and the proposal should make that visible rather than hiding it inside an averaged discount.

Supplier Export Rates Are The Largest Unmodelled Variable

Clean Export Guarantee rates are set by suppliers, and the standard range spans roughly 15.2 to 32.0 cents per kWh. Pinergy at 25.0 cents sits near the high end of standard offerings.

A spread of more than two to one on export value is not a detail. On a system exporting several thousand kilowatt-hours a year, moving between the ends of that range changes annual revenue by hundreds of euro and shifts payback by years.

Three consequences for the document:

Ask which supplier the customer is with, before quoting. It is a one-line question that determines a headline number. Quoting a national average guarantees being wrong for almost everyone.

Say what rate you assumed. If the customer later switches supplier the payback changes, and a proposal that named its assumption survives that conversation. One that buried an average does not.

Treat switching as a recommendation, not an aside. For a household on a low export rate, moving supplier can be worth more than any hardware upgrade on the table. Saying so is unusual, credible, and costs nothing.

The EUR 400 Exemption And Its Quiet Sizing Effect

The first EUR 400 of annual export income is exempt from income tax through the end of 2028. For a typical residential system that covers a good share of export earnings, and it is worth stating plainly because customers frequently assume export income is either fully taxed or not taxed at all.

There is a second-order effect worth understanding even if it does not always belong in the customer document. Export income above EUR 400 is taxable, so the after-tax value of the marginal exported kilowatt-hour falls once a system crosses that threshold. Combined with the grant ceiling at 4 kWp, Irish residential economics have two separate points where the marginal kilowatt gets less attractive. Neither is a reason to undersize, but both belong in the model.

Connection Pathway Decides The Programme

NC6 and NC7 are not two versions of the same form.

Connection pathways NC6 and NC7 compared
NC6NC7
NatureNotificationApplication
Single-phaseBelow 6 kW at 25A6 to 50 kW
Three-phaseBelow 11 kW at 16A per phase11 to 50 kW
TimingFile at least 20 working days before installationApproval required, not automatic
Risk to programmeLowReal

The threshold matters commercially because a proposal that promises an installation date has implicitly promised a connection pathway. Below the NC6 limits that is a reasonable promise. Above it, approval is not guaranteed and the timeline is not yours to set. A proposal for a 7 kW single-phase system that quotes the same lead time as a 4 kW one is making a commitment it cannot underwrite.

What Else Belongs In The Document

Planning status, checked rather than assumed. S.I. 493/2022 exempts most rooftop installations within limits, including 15 cm maximum projection on pitched roofs and 50 cm on flat, and ground-mount to 25 square metres. Protected Structures and Architectural Conservation Areas need full permission, and that changes both cost and programme materially.

EN 50549 and RECI registration. Naming the grid protection standard and confirming the contractor is RECI-registered addresses the two questions a technically literate Irish customer asks.

A realistic diffuse-corrected yield. Irish generation modelling that uses direct-beam shading assumptions overstates shading losses and understates output. Our solar shading analysis software Ireland guide covers why.

The Six Platforms Irish Installers Should Evaluate

1. SurgePV, the integrated pick

Banded SEAI grant modelling, supplier-specific Clean Export Guarantee rates, EUR 400 exemption in the cashflow, NC6 and NC7 threshold awareness, diffuse-corrected yield, and white-label proposals with e-signature generated from the same design record. $1,299 to $1,899 per user per year.

2. PVsyst

Bankable simulation for larger commercial and ground-mount projects, frequently named by lenders. No proposal layer and no Irish incentive logic. See our PVsyst alternative review.

3. HelioScope

Capable browser-based engineering for commercial rooftops. No proposal layer, no grant or export modelling. Our HelioScope alternative guide covers the trade-offs.

4. Aurora Solar

Strong residential design built around US net metering, which Ireland does not operate. See our Aurora Solar alternative comparison.

5. Enact Solar

Reasonable financing presentation, with no Irish grant bands or supplier export libraries. See our Enact Solar alternative review.

6. Spreadsheets plus a generic yield tool

The Irish default. Flexible, and the usual home of a hard-coded grant percentage and a national average export rate.

Ireland Solar Proposal Software Comparison

Ireland solar proposal software compared by grant, export rate, exemption and connection capability
ToolBanded SEAI grantSupplier-specific export rateEUR 400 exemptionNC6/NC7 awarenessProposal from design recordPricing (per user / yr)
SurgePVYesYesYesYesYes$1,299 to $1,899
PVsystManualManualNoNoNo~EUR 500
HelioScopeNoNoNoNoNot supported$1,188 to $3,600+
Aurora SolarNoNoNoNoYes$1,908 to $3,108+
EnactManualManualManualNoPartialVaries
SpreadsheetManualManualManualManualNoEffectively free

See the same roof quoted at two export rates

SurgePV applies the customer's actual supplier rate and the correct SEAI band, so the payback in the proposal is the one the household will experience.

Book a Free Demo

20 minutes · Bring a real job · No credit card

Worked Example: 5 kWp Residential, Low Versus High Export Rate

An illustrative calculation, not a specific customer project. Inputs: 5 kWp array, roughly 4,500 kWh annual generation, 35% self-consumption, 2,925 kWh exported, SEAI grant at the EUR 1,800 maximum, identical hardware and installation in both columns.

A 5 kWp residential system at a low versus a high supplier export rate (illustrative)
LineSupplier at 15.2 cSupplier at 25.0 c
Exported2,925 kWh2,925 kWh
Gross export incomeabout EUR 445about EUR 731
Tax-exempt portionEUR 400EUR 400
Taxable export incomeabout EUR 45about EUR 331
Annual export value, broadlyabout EUR 430about EUR 620
Difference over 20 yearsbaselineroughly EUR 3,800 more

Same roof, same array, same grant, and a difference over the system life comparable to a meaningful fraction of the installation cost. Nothing in the design changed. The only variable was which supplier the household happened to be with when the proposal was written.

That is the argument for asking the question and modelling the answer. It is also, for a household on the low end, the single highest-value piece of advice in the document, and it has nothing to do with what you are selling.

Who Should Choose What

  • Choose SurgePV if you need banded grant modelling, supplier-specific export rates and proposals from the same design record.
  • Choose PVsyst where a lender names it on commercial or ground-mount work, paired with separate quoting.
  • Choose HelioScope if your team is engineering-only on commercial rooftops.
  • Avoid Aurora and Enact for Irish work. Neither models the grant taper or the export rate spread that decide the numbers here.

After signing, pipeline and follow-up sit in a CRM. QuickEstimate takes the handoff from SurgePV by API.

Grant bands and export rates, modelled properly

SEAI taper, supplier-specific Clean Export Guarantee rates, the EUR 400 exemption, NC6 and NC7 thresholds and white-label proposals from $1,299 per user per year.

Book a Free Demo

Or see pricing · Ireland compliance library

A proposal tool only earns its place inside a working stack. The wider solar software picture in Ireland covers what sits either side of it.

The Bottom Line

Irish proposals fail on two averaged numbers that should never be averaged.

  • Model the grant band, not a percentage. Support per kilowatt collapses above 2 kWp and stops at 4, and the customer should see where that happens.
  • Ask which supplier they are with. Export rates span more than two to one, and it is the largest unmodelled variable in most Irish quotes.
  • Name the connection pathway. NC6 is a notification you control, NC7 is an application you do not, and the promised timeline should reflect which one applies.
FAQ

Frequently Asked Questions

What is the best solar proposal software for Irish installers in 2026?
SurgePV, because an Irish proposal turns on two things most platforms get wrong: a grant that tapers by kWp band rather than scaling linearly, and a Clean Export Guarantee rate that varies by more than two to one between suppliers. SurgePV models both and generates the customer document from the same design record at $1,299 to $1,899 per user per year. PVsyst is the bankable simulation reference with no proposal layer. Aurora is built around US net metering, which Ireland does not have.
How does the SEAI grant taper and why does it matter for sizing?
It pays EUR 700 per kWp for the first 2 kWp and EUR 200 per kWp for the next 2, so 1 kWp draws EUR 700, 2 kWp EUR 1,400, 3 kWp EUR 1,600 and 4 kWp or more the EUR 1,800 maximum. The consequence is that grant support per kilowatt falls sharply above 2 kWp and stops entirely above 4. A proposal that treats the grant as a flat percentage of system cost will overstate support on larger systems, and a sizing recommendation that ignores the taper will misjudge where the marginal kilowatt stops being subsidised.
Why does the Clean Export Guarantee rate matter so much?
Because it varies by supplier across a standard range of roughly 15.2 to 32.0 cents per kWh, with Pinergy at 25.0 cents near the high end of standard offerings. That is more than a two to one spread on the value of every exported unit. Two identical systems on identical roofs will produce materially different returns purely on which supplier the household is with. Quoting a national average export rate is therefore wrong for almost every customer, and it is wrong in an unpredictable direction.
Should an Irish proposal mention the export income tax exemption?
Yes. The first EUR 400 of annual export income is exempt from income tax through the end of 2028. For a typical residential system that covers a substantial share of export earnings, and stating it removes a tax question the customer would otherwise raise or, worse, discover later. It also has a sizing implication worth noting honestly: export income above EUR 400 is taxable, which slightly reduces the after-tax value of the marginal exported kilowatt-hour on larger systems.
What is the difference between NC6 and NC7 and when does it change the quote?
NC6 is a notification, applying to single-phase systems below 6 kW at 25A or three-phase below 11 kW at 16A per phase, and the form must be filed at least 20 working days before installation. NC7 is a mini-generation application for single-phase 6 to 50 kW or three-phase 11 to 50 kW, and it is an application rather than a notification, so approval is not automatic. Crossing that threshold changes the programme and the risk profile, and a proposal that promises a timeline without saying which pathway applies is promising something it cannot control.
Does Irish rooftop solar need planning permission?
Usually not. Under S.I. 493/2022 rooftop solar is planning exempt subject to limits, including a maximum projection of 15 cm on pitched roofs and 50 cm on flat roofs, with ground-mount exempt up to 25 square metres, 2 metres in height and 2 metres from boundaries. The exceptions matter though. Protected Structures and buildings in Architectural Conservation Areas require full planning permission, and a proposal for one of those properties that assumes exemption is understating both cost and timeline.
How much does solar proposal software cost in Ireland?
SurgePV is $1,299 to $1,899 per user per year with design and proposals in one license, so a five-seat team pays $6,495. PVsyst is a per-seat desktop licence around EUR 500 with no proposal layer. Aurora runs $159 to $259 per user per month with no Irish grant or export logic. Against the cost of a grant band misquoted across a season of sales, the licence is the smaller number.
Akash Hirapara
Written by

Akash Hirapara CFO, Qbits Energy

CFO overseeing solar financing, procurement, and channel partner enablement at Qbits.

Related Reading
Solar Software 11 min

Best Solar Design Software Ireland: 2026 Guide

The best solar design software Ireland installers need handles NC6 and NC7 thresholds, SEAI grant tapering and a Clean Export Guarantee that varies two-fold by supplier.

Get Started

Continue your solar software research

Compare the workflow, inputs and limitations that matter to your task before choosing software.